THOMPSON, MATT

Operated by SUNLAND PRODUCTION COMPANY, INC. (P-5 829288) in the RIVERVIEW (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220237District 06Field 770583802 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.1 M
Feb 2006 – Apr 2017
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
135
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1997-09-12
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 02/01/2007.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-05-22172636
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,758 bbl$118,485
GasProduction326,942 Mcf$1,946,342
Total$2,064,827

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4840, -94.8378. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.48403, -94.83783 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
12,100 ft
1 wells filed one
Completion to plug
10.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,100 ft.

Completions filed
Feb 2006
1 of 1 wells
Plug dates filed
Aug 2016
1 of 1 wells

Last completion to plug: a median of 10.5 years across the 1 well that filed both dates, with the middle half between 10.5 years and 10.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-00530270212,100 ftFeb 2006Aug 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (135)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

135 months

Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 201633046.193.09$1,524
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160333.011.79$5
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140197.406.19$6
Jan 2014074290.404.86$3,607
Dec 20131821,48991.824.35$23,195
Nov 201301,53488.853.74$5,735
Oct 201301,63697.423.78$6,183
Sep 20130934104.113.72$3,472
Aug 20130398104.253.52$1,402
Jul 201301,174102.523.72$4,365
Jun 201301,14494.403.93$4,500
May 201301,21294.834.15$5,029
Apr 201301,20593.964.28$5,161
Mar 20130393.623.91$12
Feb 201301,07491.233.42$3,673
Jan 201301,31191.603.42$4,484
Dec 201201,18186.773.42$4,039
Nov 201201,22486.953.62$4,437
Oct 201201,23889.383.40$4,209
Sep 201201,27794.672.92$3,727
Aug 201201,26992.662.91$3,690
Jul 201201,36385.133.02$4,117
Jun 201201,31579.822.52$3,313
May 201201,28991.612.49$3,207
Apr 201201,293101.652.00$2,582
Mar 201201,330105.052.22$2,955
Feb 201201,339101.102.57$3,442
Jan 201201,45898.092.73$3,986
Dec 201101,44996.873.24$4,694
Nov 201101,49495.723.31$4,947
Oct 201101,50784.983.65$5,498
Sep 201102,01983.623.99$8,047
Aug 201102,26083.404.15$9,377
Jul 20111802,17094.144.52$26,748
Jun 201102,25292.904.64$10,449
May 201102,46298.134.40$10,845
Apr 201102,343105.964.33$10,153
Mar 201102,43296.364.06$9,867
Feb 201102,19785.644.18$9,183
Jan 201102,52686.504.59$11,591
Dec 201002,56985.734.35$11,169
Nov 201002,61180.843.80$9,910
Oct 201002,61678.103.51$9,179
Sep 201002,74572.633.98$10,924
Aug 201002,79173.684.42$12,334
Jul 201002,88572.554.74$13,665
Jun 201002,92970.364.91$14,383
May 201002,93271.124.24$12,418
Apr 20101592,95881.694.12$25,184
Mar 201002,96178.394.39$12,995
Feb 201002,82873.585.44$15,391
Jan 201003,17574.365.96$18,936
Dec 200913,22071.445.48$17,729
Nov 200903,25374.593.75$12,204
Oct 200903,32772.544.11$13,675
Sep 200903,19665.543.06$9,795
Aug 200903,42567.423.22$11,023
Jul 200913,40161.133.46$11,844
Jun 200903,44766.163.90$13,426
May 200903,64354.743.93$14,302
Apr 200903,51246.773.59$12,599
Mar 200903,73742.144.06$15,168
Feb 20091583,35332.814.63$20,718
Jan 200903,95835.865.37$21,258
Dec 200803,96737.105.98$23,711
Nov 20081723,95555.496.86$36,677
Oct 200804,24575.246.92$29,384
Sep 200814,211101.767.88$33,272
Aug 200804,695114.228.48$39,828
Jul 200815,613131.0811.39$64,060
Jun 200800131.3313.03$0
May 200803,675123.1711.57$42,536
Apr 200803,739110.3110.45$39,091
Mar 200803,983101.909.66$38,492
Feb 200803,86292.538.77$33,872
Jan 200804,15390.388.21$34,078
Dec 200703,82988.337.30$27,959
Nov 200714,02591.677.29$29,441
Oct 200704,56382.856.92$31,585
Sep 20071664,28475.846.24$39,339
Aug 200704,53169.066.39$28,944
Jul 200704,95070.906.39$31,620
Jun 200703,16462.007.55$23,883
May 200705,06158.747.85$39,710
Apr 200704,95259.617.81$38,651
Mar 20071595,39956.927.30$48,474
Feb 20071625,18455.108.22$51,518
Jan 200716,19350.306.73$41,710
Dec 200606,83156.656.92$47,260
Nov 200617,65754.207.62$58,381
Oct 200619,56254.906.01$57,559
Sep 200617416,83660.085.04$95,260
Aug 2006514,79768.717.34$108,952
Jul 20061687,97069.376.34$62,206
Jun 2006410,35866.286.38$66,389
May 200659,05066.016.42$58,476
Apr 200673,95364.397.36$29,547
Mar 2006167,67656.707.08$55,276
Feb 20060057.597.75$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2016 — as filed, then multipliedworked
Condensate            33 bbl  × $ 46.19 =     $1,524
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $1,524

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/220237 is the state's own key, not one this site invented.