MARKEY #1

Operated by SABINE ENERGY INC. (P-5 103925) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220606District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.3 M
Nov 2005 – May 2026
Value, last 12 filed months
$28 k
at the published price for each month
Months reported
247
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-10167003
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,541 bbl$115,533
GasProduction689,369 Mcf$4,136,645
Total$4,252,178

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0869, -94.7173. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.08686, -94.71732 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,950 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,950 ft.

Completions filed
Nov 2005
1 of 1 wells

1 well

42-401336741010,950 ftNov 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (247)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

247 months

May 202601,125106.413.05$3,427
Apr 202601,11098.932.87$3,185
Mar 2026090489.753.15$2,847
Feb 2026050263.503.75$1,883
Jan 2026054959.138.00$4,391
Dec 2025056656.664.41$2,498
Nov 2025053658.593.93$2,105
Oct 2025056059.383.30$1,851
Sep 2025050862.743.08$1,563
Aug 2025051263.933.01$1,544
Jul 2025044766.743.32$1,482
Jun 2025041366.483.13$1,292
May 2025044060.553.23$1,422
Apr 2025041862.363.54$1,481
Mar 2025042967.704.27$1,831
Feb 2025039070.884.34$1,693
Jan 2025043674.324.28$1,866
Dec 2024042868.993.12$1,336
Nov 2024037669.052.20$827
Oct 2024041171.372.28$938
Sep 2024041069.612.36$969
Aug 2024094775.632.06$1,954
Jul 2024071979.932.15$1,543
Jun 2024056978.082.63$1,499
May 2024059678.812.20$1,310
Apr 2024053984.451.66$894
Mar 2024051780.301.55$799
Feb 2024052876.091.78$942
Jan 2024053573.023.30$1,764
Dec 2023054471.262.61$1,420
Nov 2023054377.892.81$1,525
Oct 2023056085.443.09$1,729
Sep 2023050589.042.74$1,381
Aug 2023059680.522.67$1,593
Jul 2023059674.852.64$1,575
Jun 2023057568.962.26$1,299
May 2023060270.622.23$1,341
Apr 2023057778.122.24$1,291
Mar 2023062572.852.39$1,496
Feb 2023062075.112.47$1,529
Jan 2023069276.533.39$2,344
Dec 2022068676.415.73$3,930
Nov 2022072085.005.65$4,065
Oct 2022076587.185.86$4,486
Sep 2022070984.888.16$5,788
Aug 2022075194.529.13$6,855
Jul 20220834101.587.54$6,290
Jun 20220807115.097.98$6,438
May 20220689109.378.43$5,810
Apr 20220661104.226.84$4,520
Mar 20220696108.885.08$3,533
Feb 2022069491.054.86$3,372
Jan 2022083881.844.54$3,803
Dec 2021078871.323.90$3,073
Nov 2021077977.435.24$4,080
Oct 202101,03779.795.71$5,925
Sep 2021098169.865.35$5,249
Aug 2021097666.024.22$4,119
Jul 2021099770.783.98$3,970
Jun 202101,02269.493.38$3,455
May 202101,14563.483.02$3,455
Apr 202101,10060.362.76$3,034
Mar 202101,07461.302.72$2,918
Feb 202101,02057.805.55$5,659
Jan 2021095650.412.81$2,687
Dec 2020072144.642.68$1,929
Nov 2020089438.772.71$2,420
Oct 202001,03336.972.48$2,560
Sep 202001,10537.091.99$2,200
Aug 202001,28239.982.39$3,058
Jul 202001,20238.371.83$2,194
Jun 202001,13334.901.69$1,915
May 202001,21416.921.81$2,203
Apr 202011,19914.751.80$2,178
Mar 202001,63030.341.86$3,026
Feb 202001,32049.881.98$2,614
Jan 202001,47157.252.09$3,081
Dec 201901,45459.012.30$3,351
Nov 2019096755.302.75$2,660
Oct 201901,68253.472.42$4,068
Sep 201902,87255.052.66$7,632
Aug 201901,78453.112.30$4,111
Jul 201901,80856.272.46$4,448
Jun 201901,72652.782.49$4,300
May 201901,67558.482.74$4,590
Apr 201901,70962.632.75$4,701
Mar 201901,77656.803.06$5,438
Feb 201901,64750.852.79$4,599
Jan 201901,83746.033.23$5,930
Dec 201801,81746.594.19$7,605
Nov 201801,79752.934.24$7,614
Oct 201801,92561.443.40$6,541
Sep 201802,57159.543.11$7,991
Aug 201802,59359.403.07$7,952
Jul 201802,04465.142.93$5,993
Jun 201801,52260.183.08$4,683
May 201801,56965.382.90$4,551
Apr 201801,53863.842.90$4,461
Mar 201801,70361.222.79$4,746
Feb 201801,56361.782.77$4,323
Jan 201801,74662.874.01$7,000
Dec 201701,79557.272.92$5,244
Nov 201701,80955.423.12$5,641
Oct 201702,16149.292.98$6,448
Sep 201702,31947.523.09$7,159
Aug 201702,45245.373.00$7,367
Jul 201702,45043.873.09$7,564
Jun 201702,35642.493.09$7,274
May 201701,82445.373.26$5,952
Apr 201702,03047.933.21$6,520
Mar 201702,28146.772.98$6,806
Feb 201702,09650.452.95$6,189
Jan 201702,32149.413.42$7,935
Dec 201602,27748.763.72$8,477
Nov 201602,46642.492.64$6,521
Oct 201601,54646.193.09$4,778
Sep 201601,04341.553.10$3,234
Aug 201601,27641.442.92$3,731
Jul 201601,01841.622.92$2,977
Jun 201601,20845.352.69$3,244
May 201601,29542.521.99$2,578
Apr 201601,21936.561.99$2,427
Mar 201601,15533.011.79$2,072
Feb 201601,12726.472.06$2,326
Jan 201601,25927.352.36$2,977
Dec 201501,17432.362.00$2,350
Nov 201501,21838.792.17$2,640
Oct 201501,25143.552.43$3,036
Sep 201501,32042.992.76$3,641
Aug 201501,43440.162.87$4,119
Jul 201501,34148.152.95$3,949
Jun 201501,32056.152.88$3,805
May 201501,33855.212.96$3,954
Apr 201501,42549.822.71$3,857
Mar 201501,46242.892.93$4,291
Feb 201501,37844.662.98$4,101
Jan 201561,53543.433.10$5,020
Dec 2014111,55254.693.59$6,175
Nov 2014261,51370.464.25$8,265
Oct 2014261,52878.303.90$7,996
Sep 2014221,55786.164.05$8,194
Aug 2014291,54189.394.04$8,810
Jul 2014231,64996.564.18$9,113
Jun 2014321,68998.164.74$11,142
May 2014391,56294.734.73$11,077
Apr 2014111,48195.944.81$8,178
Mar 201401,60895.895.06$8,131
Feb 201401,52497.406.19$9,437
Jan 201401,63190.404.86$7,928
Dec 201301,70491.824.35$7,420
Nov 201301,64088.853.74$6,131
Oct 201301,76797.423.78$6,678
Sep 201301,722104.113.72$6,402
Aug 201301,920104.253.52$6,763
Jul 201301,981102.523.72$7,365
Jun 201301,90194.403.93$7,477
May 201301,97894.834.15$8,207
Apr 201301,90293.964.28$8,145
Mar 201301,94893.623.91$7,622
Feb 201301,75391.233.42$5,995
Jan 201302,00491.603.42$6,854
Dec 201202,01086.773.42$6,875
Nov 201201,95786.953.62$7,094
Oct 201201,96089.383.40$6,663
Sep 201202,01294.672.92$5,872
Aug 201202,06592.662.91$6,005
Jul 201202,11785.133.02$6,395
Jun 201202,08179.822.52$5,242
May 201202,11191.612.49$5,253
Apr 201202,075101.652.00$4,143
Mar 201202,627105.052.22$5,837
Feb 201202,415101.102.57$6,207
Jan 201202,56998.092.73$7,024
Dec 201112,65296.873.24$8,689
Nov 20111012,73495.723.31$18,721
Oct 201102,80084.983.65$10,216
Sep 201112,74483.623.99$11,021
Aug 201182,89683.404.15$12,684
Jul 201142,92194.144.52$13,571
Jun 2011212,60792.904.64$14,047
May 201182,75898.134.40$12,934
Apr 2011262,711105.964.33$14,502
Mar 2011282,77696.364.06$13,961
Feb 2011322,49285.644.18$13,157
Jan 2011272,81986.504.59$15,271
Dec 2010172,71685.734.35$13,266
Nov 2010112,51180.843.80$10,419
Oct 2010112,61478.103.51$10,031
Sep 201032,73272.633.98$11,090
Aug 2010192,89173.684.42$14,176
Jul 201042,91072.554.74$14,073
Jun 201082,82970.364.91$14,454
May 201082,95571.124.24$13,084
Apr 201092,97081.694.12$12,980
Mar 201073,09178.394.39$14,114
Feb 201092,86173.585.44$16,233
Jan 2010123,23274.365.96$20,168
Dec 2009103,28571.445.48$18,729
Nov 2009103,23274.593.75$12,871
Oct 200993,35372.544.11$14,435
Sep 2009173,28865.543.06$11,191
Aug 200993,38167.423.22$11,489
Jul 200993,67461.133.46$13,279
Jun 200983,45366.163.90$13,979
May 200963,71954.743.93$14,928
Apr 2009103,92746.773.59$14,556
Mar 200994,19142.144.06$17,391
Feb 200993,77932.814.63$17,803
Jan 200984,28635.865.37$23,307
Dec 2008164,33337.105.98$26,493
Nov 2008104,34055.496.86$30,329
Oct 2008104,53075.246.92$32,109
Sep 2008134,239101.767.88$34,714
Aug 2008134,646114.228.48$40,897
Jul 2008114,645131.0811.39$54,346
Jun 2008124,652131.3313.03$62,204
May 2008134,857123.1711.57$57,818
Apr 2008114,803110.3110.45$51,428
Mar 2008125,098101.909.66$50,490
Feb 2008204,91092.538.77$44,914
Jan 200885,35390.388.21$44,648
Dec 2007135,46188.337.30$41,024
Nov 200775,46991.677.29$40,520
Oct 2007275,63982.856.92$41,270
Sep 2007185,57675.846.24$36,183
Aug 2007296,01369.066.39$40,413
Jul 2007306,31270.906.39$42,448
Jun 2007356,42362.007.55$50,654
May 2007396,89458.747.85$56,383
Apr 2007236,94059.617.81$55,539
Mar 2007387,46456.927.30$56,665
Feb 2007506,98355.108.22$60,127
Jan 2007558,05150.306.73$56,924
Dec 2006478,51856.656.92$61,594
Nov 2006628,67354.207.62$69,427
Oct 2006479,55954.906.01$60,066
Sep 2006439,93760.085.04$52,638
Aug 20064210,76268.717.34$81,878
Jul 20063111,71569.376.34$76,456
Jun 20063411,95066.286.38$78,541
May 2006014,09966.016.42$90,586
Apr 2006015,30464.397.36$112,645
Mar 2006018,02956.707.08$127,698
Feb 2006019,35757.597.75$150,038
Jan 2006728,74160.598.93$257,177
Dec 2005040,87354.9413.42$548,328
Nov 200509,68954.6910.59$102,591

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,125 Mcf  × $  3.05 =     $3,427

────────────────────────────────────────────────────
Month total                                   $3,427

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/220606 is the state's own key, not one this site invented.