ODOM, JR GU 1

Operated by FAULCONER ENERGY, LLC (P-5 263648) in the OVERTON (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222442District 06Field 678491502 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.3 M
Jun 2006 – May 2026
Value, last 12 filed months
$92 k
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 702 leases and 702 wells, and the rule below applies to all of them.

Discovered
1977-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-03-25.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-09172207
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,664 bbl$383,030
GasProduction1,155,158 Mcf$5,868,130
Total$6,251,160

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1452, -95.1419. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.14517, -95.14192 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,328 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,328 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-42332088512,328 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202601,588106.413.05$4,837
Apr 2026531,37498.932.87$9,186
Mar 202601,83089.753.15$5,763
Feb 202601,71363.503.75$6,424
Jan 202601,87959.138.00$15,028
Dec 202502,02056.664.41$8,915
Nov 202501,94558.593.93$7,637
Oct 202502,07359.383.30$6,851
Sep 2025601,71462.743.08$9,038
Aug 202501,99363.933.01$6,008
Jul 202502,12166.743.32$7,032
Jun 202511,78166.483.13$5,639
May 2025621,95560.553.23$10,073
Apr 202501,70562.363.54$6,041
Mar 202521,78367.704.27$7,746
Feb 202521,89770.884.34$8,376
Jan 202502,12974.324.28$9,109
Dec 202402,11668.993.12$6,605
Nov 202401,92869.052.20$4,239
Oct 202402,02071.372.28$4,608
Sep 202411,85169.612.36$4,446
Aug 202411,89575.632.06$3,986
Jul 202401,93279.932.15$4,147
Jun 2024501,88978.082.63$8,880
May 202402,13078.812.20$4,683
Apr 202422,06184.451.66$3,589
Mar 202412,04880.301.55$3,245
Feb 202402,09376.091.78$3,733
Jan 2024532,16573.023.30$11,009
Dec 202312,06271.262.61$5,455
Nov 202301,99577.892.81$5,601
Oct 202302,09685.443.09$6,471
Sep 202302,07689.042.74$5,678
Aug 202301,98580.522.67$5,306
Jul 202302,11574.852.64$5,587
Jun 202302,06268.962.26$4,657
May 2023482,18770.622.23$8,261
Apr 202302,13078.122.24$4,766
Mar 202302,27472.852.39$5,442
Feb 202321,88775.112.47$4,803
Jan 202301,91576.533.39$6,487
Dec 202202,21876.415.73$12,707
Nov 202202,10285.005.65$11,868
Oct 202202,23587.185.86$13,106
Sep 202202,05284.888.16$16,752
Aug 202202,24594.529.13$20,490
Jul 202212,162101.587.54$16,408
Jun 202222,183115.097.98$17,644
May 202202,321109.378.43$19,573
Apr 202222,213104.226.84$15,340
Mar 202212,250108.885.08$11,531
Feb 202232,05391.054.86$10,248
Jan 202202,28781.844.54$10,378
Dec 202112,30271.323.90$9,047
Nov 202112,20377.435.24$11,614
Oct 202132,13679.795.71$12,444
Sep 202112,14469.865.35$11,542
Aug 202122,18666.024.22$9,358
Jul 202132,23470.783.98$9,108
Jun 202122,06169.493.38$7,106
May 2021352,17163.483.02$8,773
Apr 202101,96460.362.76$5,418
Mar 202101,72261.302.72$4,679
Feb 202101,20557.805.55$6,685
Jan 202102,00250.412.81$5,626
Dec 2020602,55444.642.68$9,512
Nov 202002,40838.772.71$6,517
Oct 202002,50436.972.48$6,206
Sep 202002,51237.091.99$5,001
Aug 202002,49339.982.39$5,946
Jul 202002,61638.371.83$4,775
Jun 202002,38834.901.69$4,036
May 2020582,70816.921.81$5,896
Apr 202002,48314.751.80$4,480
Mar 202002,63430.341.86$4,889
Feb 202002,33449.881.98$4,623
Jan 202002,59457.252.09$5,434
Dec 201902,56359.012.30$5,906
Nov 2019562,78355.302.75$10,752
Oct 201902,89953.472.42$7,011
Sep 201902,83955.052.66$7,544
Aug 2019582,91153.112.30$9,788
Jul 201902,98756.272.46$7,348
Jun 201902,69052.782.49$6,701
May 201903,11358.482.74$8,531
Apr 201903,08662.632.75$8,489
Mar 2019633,32056.803.06$13,745
Feb 201902,76950.852.79$7,732
Jan 201902,24946.033.23$7,260
Dec 201802,28646.594.19$9,568
Nov 201802,91652.934.24$12,356
Oct 201802,98161.443.40$10,130
Sep 2018702,99259.543.11$13,467
Aug 201813,12859.403.07$9,652
Jul 201803,19065.142.93$9,353
Jun 201803,12560.183.08$9,615
May 201803,25365.382.90$9,436
Apr 2018733,21063.842.90$13,972
Mar 201803,15561.222.79$8,792
Feb 201802,53661.782.77$7,015
Jan 201803,02962.874.01$12,144
Dec 201703,12857.272.92$9,139
Nov 2017723,08655.423.12$13,614
Oct 201703,32049.292.98$9,906
Sep 201703,13147.523.09$9,666
Aug 201713,23245.373.00$9,756
Jul 201703,24143.873.09$10,006
Jun 201703,21642.493.09$9,929
May 2017703,40745.373.26$14,294
Apr 201713,40947.933.21$10,996
Mar 201703,55946.772.98$10,619
Feb 201703,16750.452.95$9,351
Jan 2017843,01749.413.42$14,465
Dec 201603,05848.763.72$11,384
Nov 201602,76142.492.64$7,301
Oct 201603,00346.193.09$9,280
Sep 201613,05841.553.10$9,523
Aug 201602,86341.442.92$8,372
Jul 20161072,82741.622.92$12,720
Jun 201602,76845.352.69$7,434
May 201612,51142.521.99$5,042
Apr 201602,77936.561.99$5,533
Mar 201603,40333.011.79$6,105
Feb 20161062,62426.472.06$8,221
Jan 201603,00227.352.36$7,098
Dec 201512,91632.362.00$5,868
Nov 201502,91838.792.17$6,324
Oct 201503,17943.552.43$7,714
Sep 201503,05142.992.76$8,416
Aug 20151072,66540.162.87$11,952
Jul 201503,41048.152.95$10,043
Jun 201513,02056.152.88$8,762
May 201503,19455.212.96$9,440
Apr 201513,54049.822.71$9,631
Mar 201503,51942.892.93$10,327
Feb 20151013,29844.662.98$14,326
Jan 201503,51743.433.10$10,905
Dec 201403,97854.693.59$14,286
Nov 201403,86670.464.25$16,438
Oct 201404,18378.303.90$16,318
Sep 2014964,02586.164.05$24,554
Aug 201414,35889.394.04$17,674
Jul 201404,35396.564.18$18,194
Jun 201404,57198.164.74$21,652
May 2014674,53194.734.73$27,763
Apr 201403,41695.944.81$16,428
Mar 201414,04795.895.06$20,561
Feb 201403,57797.406.19$22,149
Jan 2014553,75690.404.86$23,229
Dec 201303,11091.824.35$13,542
Nov 201303,29388.853.74$12,310
Oct 201303,63397.423.78$13,730
Sep 201303,488104.113.72$12,967
Aug 2013473,919104.253.52$18,705
Jul 201304,099102.523.72$15,239
Jun 201304,20594.403.93$16,540
May 201304,02094.834.15$16,679
Apr 201303,46693.964.28$14,843
Mar 2013293,69993.623.91$17,189
Feb 201303,41591.233.42$11,679
Jan 201303,84891.603.42$13,160
Dec 201204,17986.773.42$14,293
Nov 2012684,44686.953.62$22,029
Oct 201203,01389.383.40$10,243
Sep 201203,30994.672.92$9,657
Aug 201204,59592.662.91$13,363
Jul 2012654,50385.133.02$19,136
Jun 201204,55979.822.52$11,484
May 201205,04191.612.49$12,544
Apr 201204,684101.652.00$9,353
Mar 2012634,890105.052.22$17,484
Feb 201204,713101.102.57$12,114
Jan 201204,81598.092.73$13,165
Dec 201104,91596.873.24$15,923
Nov 2011634,83195.723.31$22,027
Oct 201105,02184.983.65$18,319
Sep 201105,00683.623.99$19,953
Aug 201105,19583.404.15$21,556
Jul 2011625,23494.144.52$29,480
Jun 201105,10592.904.64$23,687
May 201105,44798.134.40$23,993
Apr 201105,224105.964.33$22,637
Mar 2011635,63596.364.06$28,934
Feb 201105,07385.644.18$21,205
Jan 201105,68586.504.59$26,087
Dec 2010605,80185.734.35$30,365
Nov 201005,52580.843.80$20,969
Oct 201005,88978.103.51$20,664
Sep 2010815,76472.633.98$28,821
Aug 201005,99173.684.42$26,476
Jul 201006,15072.554.74$29,129
Jun 201006,03270.364.91$29,620
May 201006,32671.124.24$26,792
Apr 2010886,18481.694.12$32,683
Mar 201006,38578.394.39$28,022
Feb 201005,94573.585.44$32,355
Jan 2010856,56374.365.96$45,463
Dec 200906,38371.445.48$35,003
Nov 20091126,66674.593.75$33,362
Oct 200906,95072.544.11$28,566
Sep 200906,80965.543.06$20,868
Aug 200907,31167.423.22$23,530
Jul 2009897,64861.133.46$31,937
Jun 200907,65966.163.90$29,832
May 20091437,86354.743.93$38,696
Apr 200908,10346.773.59$29,070
Mar 200908,92042.144.06$36,206
Feb 200907,12132.814.63$32,992
Jan 20092967,96735.865.37$53,405
Dec 200808,07937.105.98$48,289
Nov 200806,47555.496.86$44,421
Oct 200808,64475.246.92$59,834
Sep 2008888,505101.767.88$75,950
Aug 200807,808114.228.48$66,235
Jul 2008838,930131.0811.39$112,587
Jun 200808,995131.3313.03$117,229
May 20087111,470123.1711.57$141,502
Apr 200809,267110.3110.45$96,885
Mar 20085414,296101.909.66$143,660
Feb 2008599,25592.538.77$86,631
Jan 20086310,31990.388.21$90,369
Dec 200710010,18788.337.30$83,218
Nov 2007010,88091.677.29$79,334
Oct 200714111,41482.856.92$90,689
Sep 20079311,75375.846.24$80,441
Aug 20076612,86769.066.39$86,752
Jul 20077513,68670.906.39$92,743
Jun 2007014,08162.007.55$106,290
May 200713216,32558.747.85$135,844
Apr 20075812,29159.617.81$99,391
Mar 20079913,75856.927.30$106,096
Feb 20075912,65755.108.22$107,241
Jan 200712216,11850.306.73$114,560
Dec 200611417,53756.656.92$127,787
Nov 200610418,93454.207.62$149,866
Oct 20069420,19554.906.01$126,609
Sep 200614122,48060.085.04$121,708
Aug 20068327,24368.717.34$205,664
Jul 200632337,21169.376.34$258,427
Jun 200631930,47166.286.38$215,667

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,588 Mcf  × $  3.05 =     $4,837

────────────────────────────────────────────────────
Month total                                   $4,837

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/222442 is the state's own key, not one this site invented.