WILSON, DAVID G.

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the OVERTON (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217562District 06Field 678491502 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.4 M
Jan 2006 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 702 leases and 702 wells, and the rule below applies to all of them.

Discovered
1977-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-03-25.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-11169943
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,008 bbl$541,536
GasProduction470,878 Mcf$2,879,078
Total$3,420,614

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1535, -95.0807. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.15346, -95.08075 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,845 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,845 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-423320191211,845 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 2026025106.413.05$76
Apr 202602798.932.87$77
Mar 202604089.753.15$126
Feb 202601163.503.75$41
Jan 202601659.138.00$128
Dec 20250456.664.41$18
Nov 20250458.593.93$16
Oct 20250759.383.30$23
Sep 202503362.743.08$102
Aug 202502563.933.01$75
Jul 202504966.743.32$162
Jun 202506666.483.13$207
May 202502060.553.23$65
Apr 202501862.363.54$64
Mar 202507667.704.27$324
Feb 202503470.884.34$148
Jan 2025012174.324.28$518
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202430071.372.28$2,141
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20238071.262.61$570
Nov 2023052077.892.81$1,460
Oct 2023052185.443.09$1,608
Sep 2023010489.042.74$284
Aug 2023010480.522.67$278
Jul 2023224374.852.64$792
Jun 2023122368.962.26$573
May 2023323670.622.23$738
Apr 2023021278.122.24$474
Mar 20231620972.852.39$1,666
Feb 20230075.112.47$0
Jan 202312,80676.533.39$9,582
Dec 202207376.415.73$418
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 202204594.529.13$411
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 202116470.783.98$326
Jun 20210069.493.38$0
May 202101663.483.02$48
Apr 202103160.362.76$86
Mar 202103261.302.72$87
Feb 20210057.805.55$0
Jan 202101250.412.81$34
Dec 202013244.642.68$130
Nov 20201845338.772.71$7,277
Oct 202009436.972.48$233
Sep 202004637.091.99$92
Aug 2020243939.982.39$1,053
Jul 20202013238.371.83$1,008
Jun 202011434.901.69$59
May 2020222216.921.81$437
Apr 202028714.751.80$186
Mar 202026430.341.86$179
Feb 202003849.881.98$75
Jan 202015357.252.09$168
Dec 201916559.012.30$209
Nov 201918155.302.75$278
Oct 201915653.472.42$189
Sep 2019118455.052.66$544
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 2019211258.482.74$424
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190350.852.79$8
Jan 201908846.033.23$284
Dec 201817846.594.19$373
Nov 2018011852.934.24$500
Oct 2018119161.443.40$710
Sep 2018010159.543.11$314
Aug 2018112859.403.07$452
Jul 2018117965.142.93$590
Jun 201803860.183.08$117
May 201817510365.382.90$11,740
Apr 2018116663.842.90$545
Mar 2018014561.222.79$404
Feb 2018011361.782.77$313
Jan 201818362.874.01$396
Dec 2017014657.272.92$427
Nov 2017348655.423.12$1,682
Oct 2017021149.292.98$630
Sep 201751,07547.523.09$3,556
Aug 2017166345.373.00$2,037
Jul 2017045143.873.09$1,392
Jun 2017140642.493.09$1,296
May 2017128145.373.26$962
Apr 2017022247.933.21$713
Mar 2017014846.772.98$442
Feb 201718750.452.95$307
Jan 201701,44949.413.42$4,954
Dec 201611,07548.763.72$4,051
Nov 2016226942.492.64$796
Oct 201605446.193.09$167
Sep 2016017741.553.10$549
Aug 201615563441.442.92$8,277
Jul 2016496741.622.92$2,994
Jun 2016132445.352.69$916
May 2016024942.521.99$496
Apr 2016025136.561.99$500
Mar 2016121633.011.79$421
Feb 201618219926.472.06$5,228
Jan 201661,43027.352.36$3,545
Dec 2015272532.362.00$1,516
Nov 2015329738.792.17$760
Oct 201511,01243.552.43$2,499
Sep 201511,56742.992.76$4,365
Aug 201502,16640.162.87$6,222
Jul 201501,06648.152.95$3,139
Jun 201521,10356.152.88$3,292
May 201562,64755.212.96$8,154
Apr 201521,51849.822.71$4,208
Mar 20151841,16442.892.93$11,308
Feb 201501,00144.662.98$2,979
Jan 201501,22143.433.10$3,786
Dec 201411,29854.693.59$4,716
Nov 201401,29270.464.25$5,493
Oct 201421,27978.303.90$5,146
Sep 20141901,31286.164.05$21,678
Aug 201401,31989.394.04$5,322
Jul 201441,33396.564.18$5,958
Jun 201401,22798.164.74$5,812
May 201431,27594.734.73$6,311
Apr 20141511,20695.944.81$20,287
Mar 201423295.895.06$354
Feb 2014297997.406.19$6,257
Jan 201431,20790.404.86$6,138
Dec 201331,32991.824.35$6,063
Nov 201301,32488.853.74$4,949
Oct 201331,48997.423.78$5,920
Sep 201301,427104.113.72$5,305
Aug 201301,554104.253.52$5,474
Jul 201301,583102.523.72$5,885
Jun 201351,62394.403.93$6,856
May 20131731,62994.834.15$23,164
Apr 201331,66093.964.28$7,391
Mar 201301,57593.623.91$6,163
Feb 201331,46391.233.42$5,277
Jan 201301,59791.603.42$5,462
Dec 201231,66486.773.42$5,951
Nov 201231,55486.953.62$5,894
Oct 20121811,70589.383.40$21,974
Sep 201231,62294.672.92$5,018
Aug 201201,82192.662.91$5,296
Jul 201261,80485.133.02$5,960
Jun 201231,73479.822.52$4,607
May 201201,69791.612.49$4,223
Apr 201251,831101.652.00$4,164
Mar 2012131,801105.052.22$5,368
Feb 201264,851101.102.57$13,075
Jan 201261,98598.092.73$6,016
Dec 201151,97896.873.24$6,893
Nov 201172,04895.723.31$7,452
Oct 20112182,22284.983.65$26,633
Sep 201172,14383.623.99$9,127
Aug 201132,26483.404.15$9,644
Jul 201172,03694.144.52$9,856
Jun 2011121,90292.904.64$9,940
May 201132,25398.134.40$10,218
Apr 201172,279105.964.33$10,617
Mar 201132,37396.364.06$9,917
Feb 201151,53085.644.18$6,824
Jan 201161,78886.504.59$8,724
Dec 20101892,25685.734.35$26,011
Nov 2010102,29180.843.80$9,504
Oct 2010202,30478.103.51$9,646
Sep 201032,14272.633.98$8,742
Aug 20101862,31873.684.42$23,949
Jul 201002,85772.554.74$13,532
Jun 201042,76370.364.91$13,849
May 201042,83271.124.24$12,279
Apr 201002,60581.694.12$10,740
Mar 201003,01078.394.39$13,210
Feb 20101842,76473.585.44$28,581
Jan 201013,13974.365.96$18,796
Dec 200963,23271.445.48$18,152
Nov 200903,16174.593.75$11,858
Oct 200983,32872.544.11$14,259
Sep 20092193,36465.543.06$24,663
Aug 200903,31167.423.22$10,656
Jul 2009153,40661.133.46$12,717
Jun 20091112166.163.90$1,199
May 20091783,48854.743.93$23,437
Apr 200933,50546.773.59$12,715
Mar 2009272,85642.144.06$12,730
Feb 2009271,53432.814.63$7,993
Jan 20092172,13735.865.37$19,259
Dec 2008133,03837.105.98$18,641
Nov 2008103,58855.496.86$25,170
Oct 2008153,69375.246.92$26,691
Sep 20081993,782101.767.88$50,041
Aug 200814,181114.228.48$35,582
Jul 200874,333131.0811.39$50,268
Jun 200884,120131.3313.03$54,745
May 20081904,398123.1711.57$74,306
Apr 2008144,345110.3110.45$46,971
Mar 200884,471101.909.66$44,023
Feb 20081944,11292.538.77$54,015
Jan 2008614,34490.388.21$41,159
Dec 20071804,27488.337.30$47,108
Nov 2007173,81491.677.29$29,369
Oct 200793,95782.856.92$28,136
Sep 20071853,86775.846.24$38,177
Aug 200753,67469.066.39$23,815
Jul 20071823,72270.906.39$36,680
Jun 2007113,95862.007.55$30,559
May 20071805,11758.747.85$50,723
Apr 200705,82359.617.81$45,450
Mar 2007136,44956.927.30$47,830
Feb 20071736,29455.108.22$61,244
Jan 20071777,05350.306.73$56,348
Dec 200627,53456.656.92$52,237
Nov 20061928,68354.207.62$76,549
Oct 200609,85754.906.01$59,278
Sep 20061829,64460.085.04$59,513
Aug 200618310,55368.717.34$90,032
Jul 200617711,57069.376.34$85,664
Jun 200617512,57766.286.38$91,889
May 200636213,95566.016.42$113,557
Apr 2006015,96564.397.36$117,510
Mar 200653322,10456.707.08$186,782
Feb 200673824,42357.597.75$231,807
Jan 200618936,09560.598.93$333,900

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   25 Mcf  × $  3.05 =        $76

────────────────────────────────────────────────────
Month total                                      $76

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/217562 is the state's own key, not one this site invented.