MASSINGALE, J.

Operated by SHELBY OPERATING COMPANY (P-5 773678) in the WASKOM (TRAVIS PEAK 1) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 221362District 06Field 953698162 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.4 M
May 2006 – May 2026
Value, last 12 filed months
$144 k
at the published price for each month
Months reported
241
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 132 leases and 132 wells, and the rule below applies to all of them.

Discovered
1939-05-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1992-08-17.

The Commission's schedule remark for this field reads: EFFECTIVE JUNE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112011-12-14204091
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition19,218 bbl$1,384,986
GasProduction844,191 Mcf$4,031,660
Total$5,416,646

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4963, -94.0593. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.49629, -94.05932 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,456 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,456 ft.

Completions filed
May 2006
1 of 1 wells

1 well

42-2033314686,456 ftMay 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (241)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

241 months

May 202602,525106.413.05$7,691
Apr 202602,28098.932.87$6,543
Mar 202602,50689.753.15$7,893
Feb 20261742,33363.503.75$19,799
Jan 202602,64459.138.00$21,147
Dec 202502,83556.664.41$12,512
Nov 2025782,74558.593.93$15,348
Oct 202502,77459.383.30$9,168
Sep 202502,24062.743.08$6,892
Aug 202502,67263.933.01$8,055
Jul 20251662,81566.743.32$20,411
Jun 202502,66266.483.13$8,329
May 202502,80260.553.23$9,057
Apr 20251742,84762.363.54$20,938
Mar 202502,92967.704.27$12,502
Feb 202502,93270.884.34$12,727
Jan 20251693,38174.324.28$27,026
Dec 202402,54168.993.12$7,931
Nov 2024096369.052.20$2,117
Oct 202401,16471.372.28$2,656
Sep 202401,14169.612.36$2,698
Aug 202401,18975.632.06$2,454
Jul 202401,18479.932.15$2,542
Jun 202401,18378.082.63$3,116
May 20241742,59178.812.20$19,409
Apr 202402,31884.451.66$3,846
Mar 202402,42880.301.55$3,752
Feb 202402,32576.091.78$4,147
Jan 20241712,10773.023.30$19,435
Dec 202302,07371.262.61$5,412
Nov 202302,40577.892.81$6,752
Oct 202302,51185.443.09$7,752
Sep 202302,49089.042.74$6,810
Aug 20231672,34580.522.67$19,715
Jul 202302,35874.852.64$6,229
Jun 202302,01368.962.26$4,546
May 20231682,35970.622.23$17,119
Apr 202302,42878.122.24$5,433
Mar 202302,27172.852.39$5,435
Feb 202302,09675.112.47$5,168
Jan 20231692,51776.533.39$21,460
Dec 202202,45376.415.73$14,053
Nov 202202,40385.005.65$13,568
Oct 20221682,48487.185.86$29,212
Sep 202202,45984.888.16$20,074
Aug 202202,69494.529.13$24,589
Jul 20221722,747101.587.54$38,190
Jun 202202,571115.097.98$20,509
May 202202,556109.378.43$21,555
Apr 20221682,438104.226.84$34,179
Mar 202202,479108.885.08$12,584
Feb 202202,40191.054.86$11,666
Jan 202202,74581.844.54$12,456
Dec 202102,63971.323.90$10,290
Nov 20211712,56677.435.24$26,678
Oct 202102,54279.795.71$14,525
Sep 202102,54969.865.35$13,640
Aug 202102,70266.024.22$11,404
Jul 20211792,72270.783.98$23,509
Jun 202102,50869.493.38$8,479
May 202102,73863.483.02$8,262
Apr 20211662,64460.362.76$17,313
Mar 20211762,82261.302.72$18,456
Feb 202102,05357.805.55$11,390
Jan 202102,71050.412.81$7,616
Dec 202002,68844.642.68$7,192
Nov 202002,67838.772.71$7,248
Oct 20201693,05236.972.48$13,812
Sep 202002,43737.091.99$4,852
Aug 202002,71339.982.39$6,471
Jul 20201662,69238.371.83$11,283
Jun 202002,25634.901.69$3,813
May 20201682,80616.921.81$7,935
Apr 202003,04214.751.80$5,489
Mar 202002,91930.341.86$5,418
Feb 20201682,65749.881.98$13,642
Jan 202002,73357.252.09$5,725
Dec 201902,69059.012.30$6,199
Nov 20191712,57555.302.75$16,539
Oct 201902,88053.472.42$6,965
Sep 201902,39955.052.66$6,375
Aug 20191722,67453.112.30$15,297
Jul 201902,67356.272.46$6,576
Jun 201902,30052.782.49$5,730
May 20191682,45058.482.74$16,538
Apr 201902,44062.632.75$6,712
Mar 20191682,53356.803.06$17,299
Feb 201902,31450.852.79$6,461
Jan 20191682,62946.033.23$16,220
Dec 201802,81346.594.19$11,774
Nov 201802,66252.934.24$11,280
Oct 20181702,78361.443.40$19,902
Sep 201802,48659.543.11$7,726
Aug 201802,68259.403.07$8,225
Jul 20181692,71865.142.93$18,978
Jun 201802,67160.183.08$8,218
May 201802,38465.382.90$6,916
Apr 20181702,47563.842.90$18,032
Mar 201802,54761.222.79$7,098
Feb 201802,07361.782.77$5,734
Jan 20181562,37562.874.01$19,330
Dec 201702,74757.272.92$8,025
Nov 20171632,71355.423.12$17,494
Oct 201702,38249.292.98$7,107
Sep 20171712,62547.523.09$16,230
Aug 201702,76745.373.00$8,313
Jul 201702,43043.873.09$7,502
Jun 20171662,60642.493.09$15,099
May 201702,64245.373.26$8,622
Apr 20171742,68247.933.21$16,953
Mar 201702,73646.772.98$8,163
Feb 201702,41950.452.95$7,142
Jan 20171722,90449.413.42$18,427
Dec 201602,98248.763.72$11,101
Nov 20161722,80242.492.64$14,718
Oct 201603,06846.193.09$9,481
Sep 201602,68041.553.10$8,310
Aug 20161702,56141.442.92$14,534
Jul 201602,96541.622.92$8,671
Jun 201602,78245.352.69$7,472
May 20161672,60142.521.99$12,280
Apr 201602,73236.561.99$5,440
Mar 20161702,85933.011.79$10,741
Feb 201602,71426.472.06$5,601
Jan 20161603,02327.352.36$11,523
Dec 201503,08932.362.00$6,182
Nov 20151712,43938.792.17$11,919
Oct 201502,99643.552.43$7,270
Sep 201502,87242.992.76$7,922
Aug 20151592,91840.162.87$14,767
Jul 201503,01548.152.95$8,879
Jun 20151691,79156.152.88$14,653
May 201502,63755.212.96$7,794
Apr 201502,86549.822.71$7,754
Mar 20151663,14842.892.93$16,358
Feb 201502,74744.662.98$8,176
Jan 20151723,06443.433.10$16,970
Dec 201403,12154.693.59$11,209
Nov 20141732,79870.464.25$24,086
Oct 201402,70178.303.90$10,536
Sep 20141772,96486.164.05$27,241
Aug 201402,94189.394.04$11,867
Jul 201403,02996.564.18$12,660
Jun 20141802,77298.164.74$30,799
May 201403,06894.734.73$14,501
Apr 20141812,98795.944.81$31,730
Mar 201403,16895.895.06$16,020
Feb 201403,09497.406.19$19,158
Jan 20141833,39990.404.86$33,065
Dec 201303,54091.824.35$15,415
Nov 20131663,14788.853.74$26,513
Oct 201303,17197.423.78$11,984
Sep 20131793,314104.113.72$30,956
Aug 201303,160104.253.52$11,131
Jul 201303,019102.523.72$11,224
Jun 20131782,89194.403.93$28,175
May 201303,00994.834.15$12,485
Apr 20131822,85993.964.28$29,345
Mar 20131682,69893.623.91$26,285
Feb 201302,68991.233.42$9,196
Jan 20131712,96791.603.42$25,810
Dec 201203,35486.773.42$11,471
Nov 20121782,86786.953.62$25,870
Oct 201203,08389.383.40$10,481
Sep 20121753,05294.672.92$25,474
Aug 201203,09692.662.91$9,004
Jul 201203,37185.133.02$10,183
Jun 20121673,45079.822.52$22,021
May 20121773,64491.612.49$25,282
Apr 201202,969101.652.00$5,929
Mar 20121792,993105.052.22$25,455
Feb 201202,918101.102.57$7,500
Jan 20121812,88198.092.73$25,631
Dec 20111832,83096.873.24$26,896
Nov 201103,25295.723.31$10,768
Oct 20111783,38284.983.65$27,466
Sep 201103,26883.623.99$13,026
Aug 20111753,37083.404.15$28,578
Jul 20111773,55494.144.52$32,717
Jun 201103,03792.904.64$14,091
May 20111762,88998.134.40$29,996
Apr 201103,437105.964.33$14,893
Mar 20111773,88396.364.06$32,810
Feb 201103,44185.644.18$14,383
Jan 20111943,69086.504.59$33,714
Dec 20101964,02485.734.35$34,298
Nov 201004,01280.843.80$15,227
Oct 20101714,00078.103.51$27,391
Sep 201004,04072.633.98$16,077
Aug 20103523,92173.684.42$43,264
Jul 201004,03572.554.74$19,112
Jun 20101733,51670.364.91$29,437
May 201004,12171.124.24$17,453
Apr 20101834,06981.694.12$31,725
Mar 201003,86378.394.39$16,953
Feb 20101764,03473.585.44$34,905
Jan 20101534,48274.365.96$38,108
Dec 20091584,68271.445.48$36,962
Nov 20091774,27074.593.75$29,221
Oct 200904,44672.544.11$18,274
Sep 20091814,43165.543.06$25,443
Aug 20091774,53967.423.22$26,542
Jul 20091744,67161.133.46$26,819
Jun 200904,42266.163.90$17,224
May 20093654,94354.743.93$39,385
Apr 200904,47546.773.59$16,054
Mar 20091624,50842.144.06$25,125
Feb 20091784,63332.814.63$27,305
Jan 20091806,06035.865.37$39,003
Dec 20081765,92937.105.98$41,968
Nov 20081746,91855.496.86$57,115
Oct 200804,38875.246.92$30,374
Sep 20081785,092101.767.88$58,223
Aug 20081786,553114.228.48$75,920
Jul 20081656,033131.0811.39$90,341
Jun 20081896,119131.3313.03$104,568
May 20081956,772123.1711.57$102,399
Apr 20081776,796110.3110.45$90,576
Mar 20081707,008101.909.66$85,049
Feb 20081916,77392.538.77$77,076
Jan 20081827,97190.388.21$81,857
Dec 20071766,34688.337.30$61,884
Nov 20071968,25391.677.29$78,146
Oct 20071768,88482.856.92$76,076
Sep 20071839,07375.846.24$70,532
Aug 200717510,14769.066.39$76,904
Jul 200734111,13770.906.39$95,319
Jun 200717211,84862.007.55$100,098
May 200717613,35658.747.85$115,133
Apr 200717815,53959.617.81$131,896
Mar 200718214,34256.927.30$115,084
Feb 200736216,43855.108.22$155,001
Jan 200705,30050.306.73$35,652
Dec 200603,94056.656.92$27,259
Nov 200604,83354.207.62$36,815
Oct 2006012,07654.906.01$72,623
Sep 200608,22460.085.04$41,426
Aug 200601,27868.717.34$9,380
Jul 200601,48169.376.34$9,394
Jun 200601,48166.286.38$9,455
May 20060066.016.42$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                2,525 Mcf  × $  3.05 =     $7,691

────────────────────────────────────────────────────
Month total                                   $7,691

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/221362 is the state's own key, not one this site invented.