Operated by TEXIAN OPERATING COMPANY, LLC (P-5 848681) in the DOUGLASS, W. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216451District 06Field 258644712 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.3 M
Nov 2005 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
247
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 423 leases and 423 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: AND NACOGDOCHES, E. (JAMES LIME).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-31169477
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,073 bbl$76,195
GasProduction480,925 Mcf$3,199,682
Total$3,275,876

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6632, -94.8130. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.66324, -94.81295 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,740 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,740 ft.

1 well

42-347321244310,740 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (247)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

247 months

May 20260159106.413.05$484
Apr 2026016598.932.87$474
Mar 2026011289.753.15$353
Feb 2026030863.503.75$1,155
Jan 2026016859.138.00$1,344
Dec 2025034756.664.41$1,531
Nov 2025023558.593.93$923
Oct 2025016359.383.30$539
Sep 2025010862.743.08$332
Aug 2025010963.933.01$329
Jul 2025037466.743.32$1,240
Jun 202501,35366.483.13$4,233
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20238072.852.39$583
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190353.112.30$7
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 2019026750.852.79$746
Jan 2019043546.033.23$1,404
Dec 2018070946.594.19$2,967
Nov 2018057452.934.24$2,432
Oct 20180261.443.40$7
Sep 2018015259.543.11$472
Aug 2018021559.403.07$659
Jul 2018025765.142.93$753
Jun 2018025860.183.08$794
May 2018028465.382.90$824
Apr 2018030263.842.90$876
Mar 2018021161.222.79$588
Feb 2018020061.782.77$553
Jan 2018053862.874.01$2,157
Dec 2017854157.272.92$2,039
Nov 2017062355.423.12$1,943
Oct 2017028549.292.98$850
Sep 2017055647.523.09$1,717
Aug 2017029445.373.00$883
Jul 20170043.873.09$0
Jun 2017093942.493.09$2,899
May 2017051045.373.26$1,664
Apr 2017048847.933.21$1,567
Mar 2017035946.772.98$1,071
Feb 2017059950.452.95$1,769
Jan 201701,14749.413.42$3,921
Dec 201602,37048.763.72$8,823
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 2016066027.352.36$1,560
Dec 201501,13632.362.00$2,274
Nov 201501,06438.792.17$2,306
Oct 201501,17543.552.43$2,851
Sep 201501,14242.992.76$3,150
Aug 201501,17140.162.87$3,364
Jul 201501,14648.152.95$3,375
Jun 201501,18556.152.88$3,416
May 20151891255.212.96$3,689
Apr 2015063949.822.71$1,730
Mar 2015086342.892.93$2,533
Feb 2015081244.662.98$2,417
Jan 2015098743.433.10$3,060
Dec 2014090054.693.59$3,232
Nov 2014221,07670.464.25$6,125
Oct 2014084678.303.90$3,300
Sep 201401,34686.164.05$5,445
Aug 201401,41689.394.04$5,714
Jul 201401,40396.564.18$5,864
Jun 201401,40198.164.74$6,636
May 201401,49494.734.73$7,061
Apr 201401,46095.944.81$7,021
Mar 201401,55995.895.06$7,884
Feb 2014161,48297.406.19$10,735
Jan 201401,68490.404.86$8,185
Dec 201301,40591.824.35$6,118
Nov 201301,24888.853.74$4,665
Oct 201301,39197.423.78$5,257
Sep 201301,375104.113.72$5,112
Aug 201301,638104.253.52$5,770
Jul 201301,369102.523.72$5,090
Jun 201301,30394.403.93$5,125
May 201301,35594.834.15$5,622
Apr 201301,52993.964.28$6,548
Mar 201301,27893.623.91$5,001
Feb 201301,45291.233.42$4,966
Jan 201301,56191.603.42$5,338
Dec 201201,53086.773.42$5,233
Nov 201201,42786.953.62$5,173
Oct 201201,73489.383.40$5,895
Sep 201201,59394.672.92$4,649
Aug 201201,95092.662.91$5,671
Jul 201201,91585.133.02$5,785
Jun 201201,71979.822.52$4,330
May 201201,85491.612.49$4,613
Apr 201201,912101.652.00$3,818
Mar 2012662,096105.052.22$11,591
Feb 201201,643101.102.57$4,223
Jan 201201,98398.092.73$5,422
Dec 201102,09996.873.24$6,800
Nov 201102,09895.723.31$6,947
Oct 201102,03884.983.65$7,436
Sep 201102,02683.623.99$8,075
Aug 201102,22583.404.15$9,232
Jul 201102,04194.144.52$9,220
Jun 201102,30392.904.64$10,686
May 201102,14498.134.40$9,444
Apr 201102,242105.964.33$9,715
Mar 201102,35396.364.06$9,547
Feb 201102,11785.644.18$8,849
Jan 201102,47086.504.59$11,334
Dec 201002,53485.734.35$11,017
Nov 201002,31480.843.80$8,782
Oct 2010482,51678.103.51$12,577
Sep 201002,53672.633.98$10,092
Aug 201002,70973.684.42$11,972
Jul 201002,34272.554.74$11,093
Jun 201012,69570.364.91$13,304
May 201002,45171.124.24$10,381
Apr 201002,71481.694.12$11,189
Mar 201002,72578.394.39$11,959
Feb 201002,62573.585.44$14,286
Jan 201003,00474.365.96$17,916
Dec 200903,05071.445.48$16,725
Nov 200902,75774.593.75$10,343
Oct 200903,30472.544.11$13,580
Sep 200902,88965.543.06$8,854
Aug 200903,35567.423.22$10,798
Jul 200903,46261.133.46$11,994
Jun 200903,35466.163.90$13,064
May 200903,42454.743.93$13,442
Apr 200903,37446.773.59$12,104
Mar 200903,56842.144.06$14,483
Feb 200903,12632.814.63$14,483
Jan 2009653,71535.865.37$22,284
Dec 200803,78537.105.98$22,623
Nov 200803,59755.496.86$24,677
Oct 200803,82375.246.92$26,463
Sep 200803,577101.767.88$28,176
Aug 200804,003114.228.48$33,958
Jul 200813,883131.0811.39$44,356
Jun 200803,746131.3313.03$48,820
May 200814,231123.1711.57$49,094
Apr 200824,186110.3110.45$43,985
Mar 20081234,495101.909.66$55,974
Feb 200814,38892.538.77$38,578
Jan 200814,81190.388.21$39,568
Dec 200704,88388.337.30$35,656
Nov 2007894,59591.677.29$41,664
Oct 200715,02682.856.92$34,873
Sep 200715,13375.846.24$32,127
Aug 200715,52869.066.39$35,382
Jul 200735,70170.906.39$36,630
Jun 200715,70862.007.55$43,149
May 200726,07058.747.85$47,744
Apr 2007985,98359.617.81$52,540
Mar 200726,41356.927.30$46,941
Feb 200706,15155.108.22$50,537
Jan 200717,36350.306.73$49,580
Dec 200617,07656.656.92$49,012
Nov 2006677,29254.207.62$59,178
Oct 200607,99654.906.01$48,086
Sep 200618,10360.085.04$40,877
Aug 2006908,84068.717.34$71,069
Jul 200609,68469.376.34$61,423
Jun 2006010,00966.286.38$63,896
May 2006211,41366.016.42$73,461
Apr 200614011,89564.397.36$96,568
Mar 2006013,29856.707.08$94,189
Feb 200613613,66357.597.75$113,736
Jan 2006316,99760.598.93$152,021
Dec 2005323,90454.9413.42$320,847
Nov 20055033,03954.6910.59$352,565

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  159 Mcf  × $  3.05 =       $484

────────────────────────────────────────────────────
Month total                                     $484

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/216451 is the state's own key, not one this site invented.