BARTON, BOB J-RIDER GAS UNIT

Operated by MAG EXPLORATION LLC (P-5 102971) in the GARRISON (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223520District 06Field 340448002 tax incentive programmesCondensateGasSaveExport
Value, all time
$498 k
Nov 2006 – May 2026
Value, last 12 filed months
$398
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 93 leases and 93 wells, and the rule below applies to all of them.

Discovered
1975-06-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-03-06.

The Commission's schedule remark for this field reads: DOCKET #06-0250025.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-26173119
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,976 bbl$130,875
GasProduction77,815 Mcf$367,424
Total$498,299

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8559, -94.4679. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.85587, -94.46790 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,550 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,550 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-4013403719,550 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 202502863.933.01$84
Jul 202507066.743.32$232
Jun 202502666.483.13$81
May 202502660.553.23$84
Apr 2025010762.363.54$379
Mar 2025016767.704.27$713
Feb 2025015470.884.34$668
Jan 202508674.324.28$368
Dec 202407568.993.12$234
Nov 202408469.052.20$185
Oct 202403171.372.28$71
Sep 202405669.612.36$132
Aug 2024011275.632.06$231
Jul 202406079.932.15$129
Jun 202407078.082.63$184
May 20240078.812.20$0
Apr 202405584.451.66$91
Mar 202404880.301.55$74
Feb 202407476.091.78$132
Jan 202407073.023.30$231
Dec 202308971.262.61$232
Nov 202304377.892.81$121
Oct 202303985.443.09$120
Sep 202307889.042.74$213
Aug 202302080.522.67$53
Jul 2023019874.852.64$523
Jun 202303368.962.26$75
May 202302070.622.23$45
Apr 202302078.122.24$45
Mar 202301572.852.39$36
Feb 202302275.112.47$54
Jan 2023025376.533.39$857
Dec 202202276.415.73$126
Nov 20220485.005.65$23
Oct 20220887.185.86$47
Sep 202201184.888.16$90
Aug 202205494.529.13$493
Jul 2022027101.587.54$204
Jun 2022031115.097.98$247
May 2022032109.378.43$270
Apr 2022030104.226.84$205
Mar 2022025108.885.08$127
Feb 202203691.054.86$175
Jan 202203581.844.54$159
Dec 2021062471.323.90$2,433
Nov 202106977.435.24$361
Oct 202104679.795.71$263
Sep 202101669.865.35$86
Aug 202102666.024.22$110
Jul 202102470.783.98$96
Jun 202103569.493.38$118
May 202105963.483.02$178
Apr 202102560.362.76$69
Mar 202102661.302.72$71
Feb 202103357.805.55$183
Jan 202105650.412.81$157
Dec 202003644.642.68$96
Nov 202003138.772.71$84
Oct 202003736.972.48$92
Sep 202003037.091.99$60
Aug 202003039.982.39$72
Jul 202005238.371.83$95
Jun 202003134.901.69$52
May 202003116.921.81$56
Apr 2020011214.751.80$202
Mar 2020059230.341.86$1,099
Feb 202001949.881.98$38
Jan 2020064057.252.09$1,341
Dec 201902959.012.30$67
Nov 201902355.302.75$63
Oct 201903153.472.42$75
Sep 201902155.052.66$56
Aug 201904153.112.30$94
Jul 2019593056.272.46$3,394
Jun 201902452.782.49$60
May 201903158.482.74$85
Apr 2019012362.632.75$338
Mar 20190356.803.06$9
Feb 2019052850.852.79$1,474
Jan 201903146.033.23$100
Dec 2018050846.594.19$2,126
Nov 2018068652.934.24$2,907
Oct 201810927161.443.40$7,618
Sep 2018016759.543.11$519
Aug 2018015359.403.07$469
Jul 2018017165.142.93$501
Jun 2018021960.183.08$674
May 2018021065.382.90$609
Apr 2018020163.842.90$583
Mar 2018020661.222.79$574
Feb 201809961.782.77$274
Jan 2018026962.874.01$1,079
Dec 2017018657.272.92$543
Nov 2017014655.423.12$455
Oct 2017019749.292.98$588
Sep 201705447.523.09$167
Aug 2017017645.373.00$529
Jul 2017024543.873.09$756
Jun 2017029242.493.09$901
May 20170145.373.26$3
Apr 20170047.933.21$0
Mar 201789046.772.98$4,163
Feb 2017010650.452.95$313
Jan 2017011949.413.42$407
Dec 2016023148.763.72$860
Nov 2016067542.492.64$1,785
Oct 2016019446.193.09$600
Sep 201607341.553.10$226
Aug 201608841.442.92$257
Jul 2016025841.622.92$754
Jun 2016014245.352.69$381
May 2016010242.521.99$203
Apr 2016021436.561.99$426
Mar 2016016833.011.79$301
Feb 2016017826.472.06$367
Jan 201616521427.352.36$5,019
Dec 2015012332.362.00$246
Nov 2015014938.792.17$323
Oct 2015020643.552.43$500
Sep 2015019342.992.76$532
Aug 2015212340.162.87$434
Jul 2015052048.152.95$1,531
Jun 2015224256.152.88$810
May 2015118055.212.96$587
Apr 201509549.822.71$257
Mar 2015011042.892.93$323
Feb 20150744.662.98$21
Jan 2015820843.433.10$992
Dec 201403554.693.59$126
Nov 2014025070.464.25$1,063
Oct 2014017078.303.90$663
Sep 2014020386.164.05$821
Aug 201408589.394.04$343
Jul 2014021996.564.18$915
Jun 201407998.164.74$374
May 2014032794.734.73$1,546
Apr 2014011795.944.81$563
Mar 2014078195.895.06$3,949
Feb 2014028697.406.19$1,771
Jan 2014010390.404.86$501
Dec 201318310191.824.35$17,243
Nov 2013039088.853.74$1,458
Oct 201309997.423.78$374
Sep 20130211104.113.72$784
Aug 20130278104.253.52$979
Jul 20130126102.523.72$468
Jun 201305994.403.93$232
May 201301,28294.834.15$5,319
Apr 2013013793.964.28$587
Mar 2013022593.623.91$880
Feb 2013013191.233.42$448
Jan 2013031491.603.42$1,074
Dec 2012029986.773.42$1,023
Nov 201205286.953.62$189
Oct 2012039389.383.40$1,336
Sep 2012037294.672.92$1,086
Aug 2012028192.662.91$817
Jul 2012054985.133.02$1,658
Jun 2012032579.822.52$819
May 2012034791.612.49$863
Apr 2012041101.652.00$82
Mar 20120259105.052.22$576
Feb 20120219101.102.57$563
Jan 20123730398.092.73$4,458
Dec 2011026596.873.24$859
Nov 201116833095.723.31$17,174
Oct 2011034384.983.65$1,251
Sep 2011034383.623.99$1,367
Aug 2011031283.404.15$1,295
Jul 2011033894.144.52$1,527
Jun 2011020792.904.64$960
May 2011035898.134.40$1,577
Apr 20110249105.964.33$1,079
Mar 2011029396.364.06$1,189
Feb 2011047085.644.18$1,965
Jan 201118942186.504.59$18,280
Dec 2010043085.734.35$1,870
Nov 2010043080.843.80$1,632
Oct 2010065478.103.51$2,295
Sep 2010091272.633.98$3,629
Aug 201001,16973.684.42$5,166
Jul 2010056172.554.74$2,657
Jun 2010079370.364.91$3,894
May 2010077671.124.24$3,287
Apr 2010099881.694.12$4,114
Mar 2010081378.394.39$3,568
Feb 2010081073.585.44$4,408
Jan 201020297074.365.96$20,806
Dec 200901,15571.445.48$6,334
Nov 200901,20374.593.75$4,513
Oct 200901,52472.544.11$6,264
Sep 200901,60265.543.06$4,910
Aug 20091911,73867.423.22$18,471
Jul 200901,70161.133.46$5,893
Jun 200902,44766.163.90$9,531
May 20091842,47554.743.93$19,788
Apr 200903,11246.773.59$11,164
Mar 200901,39942.144.06$5,679
Feb 200903832.814.63$176
Jan 200902235.865.37$118
Dec 200804237.105.98$251
Nov 200804055.496.86$274
Oct 200808475.246.92$581
Sep 2008032101.767.88$252
Aug 20080205114.228.48$1,739
Jul 20080234131.0811.39$2,665
Jun 2008045131.3313.03$586
May 2008021123.1711.57$243
Apr 20080189110.3110.45$1,976
Mar 2008023101.909.66$222
Feb 200801292.538.77$105
Jan 200802490.388.21$197
Dec 200703188.337.30$226
Nov 200701891.677.29$131
Oct 200704682.856.92$318
Sep 200703875.846.24$237
Aug 200706669.066.39$422
Jul 200708270.906.39$524
Jun 2007019162.007.55$1,442
May 2007096658.747.85$7,580
Apr 200701,19959.617.81$9,358
Mar 2007061856.927.30$4,513
Feb 200701,41655.108.22$11,634
Jan 20071842,48550.306.73$25,971
Dec 20062037,91356.656.92$66,246
Nov 200605,17254.207.62$39,398

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 63.93 =         $0
Gas                   28 Mcf  × $  3.01 =        $84

────────────────────────────────────────────────────
Month total                                      $84

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/223520 is the state's own key, not one this site invented.