CRIM

Operated by SABINE OIL & GAS CORPORATION (P-5 742143) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 221596District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.1 M
May 2006 – Oct 2025
Value, last 12 filed months
$35 k
at the published price for each month
Months reported
234
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-12-15171806
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,544 bbl$112,637
GasProduction1,080,942 Mcf$5,986,786
Total$6,099,423

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1305, -94.7286. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.13051, -94.72860 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,950 ft
1 wells filed one
Completion to plug
19.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,950 ft.

Completions filed
May 2006
1 of 1 wells
Plug dates filed
Nov 2025
1 of 1 wells

Last completion to plug: a median of 19.5 years across the 1 well that filed both dates, with the middle half between 19.5 years and 19.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-40133777510,950 ftMay 2006Nov 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (234)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

234 months

Oct 2025084259.383.30$2,783
Sep 2025080362.743.08$2,471
Aug 2025083663.933.01$2,520
Jul 2025083766.743.32$2,775
Jun 2025084066.483.13$2,628
May 2025087960.553.23$2,841
Apr 2025086862.363.54$3,075
Mar 2025088867.704.27$3,790
Feb 2025079470.884.34$3,447
Jan 2025090974.324.28$3,889
Dec 2024092668.993.12$2,890
Nov 2024092469.052.20$2,031
Oct 2024096071.372.28$2,190
Sep 2024092669.612.36$2,189
Aug 2024095975.632.06$1,979
Jul 2024097779.932.15$2,097
Jun 2024094378.082.63$2,484
May 2024098478.812.20$2,163
Apr 2024094484.451.66$1,566
Mar 202401,00380.301.55$1,550
Feb 2024099676.091.78$1,777
Jan 202401,11073.023.30$3,660
Dec 202301,05171.262.61$2,744
Nov 202301,01777.892.81$2,855
Oct 202301,11885.443.09$3,452
Sep 2023088789.042.74$2,426
Aug 202301,02980.522.67$2,750
Jul 202301,08074.852.64$2,853
Jun 202301,05668.962.26$2,385
May 202301,24070.622.23$2,762
Apr 202301,07978.122.24$2,415
Mar 202301,21172.852.39$2,898
Feb 202301,35075.112.47$3,329
Jan 202301,15976.533.39$3,926
Dec 202201,44976.415.73$8,301
Nov 202201,57485.005.65$8,887
Oct 202201,80587.185.86$10,584
Sep 202201,92184.888.16$15,682
Aug 202201,86694.529.13$17,031
Jul 202201,976101.587.54$14,903
Jun 202202,062115.097.98$16,449
May 202202,305109.378.43$19,438
Apr 202202,146104.226.84$14,673
Mar 202201,929108.885.08$9,792
Feb 202202,05691.054.86$9,990
Jan 2022077181.844.54$3,499
Dec 2021075571.323.90$2,944
Nov 202101,07177.435.24$5,609
Oct 2021094479.795.71$5,394
Sep 2021043769.865.35$2,338
Aug 2021031766.024.22$1,338
Jul 202107170.783.98$283
Jun 2021010869.493.38$365
May 2021015763.483.02$474
Apr 2021016460.362.76$452
Mar 202108961.302.72$242
Feb 2021011757.805.55$649
Jan 2021044150.412.81$1,239
Dec 2020075444.642.68$2,017
Nov 202001,18138.772.71$3,196
Oct 202001,32236.972.48$3,276
Sep 202001,50037.091.99$2,987
Aug 202001,56439.982.39$3,730
Jul 2020601,43638.371.83$4,923
Jun 202001,44634.901.69$2,444
May 202001,94716.921.81$3,533
Apr 202001,84814.751.80$3,334
Mar 202002,06230.341.86$3,828
Feb 202001,62849.881.98$3,225
Jan 202001,96057.252.09$4,106
Dec 201901,59759.012.30$3,680
Nov 201901,13155.302.75$3,111
Oct 201901,49553.472.42$3,616
Sep 201901,51455.052.66$4,023
Aug 201901,57253.112.30$3,622
Jul 201901,66756.272.46$4,101
Jun 201901,59552.782.49$3,973
May 201901,82758.482.74$5,007
Apr 201901,84362.632.75$5,070
Mar 201901,82156.803.06$5,576
Feb 201901,68650.852.79$4,708
Jan 201901,69246.033.23$5,462
Dec 201801,33446.594.19$5,583
Nov 201801,27952.934.24$5,419
Oct 201801,44961.443.40$4,924
Sep 201801,53559.543.11$4,771
Aug 201801,77259.403.07$5,434
Jul 201801,69365.142.93$4,964
Jun 201801,64560.183.08$5,062
May 201801,83565.382.90$5,323
Apr 201801,63563.842.90$4,743
Mar 201802,02861.222.79$5,652
Feb 201801,49061.782.77$4,122
Jan 201801,57962.874.01$6,331
Dec 201701,71957.272.92$5,022
Nov 201701,72155.423.12$5,367
Oct 201701,84549.292.98$5,505
Sep 201701,86647.523.09$5,761
Aug 201702,25545.373.00$6,775
Jul 201702,45143.873.09$7,567
Jun 201702,30542.493.09$7,116
May 201702,40745.373.26$7,855
Apr 201702,36847.933.21$7,605
Mar 201702,56446.772.98$7,650
Feb 201702,51550.452.95$7,426
Jan 201702,93549.413.42$10,034
Dec 201602,08648.763.72$7,766
Nov 201602,25142.492.64$5,952
Oct 201602,35846.193.09$7,287
Sep 201602,30341.553.10$7,141
Aug 201602,70241.442.92$7,902
Jul 20161023,05741.622.92$13,185
Jun 201602,72045.352.69$7,305
May 201602,97442.521.99$5,921
Apr 201602,74936.561.99$5,473
Mar 201602,98433.011.79$5,353
Feb 201602,85026.472.06$5,881
Jan 201602,94527.352.36$6,963
Dec 201503,22232.362.00$6,449
Nov 201503,09438.792.17$6,706
Oct 201503,44243.552.43$8,352
Sep 201503,28242.992.76$9,053
Aug 201503,32840.162.87$9,560
Jul 201503,16648.152.95$9,324
Jun 201502,77556.152.88$8,000
May 201503,16155.212.96$9,342
Apr 201503,33249.822.71$9,018
Mar 201503,31742.892.93$9,734
Feb 201503,11144.662.98$9,259
Jan 201503,20443.433.10$9,934
Dec 201403,40954.693.59$12,243
Nov 201403,46770.464.25$14,741
Oct 201403,76778.303.90$14,695
Sep 201403,55786.164.05$14,390
Aug 201403,49089.394.04$14,083
Jul 201403,46396.564.18$14,474
Jun 201403,20398.164.74$15,172
May 201403,59294.734.73$16,978
Apr 201403,50595.944.81$16,856
Mar 201403,47395.895.06$17,562
Feb 201402,48097.406.19$15,356
Jan 201402,71790.404.86$13,207
Dec 201302,97391.824.35$12,946
Nov 201302,99088.853.74$11,177
Oct 201303,09297.423.78$11,686
Sep 201303,020104.113.72$11,228
Aug 201303,512104.253.52$12,371
Jul 20131113,615102.523.72$24,819
Jun 201303,33794.403.93$13,126
May 201303,57094.834.15$14,812
Apr 201303,43593.964.28$14,711
Mar 201303,66393.623.91$14,333
Feb 201302,99691.233.42$10,246
Jan 201303,73991.603.42$12,787
Dec 201203,75886.773.42$12,853
Nov 201203,79986.953.62$13,771
Oct 201203,94189.383.40$13,398
Sep 201203,80894.672.92$11,113
Aug 201203,84592.662.91$11,182
Jul 201203,93585.133.02$11,887
Jun 201203,83579.822.52$9,661
May 201203,97191.612.49$9,881
Apr 201204,172101.652.00$8,331
Mar 201204,199105.052.22$9,331
Feb 201204,026101.102.57$10,348
Jan 201204,33598.092.73$11,852
Dec 201104,15596.873.24$13,461
Nov 201104,35495.723.31$14,417
Oct 20111554,39184.983.65$29,193
Sep 2011164,20383.623.99$18,090
Aug 2011124,33783.404.15$18,996
Jul 2011133,92994.144.52$18,972
Jun 201132,85292.904.64$13,512
May 201173,84098.134.40$17,601
Apr 2011134,168105.964.33$19,439
Mar 201164,09396.364.06$17,185
Feb 2011103,84985.644.18$16,945
Jan 201194,16186.504.59$19,872
Dec 201085,08485.734.35$22,790
Nov 2010134,91480.843.80$19,701
Oct 201074,55878.103.51$16,540
Sep 2010104,67072.633.98$19,310
Aug 2010115,40873.684.42$24,710
Jul 2010165,63372.554.74$27,841
Jun 2010235,39670.364.91$28,115
May 2010135,29871.124.24$23,363
Apr 2010205,78181.694.12$25,467
Mar 2010306,43478.394.39$30,588
Feb 2010225,68573.585.44$32,559
Jan 2010287,33974.365.96$45,853
Dec 2009418,50071.445.48$49,541
Nov 2009315,08874.593.75$21,400
Oct 2009842,66072.544.11$17,027
Sep 200902,82065.543.06$8,643
Aug 200913,27367.423.22$10,602
Jul 200943,78561.133.46$13,358
Jun 200913,54166.163.90$13,858
May 200924,31854.743.93$17,061
Apr 200924,40546.773.59$15,896
Mar 2009135,88042.144.06$24,415
Feb 2009105,98732.814.63$28,066
Jan 200945,53635.865.37$29,877
Dec 2008217,34937.105.98$44,705
Nov 20082036,33155.496.86$54,697
Oct 2008116,90675.246.92$48,631
Sep 200886,741101.767.88$53,914
Aug 2008147,973114.228.48$69,234
Jul 2008148,371131.0811.39$97,176
Jun 2008168,298131.3313.03$110,246
May 2008189,424123.1711.57$111,293
Apr 2008159,675110.3110.45$102,805
Mar 20081710,710101.909.66$105,234
Feb 20081410,33492.538.77$91,931
Jan 20081211,15990.388.21$92,652
Dec 20071511,64388.337.30$86,342
Nov 20071012,13291.677.29$89,380
Oct 20071112,85982.856.92$89,921
Sep 20071513,10575.846.24$82,967
Aug 20071214,16869.066.39$91,333
Jul 20071315,11370.906.39$97,463
Jun 200719415,37362.007.55$128,070
May 2007016,58758.747.85$130,146
Apr 2007016,96959.617.81$132,446
Mar 2007018,80856.927.30$137,335
Feb 2007018,13055.108.22$148,956
Jan 2007021,49350.306.73$144,580
Dec 2006023,69956.656.92$163,960
Nov 2006025,88954.207.62$197,209
Oct 2006029,11554.906.01$175,092
Sep 2006032,87060.085.04$165,573
Aug 2006039,95168.717.34$293,237
Jul 2006051,01869.376.34$323,595
Jun 2006067,64366.286.38$431,825
May 200608,41066.016.42$54,034

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.38 =         $0
Gas                  842 Mcf  × $  3.30 =     $2,783

────────────────────────────────────────────────────
Month total                                   $2,783

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/221596 is the state's own key, not one this site invented.