Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223759District 06Field 160321742 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.1 M
Nov 2006 – May 2026
Value, last 12 filed months
$70 k
at the published price for each month
Months reported
235
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-02-16172166
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,146 bbl$575,759
GasProduction704,779 Mcf$3,563,917
Total$4,139,675

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0575, -94.3768. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.05752, -94.37684 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,728 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,728 ft.

Completions filed
Nov 2006
1 of 1 wells

1 well

42-3653628289,728 ftNov 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (235)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

235 months

May 202601,598106.413.05$4,867
Apr 202601,48798.932.87$4,267
Mar 202601,53989.753.15$4,847
Feb 202601,47063.503.75$5,513
Jan 202601,33459.138.00$10,669
Dec 202501,60756.664.41$7,092
Nov 202501,54158.593.93$6,051
Oct 202511,58359.383.30$5,291
Sep 202571,51662.743.08$5,104
Aug 202571,53863.933.01$5,084
Jul 202591,55966.743.32$5,769
Jun 202581,52366.483.13$5,297
May 202591,53060.553.23$5,490
Apr 2025101,45762.363.54$5,786
Mar 2025111,45667.704.27$6,959
Feb 2025101,40870.884.34$6,821
Jan 2025111,52174.324.28$7,325
Dec 2024101,46768.993.12$5,269
Nov 202491,37969.052.20$3,653
Oct 202491,47471.372.28$4,005
Sep 202481,52369.612.36$4,158
Aug 202481,66275.632.06$4,035
Jul 2024111,47379.932.15$4,041
Jun 2024101,46178.082.63$4,629
May 2024111,55278.812.20$4,279
Apr 2024111,49684.451.66$3,411
Mar 2024121,36580.301.55$3,073
Feb 2024131,36176.091.78$3,417
Jan 2024111,51273.023.30$5,789
Dec 2023111,48971.262.61$4,671
Nov 2023111,45577.892.81$4,942
Oct 2023101,52885.443.09$5,572
Sep 202391,52089.042.74$4,959
Aug 2023101,59880.522.67$5,076
Jul 2023101,58374.852.64$4,930
Jun 202391,45268.962.26$3,900
May 202391,55670.622.23$4,101
Apr 202391,42178.122.24$3,883
Mar 2023111,53072.852.39$4,463
Feb 2023101,40875.112.47$4,223
Jan 2023121,55676.533.39$6,190
Dec 2022121,53876.415.73$9,728
Nov 2022111,50685.005.65$9,438
Oct 2022111,58287.185.86$10,235
Sep 2022101,50984.888.16$13,168
Aug 2022101,53994.529.13$14,992
Jul 2022101,340101.587.54$11,122
Jun 2022101,173115.097.98$10,508
May 2022171,280109.378.43$12,654
Apr 2022191,234104.226.84$10,418
Mar 2022221,331108.885.08$9,152
Feb 2022161,22891.054.86$7,423
Jan 2022201,34481.844.54$7,735
Dec 2021201,65971.323.90$7,895
Nov 2021181,43477.435.24$8,903
Oct 2021181,67579.795.71$11,007
Sep 2021171,64669.865.35$9,995
Aug 2021181,69666.024.22$8,346
Jul 2021181,71470.783.98$8,099
Jun 2021181,69069.493.38$6,964
May 2021201,70663.483.02$6,418
Apr 2021181,43860.362.76$5,053
Mar 2021201,38661.302.72$4,992
Feb 2021141,22657.805.55$7,611
Jan 2021211,86950.412.81$6,311
Dec 2020201,86744.642.68$5,888
Nov 2020181,87738.772.71$5,778
Oct 2020181,92036.972.48$5,424
Sep 2020171,83837.091.99$4,290
Aug 2020171,86739.982.39$5,133
Jul 2020161,74338.371.83$3,795
Jun 202001,76434.901.69$2,982
May 202001,74616.921.81$3,169
Apr 202001,42014.751.80$2,562
Mar 202001,77730.341.86$3,299
Feb 202001,63749.881.98$3,242
Jan 202001,68457.252.09$3,528
Dec 201901,75759.012.30$4,049
Nov 201901,55855.302.75$4,286
Oct 201901,68253.472.42$4,068
Sep 201931,64055.052.66$4,523
Aug 2019121,17053.112.30$3,333
Jul 2019121,42456.272.46$4,178
Jun 2019181,77852.782.49$5,379
May 2019222,12158.482.74$7,099
Apr 2019232,07962.632.75$7,159
Mar 2019252,11556.803.06$7,896
Feb 2019231,95350.852.79$6,623
Jan 2019262,13946.033.23$8,102
Dec 2018262,12246.594.19$10,093
Nov 2018212,16252.934.24$10,272
Oct 2018222,24361.443.40$8,974
Sep 2018202,03059.543.11$7,500
Aug 2018202,03659.403.07$7,432
Jul 2018232,19665.142.93$7,937
Jun 2018192,12160.183.08$7,670
May 2018192,16265.382.90$7,514
Apr 2018191,99963.842.90$7,012
Mar 2018212,16261.222.79$7,311
Feb 2018171,91261.782.77$6,339
Jan 2018122,04762.874.01$8,962
Dec 201771,03857.272.92$3,433
Nov 201781,22555.423.12$4,263
Oct 201781,26849.292.98$4,178
Sep 201771,25347.523.09$4,201
Aug 201781,30945.373.00$4,296
Jul 2017171,33743.873.09$4,873
Jun 201791,32942.493.09$4,485
May 201791,27845.373.26$4,579
Apr 2017101,26647.933.21$4,545
Mar 2017111,47746.772.98$4,921
Feb 2017101,46850.452.95$4,839
Jan 2017111,54849.413.42$5,836
Dec 2016101,79148.763.72$7,155
Nov 201691,85142.492.64$5,277
Oct 201672,04046.193.09$6,627
Sep 201661,98741.553.10$6,410
Aug 201682,10741.442.92$6,493
Jul 201682,08241.622.92$6,421
Jun 201682,19045.352.69$6,245
May 2016102,46342.521.99$5,329
Apr 2016312,34636.561.99$5,804
Mar 2016422,48033.011.79$5,836
Feb 2016412,34926.472.06$5,933
Jan 2016402,37627.352.36$6,712
Dec 2015372,32732.362.00$5,855
Nov 2015382,34038.792.17$6,546
Oct 2015322,34943.552.43$7,094
Sep 2015332,37642.992.76$7,973
Aug 2015332,45840.162.87$8,386
Jul 2015362,46748.152.95$8,999
Jun 2015372,43156.152.88$9,086
May 2015382,47655.212.96$9,416
Apr 2015382,18649.822.71$7,810
Mar 2015412,50742.892.93$9,116
Feb 2015252,27144.662.98$7,875
Jan 2015472,56343.433.10$9,988
Dec 2014592,57954.693.59$12,489
Nov 2014512,46970.464.25$14,091
Oct 2014452,26478.303.90$12,355
Sep 2014331,80786.164.05$10,153
Aug 2014412,31989.394.04$13,022
Jul 2014452,33196.564.18$14,088
Jun 2014132,14298.164.74$11,422
May 2014182,33594.734.73$12,742
Apr 2014272,36795.944.81$13,974
Mar 2014272,73595.895.06$16,419
Feb 2014262,52097.406.19$18,136
Jan 2014282,68290.404.86$15,568
Dec 2013282,83391.824.35$14,907
Nov 2013272,82688.853.74$12,963
Oct 2013262,89397.423.78$13,467
Sep 2013252,770104.113.72$12,901
Aug 2013242,856104.253.52$12,563
Jul 2013282,878102.523.72$13,570
Jun 2013252,72794.403.93$13,086
May 2013272,79894.834.15$14,170
Apr 2013302,81893.964.28$14,887
Mar 2013282,55293.623.91$12,607
Feb 2013272,19191.233.42$9,956
Jan 2013292,54691.603.42$11,363
Dec 2012262,48786.773.42$10,762
Nov 2012152,41786.953.62$10,066
Oct 2012152,03989.383.40$8,273
Sep 2012142,55394.672.92$8,776
Aug 2012152,97692.662.91$10,045
Jul 2012132,50885.133.02$8,683
Jun 2012152,63679.822.52$7,837
May 2012152,38291.612.49$7,301
Apr 2012182,706101.652.00$7,233
Mar 2012111,598105.052.22$4,706
Feb 2012141,931101.102.57$6,379
Jan 2012172,37998.092.73$8,172
Dec 2011162,37396.873.24$9,238
Nov 2011121,89595.723.31$7,424
Oct 2011132,39084.983.65$9,825
Sep 2011202,30683.623.99$10,864
Aug 2011262,68283.404.15$13,297
Jul 2011272,55794.144.52$14,092
Jun 2011272,36592.904.64$13,482
May 2011322,55898.134.40$14,408
Apr 201100105.964.33$0
Mar 2011592,99996.364.06$17,853
Feb 2011602,87885.644.18$17,168
Jan 2011593,30986.504.59$20,288
Dec 2010723,75585.734.35$22,498
Nov 2010453,99580.843.80$18,800
Oct 2010414,08578.103.51$17,536
Sep 2010393,94672.633.98$18,536
Aug 2010374,10673.684.42$20,872
Jul 2010373,94172.554.74$21,351
Jun 2010414,04570.364.91$22,747
May 2010554,52271.124.24$23,063
Apr 2010574,45381.694.12$23,015
Mar 2010644,56378.394.39$25,042
Feb 2010634,46073.585.44$28,908
Jan 2010675,24074.365.96$36,234
Dec 2009654,69371.445.48$30,379
Nov 2009524,56474.593.75$21,001
Oct 2009554,88472.544.11$24,064
Sep 2009284,64565.543.06$16,071
Aug 2009274,93967.423.22$17,717
Jul 2009295,25061.133.46$19,961
Jun 2009315,26266.163.90$22,546
May 2009315,33854.743.93$22,653
Apr 2009685,32846.773.59$22,295
Mar 20091266,02342.144.06$29,757
Feb 2009461,90132.814.63$10,317
Jan 20091095,51535.865.37$33,530
Dec 20081115,65937.105.98$37,943
Nov 20081055,44255.496.86$43,161
Oct 2008976,02175.246.92$48,976
Sep 2008644,672101.767.88$43,314
Aug 2008685,378114.228.48$53,389
Jul 2008806,267131.0811.39$81,864
Jun 2008866,482131.3313.03$95,772
May 2008987,198123.1711.57$95,382
Apr 20081107,151110.3110.45$86,897
Mar 20081046,246101.909.66$70,959
Feb 20081136,25192.538.77$65,281
Jan 20081217,11590.388.21$69,320
Dec 20071247,48388.337.30$65,594
Nov 2007997,31791.677.29$62,429
Oct 20071327,92982.856.92$65,821
Sep 20071268,17875.846.24$60,621
Aug 20071389,33669.066.39$69,168
Jul 200713910,23170.906.39$75,210
Jun 200713410,09362.007.55$84,495
May 200716312,03758.747.85$104,020
Apr 200713412,88359.617.81$108,542
Mar 200724813,85156.927.30$115,256
Feb 200722713,18455.108.22$120,827
Jan 200726315,40050.306.73$116,822
Dec 200636021,99656.656.92$172,572
Nov 200614717,77654.207.62$143,376

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,598 Mcf  × $  3.05 =     $4,867

────────────────────────────────────────────────────
Month total                                   $4,867

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/223759 is the state's own key, not one this site invented.