BROOKS, A. GAS UNIT

Operated by PROLINE ENERGY RESOURCES INC (P-5 681327) in the BECKVILLE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224182District 06Field 066485002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.3 M
Jul 2006 – May 2026
Value, last 12 filed months
$15 k
at the published price for each month
Months reported
239
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 503 leases and 503 wells, and the rule below applies to all of them.

Discovered
1974-05-21
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2015-02-24.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-05-07174714
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,152 bbl$230,505
GasProduction529,684 Mcf$3,029,839
Total$3,260,344

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1876, -94.6027. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.18757, -94.60267 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,398 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,398 ft.

Completions filed
Jul 2006
1 of 1 wells

1 well

42-40133957410,398 ftJul 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (239)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

239 months

May 20260142106.413.05$433
Apr 2026019098.932.87$545
Mar 2026020989.753.15$658
Feb 2026026763.503.75$1,001
Jan 2026042959.138.00$3,431
Dec 2025028956.664.41$1,275
Nov 2025038458.593.93$1,508
Oct 202509259.383.30$304
Sep 2025050862.743.08$1,563
Aug 2025043263.933.01$1,302
Jul 2025040766.743.32$1,349
Jun 2025042466.483.13$1,327
May 2025042560.553.23$1,374
Apr 2025038362.363.54$1,357
Mar 2025054067.704.27$2,305
Feb 2025043770.884.34$1,897
Jan 2025038374.324.28$1,639
Dec 2024066368.993.12$2,069
Nov 2024050869.052.20$1,117
Oct 2024042971.372.28$979
Sep 2024046369.612.36$1,095
Aug 2024050375.632.06$1,038
Jul 2024046779.932.15$1,002
Jun 2024030178.082.63$793
May 2024042878.812.20$941
Apr 2024058384.451.66$967
Mar 2024012680.301.55$195
Feb 202408676.091.78$153
Jan 202408273.023.30$270
Dec 202309871.262.61$256
Nov 202308577.892.81$239
Oct 202309985.443.09$306
Sep 2023011989.042.74$325
Aug 202309480.522.67$251
Jul 2023011474.852.64$301
Jun 2023010168.962.26$228
May 2023013570.622.23$301
Apr 202308078.122.24$179
Mar 2023011672.852.39$278
Feb 202309875.112.47$242
Jan 2023011476.533.39$386
Dec 202209776.415.73$556
Nov 2022011585.005.65$649
Oct 20221411187.185.86$1,871
Sep 2022015484.888.16$1,257
Aug 2022011194.529.13$1,013
Jul 20220137101.587.54$1,033
Jun 202210129115.097.98$2,180
May 20220130109.378.43$1,096
Apr 20220120104.226.84$821
Mar 20220128108.885.08$650
Feb 2022011091.054.86$534
Jan 2022012681.844.54$572
Dec 2021012971.323.90$503
Nov 2021012977.435.24$676
Oct 202107979.795.71$451
Sep 202108069.865.35$428
Aug 2021010166.024.22$426
Jul 202107870.783.98$311
Jun 202107169.493.38$240
May 202108063.483.02$241
Apr 202105460.362.76$149
Mar 202107061.302.72$190
Feb 202107157.805.55$394
Jan 202106650.412.81$185
Dec 202006544.642.68$174
Nov 2020010338.772.71$279
Oct 202008436.972.48$208
Sep 202009837.091.99$195
Aug 202008439.982.39$200
Jul 202008538.371.83$155
Jun 202006534.901.69$110
May 202008216.921.81$149
Apr 202006414.751.80$115
Mar 202007630.341.86$141
Feb 2020010349.881.98$204
Jan 202005357.252.09$111
Dec 201909859.012.30$226
Nov 201937955.302.75$383
Oct 2019012053.472.42$290
Sep 201927555.052.66$309
Aug 2019011853.112.30$272
Jul 2019074956.272.46$1,843
Jun 2019021552.782.49$536
May 2019025358.482.74$693
Apr 2019020762.632.75$569
Mar 20191636156.803.06$2,014
Feb 20191140150.852.79$1,679
Jan 2019035346.033.23$1,140
Dec 2018036146.594.19$1,511
Nov 2018031252.934.24$1,322
Oct 2018032161.443.40$1,091
Sep 2018034059.543.11$1,057
Aug 2018032059.403.07$981
Jul 201804565.142.93$132
Jun 201804960.183.08$151
May 201805165.382.90$148
Apr 2018050363.842.90$1,459
Mar 201801,12661.222.79$3,138
Feb 201801,19961.782.77$3,317
Jan 201801,42862.874.01$5,725
Dec 201701,42857.272.92$4,172
Nov 201701,20355.423.12$3,751
Oct 201701,21949.292.98$3,637
Sep 201701,11047.523.09$3,427
Aug 201701,64245.373.00$4,933
Jul 2017141,13243.873.09$4,109
Jun 2017141,07242.493.09$3,904
May 201701,21745.373.26$3,972
Apr 2017050047.933.21$1,606
Mar 2017048646.772.98$1,450
Feb 2017053750.452.95$1,586
Jan 2017051349.413.42$1,754
Dec 2016046848.763.72$1,742
Nov 2016062242.492.64$1,645
Oct 2016067346.193.09$2,080
Sep 2016067041.553.10$2,077
Aug 2016067041.442.92$1,959
Jul 2016061041.622.92$1,784
Jun 20163092145.352.69$3,834
May 2016071242.521.99$1,418
Apr 201601,16836.561.99$2,326
Mar 20166033.011.79$198
Feb 20160026.472.06$0
Jan 2016020127.352.36$475
Dec 2015077732.362.00$1,555
Nov 2015057938.792.17$1,255
Oct 2015067043.552.43$1,626
Sep 20153186042.992.76$3,705
Aug 2015091240.162.87$2,620
Jul 2015093748.152.95$2,760
Jun 2015041956.152.88$1,208
May 2015057255.212.96$1,691
Apr 2015055449.822.71$1,499
Mar 2015062942.892.93$1,846
Feb 2015035144.662.98$1,045
Jan 2015067843.433.10$2,102
Dec 2014073054.693.59$2,622
Nov 2014079770.464.25$3,389
Oct 2014097078.303.90$3,784
Sep 201401,44286.164.05$5,834
Aug 2014141,55889.394.04$7,538
Jul 201441,10496.564.18$5,001
Jun 2014094398.164.74$4,467
May 201401,45394.734.73$6,868
Apr 2014321,64495.944.81$10,976
Mar 201401,60395.895.06$8,106
Feb 201401,62197.406.19$10,037
Jan 201401,74490.404.86$8,477
Dec 201301,48591.824.35$6,466
Nov 201301,04888.853.74$3,918
Oct 201301,53497.423.78$5,798
Sep 201301,346104.113.72$5,004
Aug 201301,530104.253.52$5,390
Jul 2013331,575102.523.72$9,239
Jun 201301,34294.403.93$5,279
May 201301,49394.834.15$6,195
Apr 201301,45993.964.28$6,248
Mar 2013351,42093.623.91$8,833
Feb 201321,53391.233.42$5,425
Jan 201321,93491.603.42$6,797
Dec 2012302,08786.773.42$9,741
Nov 2012552,55186.953.62$14,030
Oct 201212,71889.383.40$9,330
Sep 201232,10294.672.92$6,418
Aug 201212,49492.662.91$7,346
Jul 201232,70285.133.02$8,418
Jun 2012872,70479.822.52$13,756
May 201212,94391.612.49$7,415
Apr 2012162,898101.652.00$7,413
Mar 201233,065105.052.22$7,126
Feb 2012662,779101.102.57$13,815
Jan 201203,04298.092.73$8,317
Dec 2011743,09596.873.24$17,195
Nov 201102,87095.723.31$9,503
Oct 201103,12884.983.65$11,413
Sep 201102,97883.623.99$11,870
Aug 2011363,10383.404.15$15,878
Jul 201103,72794.144.52$16,836
Jun 2011473,83192.904.64$22,142
May 20112554,10098.134.40$43,083
Apr 201103,690105.964.33$15,990
Mar 201104,80396.364.06$19,487
Feb 201103,80585.644.18$15,905
Jan 201103,86986.504.59$17,754
Dec 201003,41485.734.35$14,843
Nov 2010943,82080.843.80$22,097
Oct 201003,79478.103.51$13,313
Sep 201003,63172.633.98$14,449
Aug 201003,51373.684.42$15,525
Jul 2010563,83972.554.74$22,246
Jun 201003,41370.364.91$16,759
May 201003,42071.124.24$14,484
Apr 201003,78981.694.12$15,621
Mar 201003,73778.394.39$16,400
Feb 201003,14073.585.44$17,089
Jan 201003,88274.365.96$23,153
Dec 200903,78271.445.48$20,740
Nov 200903,64174.593.75$13,659
Oct 200904,64172.544.11$19,076
Sep 200904,00165.543.06$12,262
Aug 200904,21667.423.22$13,569
Jul 200904,40361.133.46$15,254
Jun 200904,36866.163.90$17,013
May 2009504,03654.743.93$18,581
Apr 2009544,13846.773.59$17,371
Mar 200904,76142.144.06$19,325
Feb 200904,52132.814.63$20,946
Jan 2009754,61835.865.37$27,493
Dec 200804,64437.105.98$27,758
Nov 2008736,07655.496.86$45,734
Oct 2008734,82575.246.92$38,891
Sep 2008775,071101.767.88$47,780
Aug 200805,358114.228.48$45,452
Jul 200805,929131.0811.39$67,528
Jun 200806,319131.3313.03$82,353
May 2008716,668123.1711.57$85,922
Apr 200805,819110.3110.45$60,837
Mar 2008696,721101.909.66$71,983
Feb 200806,57192.538.77$57,631
Jan 200806,86890.388.21$56,357
Dec 2007837,56188.337.30$62,542
Nov 200707,18491.677.29$52,384
Oct 20071867,19482.856.92$65,207
Sep 200707,27675.846.24$45,433
Aug 2007987,62369.066.39$55,463
Jul 200708,21670.906.39$52,483
Jun 2007918,31362.007.55$68,392
May 200708,65358.747.85$67,894
Apr 2007848,15659.617.81$68,666
Mar 2007928,99256.927.30$70,896
Feb 2007939,64355.108.22$84,351
Jan 20078811,99850.306.73$85,135
Dec 20069213,62456.656.92$99,469
Nov 200615715,56354.207.62$127,060
Oct 200618019,53154.906.01$127,338
Sep 200626516,12460.085.04$97,141
Aug 2006024,25868.717.34$178,052
Jul 2006014,92969.376.34$94,691

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  142 Mcf  × $  3.05 =       $433

────────────────────────────────────────────────────
Month total                                     $433

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/224182 is the state's own key, not one this site invented.