POWERS, BILL

Operated by XTO ENERGY INC. (P-5 945936) in the CARTHAGE, S. (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216830District 06Field 160372002 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.7 M
Dec 2005 – May 2026
Value, last 12 filed months
$38 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 101 leases and 101 wells, and the rule below applies to all of them.

Discovered
1978-02-20
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/97.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-31166779
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition9,548 bbl$629,290
GasProduction674,424 Mcf$4,065,701
Total$4,694,992

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1240, -94.4960. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.12398, -94.49601 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,190 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,190 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-36535823710,190 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 202601,408106.413.05$4,289
Apr 2026082098.932.87$2,353
Mar 2026040689.753.15$1,279
Feb 2026074163.503.75$2,779
Jan 2026025959.138.00$2,071
Dec 202503956.664.41$172
Nov 20256417858.593.93$4,449
Oct 202501,16359.383.30$3,844
Sep 202501,30262.743.08$4,006
Aug 202501,30363.933.01$3,928
Jul 20256470566.743.32$6,609
Jun 2025074266.483.13$2,322
May 2025060860.553.23$1,965
Apr 202501,47162.363.54$5,212
Mar 202510382767.704.27$10,503
Feb 2025070470.884.34$3,056
Jan 202501,29974.324.28$5,558
Dec 20241041,32768.993.12$11,317
Nov 2024094869.052.20$2,084
Oct 20248291171.372.28$7,931
Sep 2024097869.612.36$2,312
Aug 20241041,28175.632.06$10,509
Jul 202401,37079.932.15$2,941
Jun 2024851,03878.082.63$9,371
May 2024096178.812.20$2,113
Apr 202401,34184.451.66$2,225
Mar 2024801,30880.301.55$8,445
Feb 202401,29076.091.78$2,301
Jan 2024801,17073.023.30$9,700
Dec 202301,04371.262.61$2,723
Nov 20237094977.892.81$8,117
Oct 202301,03785.443.09$3,202
Sep 2023761,11089.042.74$9,803
Aug 202301,01480.522.67$2,710
Jul 202301,00674.852.64$2,658
Jun 202301,10668.962.26$2,498
May 20237075870.622.23$6,632
Apr 202301,19978.122.24$2,683
Mar 20236793272.852.39$7,111
Feb 202301,01275.112.47$2,495
Jan 2023741,20976.533.39$9,759
Dec 202201,06376.415.73$6,090
Nov 2022561,16885.005.65$11,355
Oct 2022069687.185.86$4,081
Sep 202201,21984.888.16$9,952
Aug 20224898694.529.13$13,536
Jul 20220515101.587.54$3,884
Jun 20220448115.097.98$3,574
May 20220482109.378.43$4,065
Apr 2022591,286104.226.84$14,942
Mar 20220782108.885.08$3,970
Feb 20227966591.054.86$10,424
Jan 2022099281.844.54$4,501
Dec 2021571,09071.323.90$8,315
Nov 2021047977.435.24$2,508
Oct 20214142879.795.71$5,717
Sep 2021049669.865.35$2,654
Aug 20214232866.024.22$4,157
Jul 20217646270.783.98$7,219
Jun 2021053269.493.38$1,798
May 2021052563.483.02$1,584
Apr 2021017860.362.76$491
Mar 2021811,03661.302.72$7,780
Feb 2021084657.805.55$4,694
Jan 2021701,02750.412.81$6,415
Dec 2020521,30844.642.68$5,821
Nov 202001,19238.772.71$3,226
Oct 20204092036.972.48$3,759
Sep 2020044437.091.99$884
Aug 20204198639.982.39$3,991
Jul 202001,22238.371.83$2,230
Jun 2020092534.901.69$1,564
May 2020431,18716.921.81$2,882
Apr 202001,01814.751.80$1,837
Mar 2020471,40030.341.86$4,025
Feb 202001,43149.881.98$2,834
Jan 2020431,49657.252.09$5,595
Dec 201901,05759.012.30$2,436
Nov 20194973755.302.75$4,737
Oct 201901,15453.472.42$2,791
Sep 201901,48255.052.66$3,938
Aug 2019481,48153.112.30$5,962
Jul 201901,64056.272.46$4,035
Jun 2019491,44952.782.49$6,196
May 2019431,33458.482.74$6,170
Apr 2019371,20962.632.75$5,643
Mar 2019091156.803.06$2,790
Feb 2019421,25450.852.79$5,637
Jan 201901,21646.033.23$3,925
Dec 2018421,11746.594.19$6,632
Nov 2018088352.934.24$3,741
Oct 2018401,04861.443.40$6,019
Sep 201801,05159.543.11$3,267
Aug 2018291,15659.403.07$5,268
Jul 2018037965.142.93$1,111
Jun 20181853960.183.08$2,742
May 2018078065.382.90$2,263
Apr 2018201,09463.842.90$4,450
Mar 201801,30861.222.79$3,645
Feb 2018221,27661.782.77$4,889
Jan 201801,55062.874.01$6,214
Dec 2017231,41057.272.92$5,437
Nov 2017151,42555.423.12$5,275
Oct 201701,12549.292.98$3,357
Sep 2017141,44547.523.09$5,126
Aug 2017171,30345.373.00$4,686
Jul 2017085343.873.09$2,633
Jun 2017211,09342.493.09$4,267
May 2017321,02245.373.26$4,787
Apr 2017221,54547.933.21$6,016
Mar 201701,32046.772.98$3,938
Feb 2017241,39550.452.95$5,330
Jan 2017191,57649.413.42$6,327
Dec 2016181,32148.763.72$5,796
Nov 201601,62042.492.64$4,284
Oct 2016151,63246.193.09$5,736
Sep 201601,53241.553.10$4,750
Aug 2016131,79641.442.92$5,791
Jul 201691,22041.622.92$3,942
Jun 201601,24945.352.69$3,355
May 201681,88442.521.99$4,091
Apr 201601,57136.561.99$3,128
Mar 2016131,52233.011.79$3,160
Feb 2016131,35026.472.06$3,130
Jan 2016231,16227.352.36$3,376
Dec 2015311,65032.362.00$4,305
Nov 201501,32338.792.17$2,867
Oct 2015211,72943.552.43$5,110
Sep 201501,18542.992.76$3,269
Aug 2015231,56940.162.87$5,431
Jul 201501,50948.152.95$4,444
Jun 2015241,21356.152.88$4,845
May 201501,59255.212.96$4,705
Apr 2015151,69449.822.71$5,332
Mar 201501,56942.892.93$4,605
Feb 2015271,02144.662.98$4,245
Jan 2015121,33143.433.10$4,648
Dec 201402,08654.693.59$7,492
Nov 2014231,43970.464.25$7,739
Oct 201401,34478.303.90$5,243
Sep 201401,31486.164.05$5,316
Aug 2014111,25289.394.04$6,035
Jul 2014121,35096.564.18$6,801
Jun 201401,67898.164.74$7,948
May 2014171,53694.734.73$8,870
Apr 201401,67395.944.81$8,046
Mar 2014171,42995.895.06$8,856
Feb 2014211,62697.406.19$12,114
Jan 2014421,83790.404.86$12,726
Dec 2013211,90691.824.35$10,228
Nov 201301,68988.853.74$6,314
Oct 2013231,45497.423.78$7,736
Sep 201301,756104.113.72$6,528
Aug 2013232,499104.253.52$11,201
Jul 2013291,649102.523.72$9,104
Jun 201301,72294.403.93$6,773
May 2013212,58794.834.15$12,725
Apr 201302,56393.964.28$10,976
Mar 2013212,52393.623.91$11,838
Feb 201302,38591.233.42$8,156
Jan 2013391,97091.603.42$10,310
Dec 201201,51886.773.42$5,192
Nov 2012231,56286.953.62$7,662
Oct 2012231,65889.383.40$7,692
Sep 2012212,38394.672.92$8,943
Aug 201202,57592.662.91$7,489
Jul 2012171,43385.133.02$5,776
Jun 2012883579.822.52$2,742
May 201251,56091.612.49$4,340
Apr 201201,739101.652.00$3,472
Mar 201201,411105.052.22$3,135
Feb 201201,918101.102.57$4,930
Jan 201203,09098.092.73$8,448
Dec 201102,97696.873.24$9,641
Nov 201101,98195.723.31$6,560
Oct 201102,03484.983.65$7,421
Sep 201102,14683.623.99$8,554
Aug 201112,27783.404.15$9,531
Jul 201102,12894.144.52$9,613
Jun 201102,33792.904.64$10,843
May 201101,49998.134.40$6,603
Apr 201101,416105.964.33$6,136
Mar 201101,45496.364.06$5,899
Feb 201101,39285.644.18$5,819
Jan 201101,52086.504.59$6,975
Dec 201001,53385.734.35$6,665
Nov 201001,32880.843.80$5,040
Oct 201061,47178.103.51$5,630
Sep 201092,04972.633.98$8,808
Aug 201013,13673.684.42$13,933
Jul 201093,44472.554.74$16,965
Jun 201092,57070.364.91$13,253
May 201092,62971.124.24$11,774
Apr 201092,20081.694.12$9,805
Mar 2010162,18978.394.39$10,861
Feb 201072,09173.585.44$11,895
Jan 2010111,40274.365.96$9,180
Dec 2009152,66271.445.48$15,669
Nov 2009133,20374.593.75$12,986
Oct 2009273,02372.544.11$14,384
Sep 2009112,71365.543.06$9,036
Aug 2009132,48867.423.22$8,884
Jul 2009132,56561.133.46$9,681
Jun 2009222,44266.163.90$10,967
May 20091113,62354.743.93$20,299
Apr 2009671,83746.773.59$9,724
Mar 20090042.144.06$0
Feb 200909032.814.63$417
Jan 2009654,63735.865.37$27,236
Dec 20081123,23837.105.98$23,509
Nov 2008303,72955.496.86$27,247
Oct 2008252,95675.246.92$22,342
Sep 2008252,619101.767.88$23,174
Aug 2008573,286114.228.48$34,386
Jul 2008583,855131.0811.39$51,509
Jun 2008504,439131.3313.03$64,418
May 2008804,954123.1711.57$67,193
Apr 2008515,299110.3110.45$61,026
Mar 2008624,685101.909.66$51,594
Feb 2008605,03392.538.77$49,694
Jan 2008875,26990.388.21$51,099
Dec 2007785,71788.337.30$48,635
Nov 2007475,79691.677.29$46,571
Oct 2007806,60982.856.92$52,375
Sep 2007826,13375.846.24$44,514
Aug 2007796,50769.066.39$47,022
Jul 2007826,96770.906.39$50,319
Jun 2007496,66362.007.55$53,333
May 20071187,62758.747.85$66,775
Apr 2007938,59959.617.81$72,661
Mar 2007869,91456.927.30$77,287
Feb 2007679,76055.108.22$83,880
Jan 20076510,43450.306.73$73,457
Dec 20065311,64456.656.92$83,561
Nov 20068812,09454.207.62$96,895
Oct 200613013,97554.906.01$91,180
Sep 200620414,12560.085.04$83,407
Aug 200623415,55768.717.34$130,265
Jul 200620415,99969.376.34$115,629
Jun 200627316,80566.286.38$125,376
May 200630819,16366.016.42$143,453
Apr 200631017,84264.397.36$151,287
Mar 200644519,97056.707.08$166,677
Feb 200649821,98657.597.75$199,096
Jan 200671530,07460.598.93$311,983
Dec 200571332,27654.9413.42$472,168

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,408 Mcf  × $  3.05 =     $4,289

────────────────────────────────────────────────────
Month total                                   $4,289

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/216830 is the state's own key, not one this site invented.