WALLACE "A"

Operated by VALENCE OPERATING COMPANY (P-5 881167) in the BECKVILLE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214510District 06Field 066485002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.0 M
Aug 2005 – Sep 2015
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
122
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 503 leases and 503 wells, and the rule below applies to all of them.

Discovered
1974-05-21
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2015-02-24.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-05-03168202
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition848 bbl$57,911
GasProduction287,089 Mcf$1,984,606
Total$2,042,517

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2682, -94.5902. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.26819, -94.59021 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,600 ft.

Completions filed
Jun 2022
1 of 1 wells

1 well

42-40133561110,600 ftJun 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (122)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

122 months

Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20158056.152.88$449
May 20150055.212.96$0
Apr 20150749.822.71$19
Mar 2015029642.892.93$869
Feb 2015040144.662.98$1,193
Jan 2015063343.433.10$1,963
Dec 2014036254.693.59$1,300
Nov 2014036670.464.25$1,556
Oct 2014032678.303.90$1,272
Sep 2014040886.164.05$1,651
Aug 2014090289.394.04$3,640
Jul 201401,43896.564.18$6,010
Jun 2014045898.164.74$2,169
May 2014027794.734.73$1,309
Apr 2014054295.944.81$2,607
Mar 2014069395.895.06$3,504
Feb 2014089997.406.19$5,567
Jan 2014074090.404.86$3,597
Dec 2013085091.824.35$3,701
Nov 2013073488.853.74$2,744
Oct 2013080697.423.78$3,046
Sep 20130899104.113.72$3,342
Aug 201301,143104.253.52$4,026
Jul 201301,176102.523.72$4,372
Jun 201301,23794.403.93$4,866
May 201301,36694.834.15$5,668
Apr 201301,65793.964.28$7,096
Mar 201301,45493.623.91$5,689
Feb 201301,44791.233.42$4,949
Jan 201301,45491.603.42$4,973
Dec 2012331,46686.773.42$7,877
Nov 2012161,55786.953.62$7,035
Oct 201201,45389.383.40$4,940
Sep 201201,41994.672.92$4,141
Aug 201201,38992.662.91$4,039
Jul 201201,13585.133.02$3,429
Jun 201201,11979.822.52$2,819
May 201201,27691.612.49$3,175
Apr 201201,024101.652.00$2,045
Mar 201201,261105.052.22$2,802
Feb 201201,205101.102.57$3,097
Jan 201201,13498.092.73$3,100
Dec 201101,19296.873.24$3,862
Nov 201101,04495.723.31$3,457
Oct 201101,35384.983.65$4,936
Sep 2011211,54083.623.99$7,894
Aug 201101,37683.404.15$5,709
Jul 201101,50094.144.52$6,776
Jun 201101,99192.904.64$9,238
May 2011281,21298.134.40$8,086
Apr 201101,242105.964.33$5,382
Mar 201101,28296.364.06$5,202
Feb 201101,21085.644.18$5,058
Jan 201101,41286.504.59$6,479
Dec 201001,44985.734.35$6,300
Nov 201001,61980.843.80$6,145
Oct 201001,55178.103.51$5,442
Sep 201001,52272.633.98$6,057
Aug 2010491,60673.684.42$10,708
Jul 201001,66272.554.74$7,872
Jun 201001,64370.364.91$8,068
May 201001,91571.124.24$8,110
Apr 201001,99381.694.12$8,217
Mar 201002,47178.394.39$10,844
Feb 201002,16173.585.44$11,761
Jan 201002,42974.365.96$14,487
Dec 200902,41371.445.48$13,232
Nov 200902,35474.593.75$8,831
Oct 2009562,93072.544.11$16,105
Sep 200902,01265.543.06$6,166
Aug 200902,33767.423.22$7,522
Jul 200902,53461.133.46$8,779
Jun 200902,47166.163.90$9,625
May 200902,54554.743.93$9,991
Apr 200902,49846.773.59$8,962
Mar 200902,68942.144.06$10,915
Feb 200902,23432.814.63$10,350
Jan 2009262,61135.865.37$14,956
Dec 200802,77437.105.98$16,581
Nov 200802,96955.496.86$20,368
Oct 200802,91775.246.92$20,191
Sep 200802,911101.767.88$22,930
Aug 200803,200114.228.48$27,146
Jul 200803,299131.0811.39$37,574
Jun 200803,115131.3313.03$40,597
May 200803,355123.1711.57$38,832
Apr 200802,950110.3110.45$30,842
Mar 2008523,205101.909.66$36,272
Feb 200802,79292.538.77$24,487
Jan 200802,88690.388.21$23,682
Dec 200703,18488.337.30$23,249
Nov 2007533,24691.677.29$28,527
Oct 200703,37482.856.92$23,355
Sep 200703,38175.846.24$21,112
Aug 200703,53069.066.39$22,549
Jul 200703,61770.906.39$23,105
Jun 200703,51462.007.55$26,525
May 2007753,82958.747.85$34,449
Apr 200703,90359.617.81$30,464
Mar 2007414,31756.927.30$33,856
Feb 200703,55255.108.22$29,183
Jan 200704,55250.306.73$30,621
Dec 200604,57456.656.92$31,645
Nov 200604,39354.207.62$33,464
Oct 2006114,97854.906.01$30,541
Sep 200604,95660.085.04$24,964
Aug 200602,68968.717.34$19,737
Jul 2006862,81369.376.34$23,808
Jun 2006255,72366.286.38$38,192
May 200666,29666.016.42$40,848
Apr 200605,98064.397.36$44,016
Mar 2006986,34556.707.08$50,498
Feb 200606,32457.597.75$49,018
Jan 200602,03560.598.93$18,179
Dec 2005777,04854.9413.42$98,782
Nov 2005828,40454.6910.59$93,469
Oct 200509,49858.3413.80$131,032
Sep 2005211,20361.4512.08$135,444
Aug 200537,04661.519.80$69,213

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2015 — as filed, then multipliedworked
Condensate             8 bbl  × $ 56.15 =       $449
Gas                    0 Mcf  × $  2.88 =         $0

────────────────────────────────────────────────────
Month total                                     $449

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/214510 is the state's own key, not one this site invented.