BENTON "O"

Operated by SYDRI OPERATING, LLC (P-5 833597) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219567District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.4 M
Jan 2006 – May 2026
Value, last 12 filed months
$80 k
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-25168197
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,792 bbl$547,380
GasProduction890,537 Mcf$4,835,564
Total$5,382,943

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0271, -94.6861. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.02707, -94.68608 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,900 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-401337351810,900 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 202601,872106.413.05$5,702
Apr 202601,86598.932.87$5,352
Mar 202602,14289.753.15$6,746
Feb 202601,75263.503.75$6,571
Jan 202601,40459.138.00$11,229
Dec 202501,46856.664.41$6,479
Nov 202501,09658.593.93$4,303
Oct 202501,85359.383.30$6,124
Sep 202501,84562.743.08$5,677
Aug 2025711,82463.933.01$10,038
Jul 202501,89566.743.32$6,282
Jun 202501,61266.483.13$5,044
May 202501,24860.553.23$4,034
Apr 202531,89862.363.54$6,912
Mar 202551,48067.704.27$6,656
Feb 202551,25070.884.34$5,780
Jan 202501,06874.324.28$4,570
Dec 202401,40468.993.12$4,382
Nov 2024211,49569.052.20$4,737
Oct 202401,41871.372.28$3,235
Sep 202401,51169.612.36$3,573
Aug 202401,43975.632.06$2,970
Jul 202401,61579.932.15$3,467
Jun 2024771,15478.082.63$9,052
May 202401,22778.812.20$2,697
Apr 202401,43384.451.66$2,378
Mar 202401,55880.301.55$2,407
Feb 202401,49276.091.78$2,661
Jan 202401,08173.023.30$3,565
Dec 202301,27871.262.61$3,337
Nov 202301,48277.892.81$4,161
Oct 202301,78485.443.09$5,508
Sep 2023571,45789.042.74$9,060
Aug 2023044380.522.67$1,184
Jul 202301,79774.852.64$4,747
Jun 202301,52368.962.26$3,440
May 202301,81470.622.23$4,041
Apr 202302,21078.122.24$4,945
Mar 202302,22372.852.39$5,320
Feb 202301,72975.112.47$4,263
Jan 202302,11076.533.39$7,148
Dec 2022762,94376.415.73$22,668
Nov 202202,95085.005.65$16,656
Oct 202202,97287.185.86$17,427
Sep 202202,92384.888.16$23,862
Aug 202202,17394.529.13$19,833
Jul 202202,693101.587.54$20,311
Jun 202202,477115.097.98$19,760
May 202202,326109.378.43$19,615
Apr 202202,162104.226.84$14,783
Mar 202202,544108.885.08$12,914
Feb 202201,55891.054.86$7,570
Jan 202202,85881.844.54$12,969
Dec 202103,70671.323.90$14,450
Nov 2021082877.435.24$4,336
Oct 202102,49479.795.71$14,250
Sep 202103,37469.865.35$18,054
Aug 202103,28466.024.22$13,860
Jul 202102,87970.783.98$11,464
Jun 2021923,15569.493.38$17,059
May 202103,54263.483.02$10,689
Apr 202102,47860.362.76$6,835
Mar 202102,43361.302.72$6,610
Feb 202102,16757.805.55$12,022
Jan 202102,25750.412.81$6,343
Dec 202002,23744.642.68$5,985
Nov 202001,00338.772.71$2,715
Oct 202002,35236.972.48$5,829
Sep 2020029137.091.99$579
Aug 202001,23139.982.39$2,936
Jul 202002,30838.371.83$4,212
Jun 202002,12434.901.69$3,590
May 202002,33916.921.81$4,245
Apr 202002,29914.751.80$4,148
Mar 202002,40730.341.86$4,468
Feb 202001,72649.881.98$3,419
Jan 202011,22557.252.09$2,623
Dec 2019641,79959.012.30$7,922
Nov 201902,08355.302.75$5,730
Oct 201902,02753.472.42$4,902
Sep 201901,35255.052.66$3,593
Aug 201901,59953.112.30$3,685
Jul 201901,76756.272.46$4,347
Jun 201902,14452.782.49$5,341
May 201902,12158.482.74$5,812
Apr 201902,15362.632.75$5,922
Mar 201902,07956.803.06$6,366
Feb 201902,56650.852.79$7,165
Jan 201903,28446.033.23$10,601
Dec 201802,73246.594.19$11,435
Nov 201802,38452.934.24$10,102
Oct 201802,75961.443.40$9,375
Sep 201802,44259.543.11$7,590
Aug 201801,80459.403.07$5,532
Jul 201802,62865.142.93$7,705
Jun 2018572,88260.183.08$12,298
May 201802,84865.382.90$8,261
Apr 201802,96763.842.90$8,607
Mar 201802,53661.222.79$7,067
Feb 201802,21061.782.77$6,113
Jan 201802,13162.874.01$8,544
Dec 201711,99157.272.92$5,874
Nov 201724,31955.423.12$13,579
Oct 201722,31549.292.98$7,006
Sep 201702,75647.523.09$8,509
Aug 201703,90845.373.00$11,741
Jul 201703,52143.873.09$10,870
Jun 20171203,95342.493.09$17,303
May 201704,69145.373.26$15,309
Apr 201703,72347.933.21$11,957
Mar 201703,91346.772.98$11,675
Feb 201703,74850.452.95$11,066
Jan 2017038849.413.42$1,326
Dec 2016015348.763.72$570
Nov 2016014742.492.64$389
Oct 201601,77246.193.09$5,476
Sep 201601,12841.553.10$3,498
Aug 2016091841.442.92$2,685
Jul 2016088741.622.92$2,594
Jun 201611,94945.352.69$5,280
May 201601,20542.521.99$2,399
Apr 201601,64736.561.99$3,279
Mar 201601,95233.011.79$3,502
Feb 201601,22226.472.06$2,522
Jan 201612,65527.352.36$6,305
Dec 2015531,87332.362.00$5,464
Nov 2015189538.792.17$1,979
Oct 201501,17943.552.43$2,861
Sep 2015112,08842.992.76$6,232
Aug 201581,83840.162.87$5,601
Jul 201501,90848.152.95$5,619
Jun 201501,59256.152.88$4,590
May 201572,12555.212.96$6,667
Apr 201551,04649.822.71$3,080
Mar 201501,73442.892.93$5,089
Feb 201512,16344.662.98$6,482
Jan 201512,97943.433.10$9,280
Dec 201402,99954.693.59$10,770
Nov 2014102,57470.464.25$11,649
Oct 201472,86378.303.90$11,717
Sep 201421,64286.164.05$6,815
Aug 201481,72689.394.04$7,680
Jul 201421,40396.564.18$6,057
Jun 201481,51798.164.74$7,971
May 20141661,59894.734.73$23,278
Apr 201471,48195.944.81$7,794
Mar 201411,59495.895.06$8,156
Feb 201411,58197.406.19$9,887
Jan 201411,24890.404.86$6,157
Dec 201361,26591.824.35$6,059
Nov 201311,61488.853.74$6,122
Oct 201361,48697.423.78$6,201
Sep 201311,465104.113.72$5,551
Aug 201361,637104.253.52$6,392
Jul 201321,903102.523.72$7,280
Jun 2013101,77994.403.93$7,942
May 201311,86494.834.15$7,829
Apr 201302,04493.964.28$8,754
Mar 201381,97993.623.91$8,493
Feb 201311,80791.233.42$6,271
Jan 20131802,07291.603.42$23,574
Dec 201292,38586.773.42$8,938
Nov 201202,05786.953.62$7,457
Oct 2012122,69489.383.40$10,231
Sep 201282,28994.672.92$7,438
Aug 201212,56892.662.91$7,561
Jul 201292,13585.133.02$7,216
Jun 201202,22379.822.52$5,600
May 2012122,38591.612.49$7,034
Apr 20121802,635101.652.00$23,559
Mar 201272,501105.052.22$6,293
Feb 201231,956101.102.57$5,331
Jan 201211,81698.092.73$5,063
Dec 201161,75696.873.24$6,270
Nov 201111,94295.723.31$6,526
Oct 2011642,51384.983.65$14,608
Sep 201162,11783.623.99$8,940
Aug 201112,42283.404.15$10,133
Jul 201112,62694.144.52$11,956
Jun 201102,37992.904.64$11,038
May 201172,99098.134.40$13,857
Apr 20111722,628105.964.33$29,613
Mar 201122,80196.364.06$11,557
Feb 201141,73785.644.18$7,603
Jan 201102,53886.504.59$11,646
Dec 201002,93785.734.35$12,769
Nov 20101722,58780.843.80$23,723
Oct 201002,48178.103.51$8,706
Sep 201072,96672.633.98$12,312
Aug 201063,19973.684.42$14,580
Jul 201002,82772.554.74$13,390
Jun 20102003,02170.364.91$28,906
May 201003,34871.124.24$14,180
Apr 201073,50981.694.12$15,038
Mar 201002,85878.394.39$12,543
Feb 201052,66873.585.44$14,888
Jan 201014,21174.365.96$25,189
Dec 20091183,57771.445.48$28,045
Nov 200963,95374.593.75$15,277
Oct 2009903,95372.544.11$22,776
Sep 200964,22165.543.06$13,330
Aug 200914,50267.423.22$14,557
Jul 20091744,30461.133.46$25,548
Jun 200984,70866.163.90$18,867
May 200915,05154.743.93$19,884
Apr 20092044,93746.773.59$27,253
Mar 200925,26842.144.06$21,467
Feb 200984,70332.814.63$22,051
Jan 200925,53435.865.37$29,795
Dec 200895,61637.105.98$33,902
Nov 20081955,68455.496.86$49,815
Oct 200885,76575.246.92$40,507
Sep 200815,472101.767.88$43,205
Aug 20081665,888114.228.48$68,909
Jul 200866,517131.0811.39$75,011
Jun 200826,271131.3313.03$81,990
May 20081826,537123.1711.57$98,078
Apr 200806,896110.3110.45$72,097
Mar 200866,708101.909.66$65,438
Feb 20081776,73592.538.77$75,448
Jan 200827,57790.388.21$62,356
Dec 20071718,01988.337.30$73,659
Nov 200758,13791.677.29$59,791
Oct 20071708,98082.856.92$76,244
Sep 200709,02575.846.24$56,354
Aug 20071999,57169.066.39$74,882
Jul 2007110,48870.906.39$67,068
Jun 20071789,82762.007.55$85,215
May 2007111,28158.747.85$88,573
Apr 200719411,75459.617.81$103,307
Mar 200717811,70656.927.30$95,609
Feb 200718111,63255.108.22$105,542
Jan 200719713,09150.306.73$97,970
Dec 200618515,86256.656.92$120,221
Nov 20061318,77754.207.62$143,738
Oct 20061879,99954.906.01$70,398
Sep 200618817,89260.085.04$101,421
Aug 200618518,01568.717.34$144,940
Jul 200636418,68469.376.34$143,759
Jun 200618712,12666.286.38$89,805
May 200619116,17166.016.42$116,507
Apr 200636619,81064.397.36$169,378
Mar 200657329,90056.707.08$244,268
Feb 200641134,34157.597.75$289,851
Jan 2006118,68160.598.93$78,217

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,872 Mcf  × $  3.05 =     $5,702

────────────────────────────────────────────────────
Month total                                   $5,702

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/219567 is the state's own key, not one this site invented.