WOODS, MILTON GAS UNIT

Operated by TIPCO OPERATING CO. (P-5 860800) in the WOODLAWN (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216239District 06Field 98563800CondensateGasSaveExport
Value, all time
$4.4 M
Nov 2005 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
247
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 79 leases and 79 wells, and the rule below applies to all of them.

Discovered
1980-02-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: EFFECTIVE DATE 10/22/13.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,801 bbl$261,752
GasProduction710,711 Mcf$4,163,479
Total$4,425,231

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6140, -94.3859. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.61402, -94.38593 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,100 ft.

Completions filed
Nov 2005
1 of 1 wells

1 well

42-2033322727,100 ftNov 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (247)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

247 months

May 2026010106.413.05$30
Apr 202602498.932.87$69
Mar 2026011589.753.15$362
Feb 202609563.503.75$356
Jan 2026022259.138.00$1,776
Dec 202505856.664.41$256
Nov 202504558.593.93$177
Oct 202505059.383.30$165
Sep 2025014662.743.08$449
Aug 2025014463.933.01$434
Jul 2025017266.743.32$570
Jun 202508366.483.13$260
May 2025012060.553.23$388
Apr 2025017662.363.54$624
Mar 2025030067.704.27$1,281
Feb 202506570.884.34$282
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 2024015069.052.20$330
Oct 2024031871.372.28$725
Sep 2024028769.612.36$679
Aug 2024041375.632.06$852
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 2024028784.451.66$476
Mar 2024046080.301.55$711
Feb 2024025076.091.78$446
Jan 2024036273.023.30$1,194
Dec 2023043871.262.61$1,144
Nov 2023046177.892.81$1,294
Oct 2023037585.443.09$1,158
Sep 2023034589.042.74$944
Aug 2023036280.522.67$968
Jul 2023052574.852.64$1,387
Jun 20230068.962.26$0
May 2023038570.622.23$858
Apr 2023025878.122.24$577
Mar 2023028372.852.39$677
Feb 2023043175.112.47$1,063
Jan 2023041576.533.39$1,406
Dec 2022018376.415.73$1,048
Nov 2022036285.005.65$2,044
Oct 2022048787.185.86$2,856
Sep 2022063484.888.16$5,176
Aug 2022063894.529.13$5,823
Jul 20220532101.587.54$4,012
Jun 2022022115.097.98$176
May 20220657109.378.43$5,541
Apr 20220610104.226.84$4,171
Mar 20220224108.885.08$1,137
Feb 202201,07891.054.86$5,238
Jan 2022066281.844.54$3,004
Dec 2021062971.323.90$2,453
Nov 2021061977.435.24$3,242
Oct 2021801,33579.795.71$14,011
Sep 20210069.865.35$0
Aug 202102,97666.024.22$12,560
Jul 202102,78670.783.98$11,094
Jun 2021068969.493.38$2,329
May 202102,62863.483.02$7,930
Apr 202101,67760.362.76$4,626
Mar 2021075261.302.72$2,043
Feb 202102,73457.805.55$15,168
Jan 20210050.412.81$0
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200139.982.39$2
Jul 20200138.371.83$2
Jun 20200234.901.69$3
May 20200216.921.81$4
Apr 20200214.751.80$4
Mar 20200630.341.86$11
Feb 2020022349.881.98$442
Jan 2020045057.252.09$943
Dec 2019040259.012.30$926
Nov 2019050255.302.75$1,381
Oct 201901,34953.472.42$3,263
Sep 201901,36755.052.66$3,633
Aug 201901,36753.112.30$3,150
Jul 201901,34756.272.46$3,314
Jun 201901,22452.782.49$3,049
May 20191161,64858.482.74$11,300
Apr 201901,64462.632.75$4,522
Mar 201901,66456.803.06$5,095
Feb 201901,59650.852.79$4,456
Jan 20191671,77546.033.23$13,417
Dec 201801,80946.594.19$7,571
Nov 201801,51052.934.24$6,398
Oct 2018096061.443.40$3,262
Sep 2018066259.543.11$2,058
Aug 201801,52559.403.07$4,677
Jul 201801,58865.142.93$4,656
Jun 201801,39060.183.08$4,277
May 201801,55065.382.90$4,496
Apr 201803,13563.842.90$9,094
Mar 201803,07161.222.79$8,558
Feb 20181732,57861.782.77$17,819
Jan 201802,81362.874.01$11,278
Dec 201703,23657.272.92$9,454
Nov 201701,74255.423.12$5,432
Oct 201702,85249.292.98$8,509
Sep 201701,73547.523.09$5,356
Aug 201701,26245.373.00$3,792
Jul 201701,84543.873.09$5,696
Jun 201701,88842.493.09$5,829
May 201701,99345.373.26$6,504
Apr 201702,02047.933.21$6,487
Mar 201702,07946.772.98$6,203
Feb 201701,88050.452.95$5,551
Jan 201701,80749.413.42$6,178
Dec 201601,46748.763.72$5,461
Nov 201602,04142.492.64$5,397
Oct 201602,13046.193.09$6,582
Sep 201602,00541.553.10$6,217
Aug 201601,93541.442.92$5,659
Jul 201601,82441.622.92$5,334
Jun 201601,69345.352.69$4,547
May 201601,81842.521.99$3,620
Apr 201601,55736.561.99$3,100
Mar 201601,62133.011.79$2,908
Feb 201601,57326.472.06$3,246
Jan 201601,66127.352.36$3,927
Dec 201501,69132.362.00$3,384
Nov 201501,58638.792.17$3,437
Oct 201501,74743.552.43$4,239
Sep 201501,74842.992.76$4,822
Aug 201501,80340.162.87$5,179
Jul 201501,68848.152.95$4,971
Jun 201501,71356.152.88$4,938
May 201501,71255.212.96$5,060
Apr 20151771,74349.822.71$13,536
Mar 2015077842.892.93$2,283
Feb 201501,42744.662.98$4,247
Jan 201501,56643.433.10$4,856
Dec 201402,25954.693.59$8,113
Nov 201402,08470.464.25$8,861
Oct 201402,87278.303.90$11,204
Sep 201402,25886.164.05$9,135
Aug 201402,73789.394.04$11,044
Jul 201402,62396.564.18$10,963
Jun 201402,78198.164.74$13,173
May 201402,70794.734.73$12,795
Apr 201402,55495.944.81$12,282
Mar 201402,60995.895.06$13,193
Feb 20141712,43997.406.19$31,758
Jan 201401,96790.404.86$9,561
Dec 201302,58191.824.35$11,239
Nov 201302,56888.853.74$9,600
Oct 201302,61797.423.78$9,891
Sep 201302,753104.113.72$10,235
Aug 201302,434104.253.52$8,574
Jul 201301,547102.523.72$5,751
Jun 201301,40294.403.93$5,515
May 20131682,08894.834.15$24,595
Apr 201302,03793.964.28$8,724
Mar 20131752,25993.623.91$25,223
Feb 201302,03191.233.42$6,946
Jan 201302,56591.603.42$8,772
Dec 201202,50586.773.42$8,568
Nov 201202,69486.953.62$9,766
Oct 201202,95789.383.40$10,053
Sep 201202,23694.672.92$6,526
Aug 201201,93092.662.91$5,613
Jul 201202,34185.133.02$7,072
Jun 201201,64279.822.52$4,136
May 201202,33591.612.49$5,810
Apr 201201,791101.652.00$3,576
Mar 201202,196105.052.22$4,880
Feb 201202,226101.102.57$5,721
Jan 201202,70598.092.73$7,396
Dec 201103,02296.873.24$9,790
Nov 201102,94395.723.31$9,745
Oct 201103,14784.983.65$11,482
Sep 201103,14983.623.99$12,551
Aug 201103,23883.404.15$13,436
Jul 201103,34594.144.52$15,110
Jun 201103,11692.904.64$14,458
May 20111383,40398.134.40$28,532
Apr 201103,323105.964.33$14,399
Mar 201103,86896.364.06$15,694
Feb 201102,94985.644.18$12,327
Jan 201103,15186.504.59$14,459
Dec 201003,33985.734.35$14,517
Nov 20101753,48380.843.80$27,366
Oct 201003,68478.103.51$12,927
Sep 201003,67572.633.98$14,625
Aug 201003,88173.684.42$17,152
Jul 201003,45672.554.74$16,369
Jun 201003,47770.364.91$17,073
May 201003,68171.124.24$15,590
Apr 201003,78881.694.12$15,617
Mar 201003,70778.394.39$16,269
Feb 201003,63773.585.44$19,794
Jan 20101793,98974.365.96$37,101
Dec 200904,42171.445.48$24,244
Nov 200904,41274.593.75$16,552
Oct 200904,80672.544.11$19,754
Sep 200904,35065.543.06$13,332
Aug 200903,12267.423.22$10,048
Jul 200903,27761.133.46$11,353
Jun 200902,93466.163.90$11,428
May 200903,15354.743.93$12,378
Apr 200903,50646.773.59$12,578
Mar 200903,61842.144.06$14,685
Feb 200902,32332.814.63$10,762
Jan 200903,78035.865.37$20,302
Dec 200803,77737.105.98$22,576
Nov 200804,38255.496.86$30,062
Oct 20081694,59175.246.92$44,494
Sep 200803,728101.767.88$29,366
Aug 200804,151114.228.48$35,213
Jul 200804,498131.0811.39$51,230
Jun 200805,808131.3313.03$75,694
May 200806,194123.1711.57$71,691
Apr 200806,379110.3110.45$66,692
Mar 200806,687101.909.66$64,624
Feb 20081376,55692.538.77$70,177
Jan 200806,81690.388.21$55,930
Dec 200707,06388.337.30$51,574
Nov 200707,43291.677.29$54,192
Oct 200707,67282.856.92$53,105
Sep 200707,63175.846.24$47,649
Aug 20071708,82369.066.39$68,101
Jul 200707,14770.906.39$45,655
Jun 200705,64962.007.55$42,641
May 200707,30458.747.85$57,309
Apr 200707,58559.617.81$59,202
Mar 200708,73156.927.30$63,754
Feb 200708,34955.108.22$68,595
Jan 20071658,51150.306.73$65,552
Dec 200614510,46156.656.92$80,588
Nov 2006012,42254.207.62$94,624
Oct 2006013,82754.906.01$83,153
Sep 200614710,55360.085.04$61,989
Aug 2006015,02268.717.34$110,260
Jul 200613611,78069.376.34$84,152
Jun 2006012,24166.286.38$78,145
May 200616118,49966.016.42$129,484
Apr 2006017,50964.397.36$128,875
Mar 200635119,33056.707.08$156,815
Feb 200617221,64557.597.75$177,678
Jan 200617723,54860.598.93$221,086
Dec 200515222,35054.9413.42$308,185
Nov 20050054.6910.59$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   10 Mcf  × $  3.05 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/216239 is the state's own key, not one this site invented.