BENNETT GAS UNIT

Operated by WEATHERLY OIL & GAS, LLC (P-5 902815) in the NACONICHE CREEK (ROD.-TP CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220651District 06Field 643002872 tax incentive programmesCondensateGasSaveExport
Value, all time
$821 k
Jan 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 373 leases and 373 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-09-27.

The Commission's schedule remark for this field reads: BY HEARING.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-04168114
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition690 bbl$47,400
GasProduction136,930 Mcf$773,339
Total$820,739

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7571, -94.6601. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.75712, -94.66009 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,908 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,908 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-34732120139,908 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 201901353.112.30$30
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180961.782.77$25
Jan 20180062.874.01$0
Dec 201778057.272.92$4,467
Nov 20170055.423.12$0
Oct 201701949.292.98$57
Sep 2017012547.523.09$386
Aug 2017010045.373.00$300
Jul 20170443.873.09$12
Jun 2017010742.493.09$330
May 2017010945.373.26$356
Apr 2017013947.933.21$446
Mar 2017012046.772.98$358
Feb 2017015650.452.95$461
Jan 201701249.413.42$41
Dec 201609648.763.72$357
Nov 201609642.492.64$254
Oct 2016010446.193.09$321
Sep 2016034541.553.10$1,070
Aug 2016028941.442.92$845
Jul 2016032941.622.92$962
Jun 2016035845.352.69$962
May 2016040042.521.99$796
Apr 2016036136.561.99$719
Mar 2016046033.011.79$825
Feb 2016034526.472.06$712
Jan 2016045627.352.36$1,078
Dec 2015048032.362.00$961
Nov 201501,03438.792.17$2,241
Oct 2015046743.552.43$1,133
Sep 201515346742.992.76$7,866
Aug 2015043540.162.87$1,250
Jul 20150448.152.95$12
Jun 2015048956.152.88$1,410
May 2015049555.212.96$1,463
Apr 2015044049.822.71$1,191
Mar 2015049242.892.93$1,444
Feb 2015044444.662.98$1,321
Jan 2015052843.433.10$1,637
Dec 2014049254.693.59$1,767
Nov 2014050270.464.25$2,134
Oct 2014049678.303.90$1,935
Sep 2014051586.164.05$2,083
Aug 2014057789.394.04$2,328
Jul 2014042596.564.18$1,776
Jun 2014052198.164.74$2,468
May 2014049094.734.73$2,316
Apr 2014055095.944.81$2,645
Mar 2014049595.895.06$2,503
Feb 2014049197.406.19$3,040
Jan 2014055690.404.86$2,703
Dec 2013056591.824.35$2,460
Nov 2013055688.853.74$2,078
Oct 2013053897.423.78$2,033
Sep 20130532104.113.72$1,978
Aug 20130555104.253.52$1,955
Jul 20130497102.523.72$1,848
Jun 2013054794.403.93$2,152
May 2013055994.834.15$2,319
Apr 2013057193.964.28$2,445
Mar 2013057993.623.91$2,266
Feb 2013053091.233.42$1,813
Jan 2013055691.603.42$1,901
Dec 2012054286.773.42$1,854
Nov 2012052186.953.62$1,889
Oct 201216451089.383.40$16,392
Sep 2012057294.672.92$1,669
Aug 2012048192.662.91$1,399
Jul 2012056785.133.02$1,713
Jun 2012056479.822.52$1,421
May 2012063191.612.49$1,570
Apr 20120653101.652.00$1,304
Mar 20120640105.052.22$1,422
Feb 20120601101.102.57$1,545
Jan 2012066798.092.73$1,824
Dec 201101,26996.873.24$4,111
Nov 201101,21995.723.31$4,036
Oct 201101,25284.983.65$4,568
Sep 201101,23583.623.99$4,922
Aug 201101,35983.404.15$5,639
Jul 201101,24194.144.52$5,606
Jun 201101,31992.904.64$6,120
May 201101,30298.134.40$5,735
Apr 201101,421105.964.33$6,158
Mar 201101,30196.364.06$5,279
Feb 201101,34385.644.18$5,614
Jan 201101,00386.504.59$4,603
Dec 201001,41985.734.35$6,169
Nov 201001,35380.843.80$5,135
Oct 2010096078.103.51$3,369
Sep 201001,37472.633.98$5,468
Aug 201001,28173.684.42$5,661
Jul 201001,33772.554.74$6,333
Jun 201001,26970.364.91$6,231
May 201001,40571.124.24$5,950
Apr 201001,25381.694.12$5,166
Mar 201001,34678.394.39$5,907
Feb 201001,40873.585.44$7,663
Jan 2010083474.365.96$4,974
Dec 2009079371.445.48$4,349
Nov 2009077274.593.75$2,896
Oct 200912188772.544.11$12,423
Sep 2009083465.543.06$2,556
Aug 2009094367.423.22$3,035
Jul 2009087961.133.46$3,045
Jun 2009082766.163.90$3,221
May 2009085154.743.93$3,341
Apr 2009083546.773.59$2,996
Mar 2009050942.144.06$2,066
Feb 2009056532.814.63$2,618
Jan 2009086335.865.37$4,635
Dec 2008091737.105.98$5,481
Nov 2008078255.496.86$5,365
Oct 2008098075.246.92$6,784
Sep 20080840101.767.88$6,617
Aug 20080919114.228.48$7,796
Jul 20080917131.0811.39$10,444
Jun 20080976131.3313.03$12,720
May 20080878123.1711.57$10,162
Apr 200801,024110.3110.45$10,706
Mar 200801,056101.909.66$10,205
Feb 200801,05192.538.77$9,218
Jan 200801,10290.388.21$9,043
Dec 2007901,19288.337.30$16,654
Nov 2007074691.677.29$5,440
Oct 200701,01482.856.92$7,019
Sep 200711,09175.846.24$6,888
Aug 200701,10669.066.39$7,065
Jul 200701,32470.906.39$8,458
Jun 200701,52062.007.55$11,474
May 2007801,90658.747.85$19,654
Apr 200701,72059.617.81$13,425
Mar 200701,79556.927.30$13,107
Feb 200701,67055.108.22$13,721
Jan 200701,93650.306.73$13,023
Dec 200612,10856.656.92$14,641
Nov 200602,13554.207.62$16,263
Oct 200602,03554.906.01$12,238
Sep 200602,16560.085.04$10,906
Aug 200602,10268.717.34$15,429
Jul 200622,06169.376.34$13,211
Jun 200603,04266.286.38$19,420
May 20060066.016.42$0
Apr 200605,21564.397.36$38,385
Mar 200609,62056.707.08$68,138
Feb 200601,73357.597.75$13,433
Jan 200606,22060.598.93$55,565

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 53.11 =         $0
Gas                   13 Mcf  × $  2.30 =        $30

────────────────────────────────────────────────────
Month total                                      $30

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/220651 is the state's own key, not one this site invented.