LANDON

Operated by SABINE ENERGY INC. (P-5 103925) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224710District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.1 M
Aug 2006 – May 2026
Value, last 12 filed months
$94 k
at the published price for each month
Months reported
238
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-05-07174702
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition960 bbl$70,399
GasProduction1,185,553 Mcf$6,027,217
Total$6,097,616

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0913, -94.7338. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.09131, -94.73376 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,988 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,988 ft.

Completions filed
Aug 2006
1 of 1 wells

1 well

42-401339161111,988 ftAug 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (238)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

238 months

May 202602,434106.413.05$7,414
Apr 202602,49298.932.87$7,151
Mar 202602,05789.753.15$6,478
Feb 202602,03463.503.75$7,628
Jan 202602,04859.138.00$16,380
Dec 202501,90056.664.41$8,385
Nov 202502,32558.593.93$9,129
Oct 202501,78059.383.30$5,883
Sep 202502,12562.743.08$6,538
Aug 202501,95563.933.01$5,894
Jul 202502,21766.743.32$7,350
Jun 202501,83066.483.13$5,726
May 202501,95560.553.23$6,319
Apr 202501,96862.363.54$6,973
Mar 202501,92567.704.27$8,217
Feb 202501,80270.884.34$7,822
Jan 202501,36474.324.28$5,836
Dec 202401,89568.993.12$5,915
Nov 202402,08569.052.20$4,584
Oct 202402,32471.372.28$5,302
Sep 202401,84769.612.36$4,367
Aug 202402,07975.632.06$4,290
Jul 202402,12379.932.15$4,557
Jun 202401,18378.082.63$3,116
May 202401,58078.812.20$3,474
Apr 202401,59784.451.66$2,650
Mar 202401,39680.301.55$2,157
Feb 202401,40176.091.78$2,499
Jan 202401,54373.023.30$5,088
Dec 202301,57571.262.61$4,112
Nov 202301,57477.892.81$4,419
Oct 202301,44685.443.09$4,464
Sep 202301,32389.042.74$3,618
Aug 202301,79080.522.67$4,784
Jul 202301,90574.852.64$5,033
Jun 202301,70668.962.26$3,853
May 202301,80670.622.23$4,023
Apr 202301,89778.122.24$4,245
Mar 202302,03472.852.39$4,868
Feb 202301,89775.112.47$4,677
Jan 202301,63276.533.39$5,529
Dec 202201,85976.415.73$10,650
Nov 202202,47885.005.65$13,991
Oct 202201,99587.185.86$11,698
Sep 202202,28184.888.16$18,621
Aug 202202,56994.529.13$23,448
Jul 202202,653101.587.54$20,009
Jun 202202,533115.097.98$20,206
May 202203,080109.378.43$25,974
Apr 202202,440104.226.84$16,684
Mar 202202,753108.885.08$13,975
Feb 202202,49691.054.86$12,128
Jan 202202,66181.844.54$12,075
Dec 202102,33771.323.90$9,112
Nov 202102,27277.435.24$11,898
Oct 202102,57079.795.71$14,685
Sep 202102,22969.865.35$11,927
Aug 202102,60866.024.22$11,007
Jul 202102,38670.783.98$9,501
Jun 202102,54669.493.38$8,607
May 202102,65263.483.02$8,003
Apr 202102,49860.362.76$6,891
Mar 202102,79061.302.72$7,580
Feb 202102,36257.805.55$13,104
Jan 202103,21850.412.81$9,043
Dec 202002,33344.642.68$6,242
Nov 202002,53038.772.71$6,848
Oct 202002,18836.972.48$5,423
Sep 202002,15937.091.99$4,299
Aug 202002,30439.982.39$5,495
Jul 202002,03038.371.83$3,705
Jun 202002,32434.901.69$3,928
May 202001,83916.921.81$3,337
Apr 202002,52414.751.80$4,554
Mar 202002,79530.341.86$5,188
Feb 202002,33949.881.98$4,633
Jan 202002,81357.252.09$5,893
Dec 201902,02459.012.30$4,664
Nov 201902,47155.302.75$6,797
Oct 201902,44153.472.42$5,904
Sep 201902,73755.052.66$7,273
Aug 201902,90853.112.30$6,701
Jul 201903,01656.272.46$7,420
Jun 201902,95852.782.49$7,369
May 201903,29158.482.74$9,018
Apr 201902,79162.632.75$7,677
Mar 201903,19656.803.06$9,786
Feb 201902,52650.852.79$7,053
Jan 201902,50046.033.23$8,070
Dec 201803,59746.594.19$15,055
Nov 201802,60752.934.24$11,046
Oct 201802,87761.443.40$9,776
Sep 201802,33859.543.11$7,267
Aug 201802,37059.403.07$7,268
Jul 201802,83165.142.93$8,300
Jun 201802,84560.183.08$8,754
May 201803,38665.382.90$9,822
Apr 201802,90263.842.90$8,418
Mar 201802,91361.222.79$8,118
Feb 201802,90761.782.77$8,041
Jan 201802,92162.874.01$11,711
Dec 201703,15157.272.92$9,206
Nov 201703,42055.423.12$10,665
Oct 201703,50649.292.98$10,461
Sep 201703,08747.523.09$9,530
Aug 201703,31145.373.00$9,948
Jul 201703,62543.873.09$11,191
Jun 201703,42242.493.09$10,565
May 201703,65845.373.26$11,938
Apr 201703,38047.933.21$10,855
Mar 201703,48546.772.98$10,398
Feb 201703,20250.452.95$9,454
Jan 201703,46149.413.42$11,832
Dec 201603,40648.763.72$12,680
Nov 201603,23042.492.64$8,541
Oct 201603,37546.193.09$10,430
Sep 201603,41441.553.10$10,586
Aug 201603,75341.442.92$10,975
Jul 201603,70741.622.92$10,841
Jun 201603,60145.352.69$9,672
May 201603,87442.521.99$7,713
Apr 201603,81636.561.99$7,598
Mar 201604,04433.011.79$7,255
Feb 201603,55626.472.06$7,338
Jan 201603,90827.352.36$9,240
Dec 201504,24932.362.00$8,504
Nov 201502,48938.792.17$5,394
Oct 201503,84343.552.43$9,325
Sep 201503,75242.992.76$10,350
Aug 201503,84540.162.87$11,045
Jul 201504,13248.152.95$12,169
Jun 201503,22056.152.88$9,283
May 201503,82055.212.96$11,290
Apr 201503,87749.822.71$10,493
Mar 201504,03542.892.93$11,842
Feb 201503,63244.662.98$10,810
Jan 201504,05843.433.10$12,582
Dec 201404,13754.693.59$14,857
Nov 201404,08870.464.25$17,382
Oct 201404,16078.303.90$16,228
Sep 201404,01786.164.05$16,251
Aug 201404,08389.394.04$16,475
Jul 201404,04196.564.18$16,890
Jun 201404,02698.164.74$19,071
May 201404,00094.734.73$18,906
Apr 201404,06595.944.81$19,549
Mar 201404,14295.895.06$20,945
Feb 201403,76897.406.19$23,331
Jan 201404,14590.404.86$20,148
Dec 201304,15291.824.35$18,080
Nov 201304,12288.853.74$15,409
Oct 201304,31397.423.78$16,300
Sep 201303,851104.113.72$14,317
Aug 201304,644104.253.52$16,359
Jul 201304,757102.523.72$17,685
Jun 201304,54494.403.93$17,873
May 201304,75994.834.15$19,745
Apr 201304,65693.964.28$19,940
Mar 201304,64093.623.91$18,156
Feb 201304,02991.233.42$13,779
Jan 201304,54391.603.42$15,537
Dec 201204,64886.773.42$15,897
Nov 201204,37386.953.62$15,852
Oct 201204,63089.383.40$15,741
Sep 201204,87294.672.92$14,218
Aug 201205,18592.662.91$15,079
Jul 201205,24985.133.02$15,856
Jun 201205,12179.822.52$12,900
May 201205,05791.612.49$12,583
Apr 201255,171101.652.00$10,834
Mar 201255,621105.052.22$13,016
Feb 201265,341101.102.57$14,334
Jan 2012105,75798.092.73$16,721
Dec 201186,03296.873.24$20,317
Nov 201105,03595.723.31$16,672
Oct 201105,39284.983.65$19,673
Sep 2011115,32783.623.99$22,152
Aug 2011125,95583.404.15$25,710
Jul 2011115,48194.144.52$25,795
Jun 201155,32992.904.64$25,190
May 201155,49098.134.40$24,673
Apr 201185,737105.964.33$25,708
Mar 201165,67796.364.06$23,612
Feb 201195,36185.644.18$23,180
Jan 201186,04086.504.59$28,408
Dec 201036,13985.734.35$26,948
Nov 201066,09780.843.80$23,625
Oct 201066,37478.103.51$22,834
Sep 201076,25872.633.98$25,412
Aug 201076,53973.684.42$29,414
Jul 201076,63572.554.74$31,934
Jun 201076,57470.364.91$32,773
May 201056,91871.124.24$29,655
Apr 2010236,89781.694.12$30,313
Mar 2010247,25878.394.39$33,734
Feb 2010236,58273.585.44$37,514
Jan 2010177,32774.365.96$44,963
Dec 2009107,46871.445.48$41,667
Nov 200967,13974.593.75$27,230
Oct 2009107,90372.544.11$33,209
Sep 200987,60465.543.06$23,829
Aug 200958,55267.423.22$27,862
Jul 200987,89461.133.46$27,838
Jun 200987,92866.163.90$31,409
May 2009118,51554.743.93$34,030
Apr 2009138,12046.773.59$29,739
Mar 200979,32042.144.06$38,125
Feb 200918,49332.814.63$39,381
Jan 2009129,99535.865.37$54,113
Dec 2008119,79737.105.98$58,966
Nov 2008910,40055.496.86$71,847
Oct 20081411,03375.246.92$77,424
Sep 20081910,592101.767.88$85,368
Aug 20082011,127114.228.48$96,675
Jul 20081210,430131.0811.39$120,365
Jun 20081510,935131.3313.03$144,482
May 20081911,800123.1711.57$138,917
Apr 20081611,963110.3110.45$126,836
Mar 20081712,998101.909.66$127,346
Feb 20081212,80792.538.77$113,435
Jan 20081214,26690.388.21$118,148
Dec 20071515,29288.337.30$112,987
Nov 20071216,33191.677.29$120,181
Oct 2007816,53282.856.92$115,097
Sep 20071316,45375.846.24$103,721
Aug 20071218,20469.066.39$117,115
Jul 20071219,90170.906.39$127,977
Jun 20071317,43862.007.55$132,436
May 20073019,19758.747.85$152,387
Apr 20072920,57659.617.81$162,328
Mar 20071118,42956.927.30$135,194
Feb 20073017,39855.108.22$144,595
Jan 20076723,63050.306.73$162,326
Dec 200618937,64656.656.92$271,158
Nov 2006079554.207.62$6,056
Oct 200601,52454.906.01$9,165
Sep 2006010,20860.085.04$51,420
Aug 200608,76968.717.34$64,364

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                2,434 Mcf  × $  3.05 =     $7,414

────────────────────────────────────────────────────
Month total                                   $7,414

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/224710 is the state's own key, not one this site invented.