Operated by PROLINE ENERGY RESOURCES INC (P-5 681327) in the BECKVILLE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222533District 06Field 066485002 tax incentive programmesCondensateGasSaveExport
Value, all time
$613 k
Jul 2006 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
239
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 503 leases and 503 wells, and the rule below applies to all of them.

Discovered
1974-05-21
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2015-02-24.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-01-09172179
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition88 bbl$7,574
GasProduction100,486 Mcf$605,141
Total$612,714

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2140, -94.7319. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.21399, -94.73194 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,014 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,014 ft.

Completions filed
Jul 2006
1 of 1 wells

1 well

42-40133932111,014 ftJul 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (239)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

239 months

May 2026038106.413.05$116
Apr 202604098.932.87$115
Mar 202603289.753.15$101
Feb 202602563.503.75$94
Jan 202606559.138.00$520
Dec 202502756.664.41$119
Nov 202501758.593.93$67
Oct 202501559.383.30$50
Sep 202501862.743.08$55
Aug 202501463.933.01$42
Jul 202503466.743.32$113
Jun 202502966.483.13$91
May 202503860.553.23$123
Apr 202506262.363.54$220
Mar 202506567.704.27$277
Feb 202503770.884.34$161
Jan 202504474.324.28$188
Dec 202404768.993.12$147
Nov 202401569.052.20$33
Oct 202401771.372.28$39
Sep 202401269.612.36$28
Aug 202401775.632.06$35
Jul 20240179.932.15$2
Jun 202402178.082.63$55
May 20240578.812.20$11
Apr 202402284.451.66$37
Mar 202402480.301.55$37
Feb 202402076.091.78$36
Jan 2024012973.023.30$425
Dec 2023014671.262.61$381
Nov 202302877.892.81$79
Oct 202302485.443.09$74
Sep 202304089.042.74$109
Aug 202304080.522.67$107
Jul 202304574.852.64$119
Jun 202303968.962.26$88
May 2023011670.622.23$258
Apr 202301978.122.24$43
Mar 202304072.852.39$96
Feb 2023012075.112.47$296
Jan 20230776.533.39$24
Dec 202201676.415.73$92
Nov 202206085.005.65$339
Oct 202205787.185.86$334
Sep 202203984.888.16$318
Aug 202209794.529.13$885
Jul 2022051101.587.54$385
Jun 2022053115.097.98$423
May 20220144109.378.43$1,214
Apr 20220201104.226.84$1,374
Mar 20220318108.885.08$1,614
Feb 2022017891.054.86$865
Jan 2022023581.844.54$1,066
Dec 202106871.323.90$265
Nov 2021011977.435.24$623
Oct 2021014879.795.71$846
Sep 2021013069.865.35$696
Aug 2021026266.024.22$1,106
Jul 2021028770.783.98$1,143
Jun 2021031369.493.38$1,058
May 2021014863.483.02$447
Apr 2021030560.362.76$841
Mar 2021024361.302.72$660
Feb 2021016757.805.55$927
Jan 2021010350.412.81$289
Dec 202006844.642.68$182
Nov 202008538.772.71$230
Oct 2020015036.972.48$372
Sep 202007937.091.99$157
Aug 2020011139.982.39$265
Jul 202009638.371.83$175
Jun 2020033034.901.69$558
May 2020011516.921.81$209
Apr 2020012914.751.80$233
Mar 2020010830.341.86$200
Feb 202009549.881.98$188
Jan 202008257.252.09$172
Dec 2019015759.012.30$362
Nov 2019011155.302.75$305
Oct 2019015853.472.42$382
Sep 201906655.052.66$175
Aug 2019017953.112.30$412
Jul 20190056.272.46$0
Jun 2019035352.782.49$879
May 2019024858.482.74$680
Apr 201906462.632.75$176
Mar 201904956.803.06$150
Feb 201905750.852.79$159
Jan 201906446.033.23$207
Dec 201803946.594.19$163
Nov 201808852.934.24$373
Oct 2018010561.443.40$357
Sep 201807459.543.11$230
Aug 201808859.403.07$270
Jul 2018011965.142.93$349
Jun 201806960.183.08$212
May 2018013865.382.90$400
Apr 20180063.842.90$0
Mar 2018013561.222.79$376
Feb 2018012061.782.77$332
Jan 201801162.874.01$44
Dec 201701157.272.92$32
Nov 201703155.423.12$97
Oct 201706349.292.98$188
Sep 2017012447.523.09$383
Aug 20170045.373.00$0
Jul 201709143.873.09$281
Jun 201703642.493.09$111
May 2017011245.373.26$366
Apr 2017013147.933.21$421
Mar 201701646.772.98$48
Feb 201708550.452.95$251
Jan 2017066149.413.42$2,260
Dec 2016031348.763.72$1,165
Nov 2016023142.492.64$611
Oct 2016023046.193.09$711
Sep 2016026041.553.10$806
Aug 201603041.442.92$88
Jul 2016030041.622.92$877
Jun 201601,20045.352.69$3,223
May 201601,20042.521.99$2,389
Apr 2016024836.561.99$494
Mar 201610733.011.79$343
Feb 201603826.472.06$78
Jan 2016017827.352.36$421
Dec 201502032.362.00$40
Nov 2015057238.792.17$1,240
Oct 2015078843.552.43$1,912
Sep 201508142.992.76$223
Aug 201505740.162.87$164
Jul 201501948.152.95$56
Jun 201509156.152.88$262
May 2015026955.212.96$795
Apr 2015025749.822.71$696
Mar 2015068842.892.93$2,019
Feb 2015050044.662.98$1,488
Jan 201501,10943.433.10$3,439
Dec 2014012554.693.59$449
Nov 201402470.464.25$102
Oct 201408478.303.90$328
Sep 2014027886.164.05$1,125
Aug 2014037289.394.04$1,501
Jul 2014723296.564.18$1,646
Jun 2014021698.164.74$1,023
May 2014034594.734.73$1,631
Apr 201409695.944.81$462
Mar 201408595.895.06$430
Feb 201407397.406.19$452
Jan 201406690.404.86$321
Dec 201304591.824.35$196
Nov 201301788.853.74$64
Oct 2013012597.423.78$472
Sep 20130251104.113.72$933
Aug 20130124104.253.52$437
Jul 20130414102.523.72$1,539
Jun 20132344394.403.93$3,914
May 2013086794.834.15$3,597
Apr 2013072893.964.28$3,118
Mar 2013021693.623.91$845
Feb 2013136391.233.42$1,333
Jan 2013476791.603.42$4,534
Dec 2012019486.773.42$664
Nov 201207086.953.62$254
Oct 201204889.383.40$163
Sep 201204194.672.92$120
Aug 201209192.662.91$265
Jul 2012014785.133.02$444
Jun 201203479.822.52$86
May 201203091.612.49$75
Apr 2012034101.652.00$68
Mar 2012014105.052.22$31
Feb 201206101.102.57$15
Jan 201205998.092.73$161
Dec 201103096.873.24$97
Nov 201103595.723.31$116
Oct 201103784.983.65$135
Sep 201103983.623.99$155
Aug 201107983.404.15$328
Jul 2011011494.144.52$515
Jun 2011010992.904.64$506
May 2011015198.134.40$665
Apr 20110298105.964.33$1,291
Mar 2011015596.364.06$629
Feb 2011082085.644.18$3,428
Jan 201101486.504.59$64
Dec 201005285.734.35$226
Nov 2010028080.843.80$1,063
Oct 2010011278.103.51$393
Sep 201004172.633.98$163
Aug 2010013773.684.42$605
Jul 201006472.554.74$303
Jun 201001370.364.91$64
May 201001171.124.24$47
Apr 201002981.694.12$120
Mar 20100978.394.39$40
Feb 201001873.585.44$98
Jan 201002474.365.96$143
Dec 2009020671.445.48$1,130
Nov 2009018374.593.75$687
Oct 2009014972.544.11$612
Sep 200904765.543.06$144
Aug 2009025467.423.22$818
Jul 2009025261.133.46$873
Jun 2009026066.163.90$1,013
May 2009083854.743.93$3,290
Apr 2009031946.773.59$1,144
Mar 2009049042.144.06$1,989
Feb 2009036032.814.63$1,668
Jan 2009084835.865.37$4,555
Dec 2008040937.105.98$2,445
Nov 2008031555.496.86$2,161
Oct 2008030775.246.92$2,125
Sep 20080477101.767.88$3,757
Aug 200801,055114.228.48$8,950
Jul 20080800131.0811.39$9,112
Jun 20080811131.3313.03$10,569
May 20080809123.1711.57$9,364
Apr 200801,127110.3110.45$11,783
Mar 200801,690101.909.66$16,332
Feb 200801,20092.538.77$10,525
Jan 2008061990.388.21$5,079
Dec 2007092088.337.30$6,718
Nov 200701,32991.677.29$9,691
Oct 200701,59982.856.92$11,068
Sep 200701,47675.846.24$9,216
Aug 200701,92769.066.39$12,310
Jul 200701,97070.906.39$12,584
Jun 200701,86262.007.55$14,055
May 200702,69158.747.85$21,114
Apr 200702,07259.617.81$16,172
Mar 200702,92256.927.30$21,336
Feb 200702,65555.108.22$21,813
Jan 200703,65950.306.73$24,614
Dec 200602,72256.656.92$18,832
Nov 200602,84754.207.62$21,687
Oct 200604,52854.906.01$27,230
Sep 200606,78460.085.04$34,172
Aug 2006012,03368.717.34$88,321
Jul 200604,24769.376.34$26,938

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   38 Mcf  × $  3.05 =       $116

────────────────────────────────────────────────────
Month total                                     $116

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/222533 is the state's own key, not one this site invented.