Operated by R. LACY SERVICES, LTD. (P-5 687208) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 221981District 06Field 160321742 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.8 M
Jul 2006 – May 2026
Value, last 12 filed months
$212 k
at the published price for each month
Months reported
239
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-30169627
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,979 bbl$426,372
GasProduction1,411,516 Mcf$6,377,310
Total$6,803,682

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2872, -94.3478. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.28722, -94.34784 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,900 ft.

Completions filed
Jul 2006
1 of 1 wells

1 well

42-3653605179,900 ftJul 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (239)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

239 months

May 2026384,049106.413.05$16,376
Apr 2026384,05098.932.87$15,382
Mar 2026384,32789.753.15$17,038
Feb 2026323,92063.503.75$16,733
Jan 2026334,13359.138.00$35,007
Dec 2025244,32556.664.41$20,448
Nov 2025204,30158.593.93$18,059
Oct 202504,51459.383.30$14,918
Sep 202514,40362.743.08$13,610
Aug 202504,59063.933.01$13,838
Jul 202504,64466.743.32$15,396
Jun 202504,99666.483.13$15,631
May 202504,71560.553.23$15,240
Apr 202504,58462.363.54$16,242
Mar 202504,75467.704.27$20,292
Feb 202503,97270.884.34$17,242
Jan 202504,37774.324.28$18,728
Dec 202404,54968.993.12$14,199
Nov 202404,25669.052.20$9,357
Oct 202404,51071.372.28$10,289
Sep 202404,41469.612.36$10,436
Aug 202404,55775.632.06$9,404
Jul 202404,11879.932.15$8,840
Jun 202402,89778.082.63$7,631
May 202424,05778.812.20$9,077
Apr 2024142,75284.451.66$5,748
Mar 2024223,92880.301.55$7,836
Feb 2024203,57476.091.78$7,897
Jan 202403,74973.023.30$12,363
Dec 202304,20871.262.61$10,986
Nov 202303,67677.892.81$10,321
Oct 202304,05385.443.09$12,513
Sep 202304,13589.042.74$11,309
Aug 202303,74680.522.67$10,013
Jul 202303,89974.852.64$10,300
Jun 202303,90368.962.26$8,815
May 202303,70170.622.23$8,244
Apr 202303,45078.122.24$7,720
Mar 202303,74472.852.39$8,960
Feb 202303,36175.112.47$8,287
Jan 202302,87176.533.39$9,726
Dec 202203,95676.415.73$22,664
Nov 202203,68185.005.65$20,784
Oct 202204,75287.185.86$27,865
Sep 202203,48484.888.16$28,442
Aug 202204,46994.529.13$40,789
Jul 202203,846101.587.54$29,007
Jun 202204,415115.097.98$35,219
May 202204,418109.378.43$37,257
Apr 202203,496104.226.84$23,904
Mar 202203,896108.885.08$19,778
Feb 202203,66291.054.86$17,793
Jan 202204,36281.844.54$19,793
Dec 202104,27471.323.90$16,665
Nov 202104,29077.435.24$22,466
Oct 202104,71079.795.71$26,912
Sep 202104,79969.865.35$25,679
Aug 202104,88066.024.22$20,596
Jul 202105,38770.783.98$21,451
Jun 202104,67169.493.38$15,791
May 202104,83163.483.02$14,578
Apr 202104,68360.362.76$12,918
Mar 202104,84161.302.72$13,153
Feb 202103,99957.805.55$22,186
Jan 202104,83750.412.81$13,593
Dec 202024,90744.642.68$13,218
Nov 202014,68338.772.71$12,714
Oct 202004,94236.972.48$12,248
Sep 202004,59137.091.99$9,141
Aug 202004,96839.982.39$11,849
Jul 202004,69838.371.83$8,574
Jun 202004,55634.901.69$7,701
May 202014,83816.921.81$8,797
Apr 202004,67614.751.80$8,437
Mar 202054,93130.341.86$9,305
Feb 202044,30449.881.98$8,724
Jan 202055,05957.252.09$10,884
Dec 201944,30859.012.30$10,163
Nov 201954,65655.302.75$13,084
Oct 2019114,88853.472.42$12,410
Sep 2019104,81955.052.66$13,356
Aug 2019115,16653.112.30$12,489
Jul 201995,21656.272.46$13,338
Jun 201994,58352.782.49$11,892
May 2019104,76258.482.74$13,634
Apr 2019124,70662.632.75$13,696
Mar 2019204,84356.803.06$15,966
Feb 2019184,19450.852.79$12,626
Jan 2019205,12646.033.23$17,468
Dec 2018194,35546.594.19$19,113
Nov 2018184,66552.934.24$20,719
Oct 2018164,91361.443.40$17,678
Sep 2018164,86659.543.11$16,076
Aug 2018175,12659.403.07$16,729
Jul 2018185,25365.142.93$16,574
Jun 2018195,17060.183.08$17,051
May 2018215,30665.382.90$16,765
Apr 2018205,15363.842.90$16,225
Mar 2018235,55061.222.79$16,875
Feb 2018204,78761.782.77$14,477
Jan 2018125,46062.874.01$22,645
Dec 2017104,95957.272.92$15,061
Nov 201794,86755.423.12$15,676
Oct 2017105,48249.292.98$16,849
Sep 2017105,50447.523.09$17,468
Aug 2017125,69045.373.00$17,639
Jul 2017125,58143.873.09$17,757
Jun 2017125,72642.493.09$18,188
May 2017135,89045.373.26$19,811
Apr 2017115,18047.933.21$17,163
Mar 2017165,94846.772.98$18,495
Feb 2017115,19750.452.95$15,900
Jan 2017145,96349.413.42$21,078
Dec 2016146,15248.763.72$23,585
Nov 201605,58042.492.64$14,755
Oct 201605,96646.193.09$18,436
Sep 201605,62641.553.10$17,444
Aug 201605,96141.442.92$17,432
Jul 201605,91141.622.92$17,286
Jun 201605,63345.352.69$15,129
May 201606,19442.521.99$12,333
Apr 201605,64436.561.99$11,237
Mar 201606,23433.011.79$11,184
Feb 201606,56326.472.06$13,544
Jan 201606,71227.352.36$15,870
Dec 201507,01232.362.00$14,034
Nov 201507,16838.792.17$15,535
Oct 201507,51943.552.43$18,245
Sep 201507,32642.992.76$20,208
Aug 201507,77340.162.87$22,328
Jul 201507,69048.152.95$22,648
Jun 201507,77256.152.88$22,406
May 201508,60855.212.96$25,441
Apr 2015357,53249.822.71$22,130
Mar 2015844,89142.892.93$17,956
Feb 2015915,01044.662.98$18,975
Jan 20151126,01943.433.10$23,527
Dec 201415,02454.693.59$18,098
Nov 2014836,18170.464.25$32,129
Oct 2014716,07478.303.90$29,254
Sep 2014805,45286.164.05$28,949
Aug 201415,83989.394.04$23,650
Jul 2014836,14496.564.18$33,694
Jun 2014856,20398.164.74$37,726
May 201416,46894.734.73$30,666
Apr 20141126,73895.944.81$43,149
Mar 201425,95095.895.06$30,280
Feb 2014696,02097.406.19$43,996
Jan 2014746,43390.404.86$37,959
Dec 20132447,40491.824.35$54,645
Nov 20131448,70688.853.74$45,340
Oct 201315,19197.423.78$19,716
Sep 20131334,184104.113.72$29,402
Aug 20131424,158104.253.52$29,451
Jul 20131444,099102.523.72$30,002
Jun 201303,75094.403.93$14,750
May 20131243,83794.834.15$27,679
Apr 20131202,94493.964.28$23,883
Mar 20131154,62693.623.91$28,867
Feb 201304,33691.233.42$14,829
Jan 2013714,60391.603.42$22,245
Dec 2012973,46786.773.42$20,274
Nov 20121204,27586.953.62$25,931
Oct 201202,33389.383.40$7,931
Sep 20121163,63394.672.92$21,584
Aug 20121204,32492.662.91$23,694
Jul 20121215,08585.133.02$25,662
Jun 201214,85379.822.52$12,305
May 20121035,36491.612.49$22,783
Apr 2012904,273101.652.00$17,681
Mar 2012774,183105.052.22$17,384
Feb 2012974,960101.102.57$22,555
Jan 2012925,72298.092.73$24,669
Dec 2011954,84196.873.24$24,886
Nov 2011994,52895.723.31$24,470
Oct 20111065,21484.983.65$28,031
Sep 20111092,95783.623.99$20,901
Aug 201124,18383.404.15$17,523
Jul 20111054,93794.144.52$32,186
Jun 20111014,37092.904.64$29,659
May 20111015,71798.134.40$35,093
Apr 20111014,689105.964.33$31,021
Mar 2011924,80696.364.06$28,365
Feb 201104,28385.644.18$17,903
Jan 201104,83886.504.59$22,201
Dec 201005,19885.734.35$22,600
Nov 201004,86680.843.80$18,468
Oct 201004,38678.103.51$15,390
Sep 201005,28472.633.98$21,028
Aug 201005,39073.684.42$23,820
Jul 201003,97172.554.74$18,809
Jun 201003,51370.364.91$17,250
May 201004,29471.124.24$18,186
Apr 201004,98781.694.12$20,560
Mar 201004,59478.394.39$20,162
Feb 201004,32573.585.44$23,538
Jan 201005,49474.365.96$32,767
Dec 200905,84871.445.48$32,069
Nov 200906,49974.593.75$24,381
Oct 200906,59272.544.11$27,095
Sep 200906,29965.543.06$19,305
Aug 200906,42267.423.22$20,669
Jul 200905,46461.133.46$18,930
Jun 200906,38466.163.90$24,866
May 200908,07354.743.93$31,693
Apr 200906,25946.773.59$22,454
Mar 200908,38242.144.06$34,023
Feb 200904,57532.814.63$21,196
Jan 200908,14435.865.37$43,741
Dec 200808,27637.105.98$49,467
Nov 200808,00355.496.86$54,903
Oct 200806,81775.246.92$47,187
Sep 200804,982101.767.88$39,244
Aug 200806,354114.228.48$53,901
Jul 200806,418131.0811.39$73,097
Jun 200806,642131.3313.03$86,563
May 200807,439123.1711.57$86,101
Apr 200807,318110.3110.45$76,509
Mar 200808,194101.909.66$79,187
Feb 200809,42892.538.77$82,689
Jan 200809,02190.388.21$74,024
Dec 200707,92088.337.30$57,832
Nov 200707,48491.677.29$54,571
Oct 200708,13282.856.92$56,290
Sep 200708,04275.846.24$50,216
Aug 2007011,59169.066.39$74,043
Jul 2007012,71470.906.39$81,216
Jun 2007012,98562.007.55$98,017
May 2007013,81758.747.85$108,412
Apr 2007014,25059.617.81$111,224
Mar 2007015,47356.927.30$112,983
Feb 2007014,46155.108.22$118,812
Jan 2007017,84350.306.73$120,027
Dec 2006019,00156.656.92$131,457
Nov 2006021,55954.207.62$164,225
Oct 2006025,50454.906.01$153,376
Sep 2006027,07060.085.04$136,357
Aug 2006029,55168.717.34$216,902
Jul 2006012,87769.376.34$81,676

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            38 bbl  × $106.41 =     $4,044
Gas                4,049 Mcf  × $  3.05 =    $12,333

────────────────────────────────────────────────────
Month total                                  $16,376

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently