DESHA GU 1

Operated by TEXIAN OPERATING COMPANY, LLC (P-5 848681) in the DOUGLASS, W. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218553District 06Field 258644712 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.3 M
Jan 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 423 leases and 423 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: AND NACOGDOCHES, E. (JAMES LIME).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-08-20176405
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition694 bbl$49,594
GasProduction772,360 Mcf$4,284,100
Total$4,333,694

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6903, -94.8305. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.69026, -94.83052 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,680 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,680 ft.

1 well

42-34732166210,680 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230171.262.61$3
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230272.852.39$5
Feb 202301075.112.47$25
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 202203887.185.86$223
Sep 20220084.888.16$0
Aug 202203994.529.13$356
Jul 202202101.587.54$15
Jun 2022016115.097.98$128
May 2022020109.378.43$169
Apr 2022022104.226.84$150
Mar 2022045108.885.08$228
Feb 202202691.054.86$126
Jan 202201581.844.54$68
Dec 202105471.323.90$211
Nov 202102377.435.24$120
Oct 202103479.795.71$194
Sep 202101969.865.35$102
Aug 202101866.024.22$76
Jul 202102970.783.98$115
Jun 202104669.493.38$156
May 202104363.483.02$130
Apr 202103460.362.76$94
Mar 202102561.302.72$68
Feb 202102557.805.55$139
Jan 202112450.412.81$118
Dec 202005744.642.68$153
Nov 202003838.772.71$103
Oct 20200936.972.48$22
Sep 20200837.091.99$16
Aug 202001739.982.39$41
Jul 202002538.371.83$46
Jun 202002434.901.69$41
May 20200916.921.81$16
Apr 2020152614.751.80$268
Mar 202004630.341.86$85
Feb 20200049.881.98$0
Jan 202001157.252.09$23
Dec 201902559.012.30$58
Nov 201904255.302.75$116
Oct 20190853.472.42$19
Sep 20190655.052.66$16
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190158.482.74$3
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 201901,47846.033.23$4,771
Dec 201802,03146.594.19$8,501
Nov 201801,68752.934.24$7,148
Oct 201801,89661.443.40$6,443
Sep 201801,87659.543.11$5,831
Aug 201811,83759.403.07$5,693
Jul 201801,72165.142.93$5,046
Jun 201811,80960.183.08$5,626
May 2018251,83565.382.90$6,957
Apr 201801,38663.842.90$4,021
Mar 201801,64061.222.79$4,570
Feb 201801,74361.782.77$4,821
Jan 201801,70862.874.01$6,848
Dec 201701,66557.272.92$4,864
Nov 201701,74355.423.12$5,435
Oct 201701,92949.292.98$5,756
Sep 201701,84347.523.09$5,690
Aug 201701,85145.373.00$5,561
Jul 201701,87643.873.09$5,792
Jun 2017312,00242.493.09$7,498
May 201701,84145.373.26$6,008
Apr 201701,83947.933.21$5,906
Mar 201702,11546.772.98$6,310
Feb 201701,89450.452.95$5,592
Jan 201701,94149.413.42$6,636
Dec 201602,09948.763.72$7,814
Nov 201601,96142.492.64$5,186
Oct 201601,78346.193.09$5,510
Sep 201601,96541.553.10$6,093
Aug 201602,11941.442.92$6,197
Jul 201602,17341.622.92$6,355
Jun 2016332,09045.352.69$7,110
May 201602,16042.521.99$4,301
Apr 201602,16136.561.99$4,303
Mar 201602,24533.011.79$4,028
Feb 201602,08626.472.06$4,305
Jan 201602,24927.352.36$5,317
Dec 201502,26132.362.00$4,525
Nov 201502,27938.792.17$4,939
Oct 201501,75643.552.43$4,261
Sep 201501,74942.992.76$4,824
Aug 201501,99040.162.87$5,716
Jul 201502,31348.152.95$6,812
Jun 201502,05656.152.88$5,927
May 201502,48255.212.96$7,335
Apr 201502,30549.822.71$6,239
Mar 201502,44142.892.93$7,164
Feb 2015182,32144.662.98$7,712
Jan 201502,47843.433.10$7,683
Dec 201402,31054.693.59$8,296
Nov 201402,15970.464.25$9,180
Oct 201402,20278.303.90$8,590
Sep 201402,53786.164.05$10,263
Aug 201403,22489.394.04$13,009
Jul 201403,15496.564.18$13,182
Jun 201403,03598.164.74$14,376
May 201403,12894.734.73$14,785
Apr 2014112,97895.944.81$15,377
Mar 201403,24895.895.06$16,424
Feb 2014222,87597.406.19$19,945
Jan 201403,21390.404.86$15,617
Dec 201303,40691.824.35$14,831
Nov 201302,96988.853.74$11,099
Oct 201303,14297.423.78$11,875
Sep 201302,942104.113.72$10,938
Aug 201303,083104.253.52$10,860
Jul 201303,309102.523.72$12,302
Jun 201303,27294.403.93$12,870
May 2013303,45594.834.15$17,180
Apr 201303,42793.964.28$14,676
Mar 201303,43993.623.91$13,456
Feb 201303,19891.233.42$10,937
Jan 201303,62191.603.42$12,383
Dec 201203,55086.773.42$12,142
Nov 201203,49786.953.62$12,676
Oct 201203,77589.383.40$12,834
Sep 201203,48994.672.92$10,182
Aug 201203,30692.662.91$9,614
Jul 201203,18585.133.02$9,621
Jun 201203,52979.822.52$8,890
May 2012313,72991.612.49$12,119
Apr 201203,656101.652.00$7,300
Mar 201203,836105.052.22$8,524
Feb 201203,551101.102.57$9,127
Jan 201203,99098.092.73$10,909
Dec 201104,26996.873.24$13,830
Nov 201104,08495.723.31$13,523
Oct 201104,15184.983.65$15,145
Sep 2011244,05883.623.99$18,181
Aug 201104,16483.404.15$17,278
Jul 201104,26594.144.52$19,266
Jun 201104,18992.904.64$19,436
May 201104,03498.134.40$17,769
Apr 2011264,099105.964.33$20,517
Mar 201104,65696.364.06$18,891
Feb 201103,67885.644.18$15,374
Jan 201104,06786.504.59$18,663
Dec 201004,09685.734.35$17,808
Nov 2010144,01080.843.80$16,351
Oct 201004,50178.103.51$15,794
Sep 201004,10572.633.98$16,336
Aug 201004,32873.684.42$19,127
Jul 2010234,28572.554.74$21,965
Jun 201014,30870.364.91$21,224
May 201004,76371.124.24$20,172
Apr 201004,15481.694.12$17,126
Mar 201004,56778.394.39$20,043
Feb 201003,88173.585.44$21,122
Jan 2010284,94074.365.96$31,545
Dec 200905,08871.445.48$27,901
Nov 200904,99974.593.75$18,754
Oct 2009145,16572.544.11$22,245
Sep 200905,26665.543.06$16,139
Aug 200905,57067.423.22$17,927
Jul 200995,65361.133.46$20,135
Jun 200905,64566.163.90$21,987
May 200965,92754.743.93$23,596
Apr 200905,89646.773.59$21,152
Mar 200925,77342.144.06$23,517
Feb 200964,95832.814.63$23,167
Jan 2009155,58735.865.37$30,546
Dec 200804,82637.105.98$28,846
Nov 200864,54655.496.86$31,520
Oct 200805,74075.246.92$39,732
Sep 200815,148101.767.88$40,653
Aug 200833,944114.228.48$33,800
Jul 200864,195131.0811.39$48,565
Jun 2008243,797131.3313.03$52,637
May 200805,480123.1711.57$63,427
Apr 200815,346110.3110.45$56,002
Mar 2008296,602101.909.66$66,757
Feb 200806,97492.538.77$61,166
Jan 200806,84490.388.21$56,160
Dec 200707,04988.337.30$51,472
Nov 200717,80991.677.29$57,033
Oct 200718,09382.856.92$56,102
Sep 200708,05575.846.24$50,297
Aug 2007418,68369.066.39$58,298
Jul 200728,93570.906.39$57,218
Jun 200718,95062.007.55$67,621
May 200729,66258.747.85$75,928
Apr 200719,64759.617.81$75,356
Mar 2007210,39956.927.30$76,047
Feb 2007010,03655.108.22$82,456
Jan 20075811,47350.306.73$80,095
Dec 2006111,71556.656.92$81,106
Nov 2006112,03454.207.62$91,723
Oct 2006013,13754.906.01$79,003
Sep 2006113,50860.085.04$68,103
Aug 20065515,09768.717.34$114,590
Jul 2006016,43869.376.34$104,262
Jun 2006017,31266.286.38$110,518
May 2006220,51666.016.42$131,947
Apr 20066523,76964.397.36$179,137
Mar 2006030,84556.707.08$218,473
Feb 2006343,07157.597.75$334,021
Jan 200601,41760.598.93$12,659

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 71.26 =         $0
Gas                    1 Mcf  × $  2.61 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/218553 is the state's own key, not one this site invented.