WHITE, FRANK GAS UNIT

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the GLENWOOD (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 225886District 06Field 354153002 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.1 M
Oct 2006 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
236
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 351 leases and 351 wells, and the rule below applies to all of them.

Discovered
1980-12-20
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2017-12-05.

The Commission's schedule remark for this field reads: BE FILED IF THE OPERATOR CHOOSES. THIS IS A UFT FIELD.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-02-27180975
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,805 bbl$268,984
GasProduction907,658 Mcf$4,828,354
Total$5,097,338

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5622, -94.9030. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.56216, -94.90298 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,079 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,079 ft.

Completions filed
Oct 2006
1 of 1 wells

1 well

42-45931323211,079 ftOct 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (236)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

236 months

May 20260185106.413.05$563
Apr 2026017198.932.87$491
Mar 202609289.753.15$290
Feb 2026026763.503.75$1,001
Jan 2026029159.138.00$2,327
Dec 2025019956.664.41$878
Nov 2025016758.593.93$656
Oct 2025018959.383.30$625
Sep 2025018962.743.08$582
Aug 2025022263.933.01$669
Jul 2025021866.743.32$723
Jun 2025045866.483.13$1,433
May 2025020760.553.23$669
Apr 2025017562.363.54$620
Mar 2025020267.704.27$862
Feb 2025019070.884.34$825
Jan 2025019274.324.28$822
Dec 2024021168.993.12$659
Nov 2024021169.052.20$464
Oct 2024020771.372.28$472
Sep 2024023669.612.36$558
Aug 2024023275.632.06$479
Jul 2024023779.932.15$509
Jun 2024023178.082.63$608
May 2024047978.812.20$1,053
Apr 2024031284.451.66$518
Mar 2024024380.301.55$375
Feb 2024223276.091.78$566
Jan 2024313273.023.30$654
Dec 2023324271.262.61$846
Nov 2023324477.892.81$919
Oct 2023325185.443.09$1,031
Sep 2023324589.042.74$937
Aug 2023320680.522.67$792
Jul 2023322474.852.64$816
Jun 2023428968.962.26$929
May 2023427170.622.23$886
Apr 2023429478.122.24$970
Mar 2023531372.852.39$1,113
Feb 2023523375.112.47$950
Jan 2023562776.533.39$2,507
Dec 2022628176.415.73$2,068
Nov 20225085.005.65$425
Oct 2022734387.185.86$2,622
Sep 2022536184.888.16$3,371
Aug 2022741194.529.13$4,413
Jul 20224413101.587.54$3,521
Jun 20225383115.097.98$3,631
May 20225525109.378.43$4,974
Apr 20227744104.226.84$5,817
Mar 202271,149108.885.08$6,595
Feb 2022596391.054.86$5,134
Jan 202271,43181.844.54$7,066
Dec 202161,52771.323.90$6,382
Nov 202161,30577.435.24$7,299
Oct 202151,67579.795.71$9,970
Sep 202151,63869.865.35$9,114
Aug 202162,56166.024.22$11,205
Jul 2021960470.783.98$3,042
Jun 2021760369.493.38$2,525
May 20211081963.483.02$3,106
Apr 20211097960.362.76$3,304
Mar 2021111,06861.302.72$3,576
Feb 20212392757.805.55$6,472
Jan 2021291,20950.412.81$4,860
Dec 2020251,04044.642.68$3,898
Nov 20201998438.772.71$3,400
Oct 2020281,11836.972.48$3,806
Sep 2020221,21037.091.99$3,225
Aug 2020281,62439.982.39$4,993
Jul 2020201,75438.371.83$3,969
Jun 2020272,59934.901.69$5,335
May 2020282,78216.921.81$5,522
Apr 2020272,76714.751.80$5,391
Mar 2020302,08730.341.86$4,784
Feb 2020322,81849.881.98$7,178
Jan 2020352,00057.252.09$6,193
Dec 201992,84259.012.30$7,080
Nov 20191199755.302.75$3,351
Oct 20191187453.472.42$2,702
Sep 20191083155.052.66$2,759
Aug 2019171,06053.112.30$3,345
Jul 2019172,12056.272.46$6,172
Jun 2019161,54152.782.49$4,683
May 2019241,62458.482.74$5,854
Apr 2019202,15462.632.75$7,178
Mar 2019252,22256.803.06$8,224
Feb 2019221,71650.852.79$5,910
Jan 2019281,99946.033.23$7,742
Dec 2018272,29246.594.19$10,851
Nov 2018261,90252.934.24$9,435
Oct 2018262,54061.443.40$10,229
Sep 2018252,83359.543.11$10,293
Aug 2018252,73459.403.07$9,869
Jul 2018232,40865.142.93$8,558
Jun 2018212,51460.183.08$8,999
May 2018242,71565.382.90$9,445
Apr 2018232,66363.842.90$9,193
Mar 2018272,15061.222.79$7,645
Feb 2018291,68761.782.77$6,458
Jan 2018212,36362.874.01$10,794
Dec 2017261,87657.272.92$6,970
Nov 2017292,34555.423.12$8,920
Oct 2017232,53549.292.98$8,697
Sep 2017242,75047.523.09$9,631
Aug 2017232,89345.373.00$9,735
Jul 2017252,64543.873.09$9,263
Jun 2017272,35042.493.09$8,402
May 2017322,85045.373.26$10,753
Apr 2017312,64047.933.21$9,964
Mar 2017192,94046.772.98$9,661
Feb 2017192,20850.452.95$7,478
Jan 2017291,86449.413.42$7,806
Dec 2016332,79648.763.72$12,018
Nov 2016332,78342.492.64$8,761
Oct 2016393,26346.193.09$11,885
Sep 2016253,16341.553.10$10,846
Aug 2016272,94841.442.92$9,740
Jul 2016323,06741.622.92$10,301
Jun 2016323,03145.352.69$9,592
May 2016343,51642.521.99$8,446
Apr 2016323,30836.561.99$7,756
Mar 2016342,73333.011.79$6,025
Feb 2016353,04226.472.06$7,204
Jan 2016393,32827.352.36$8,935
Dec 2015353,30832.362.00$7,753
Nov 2015283,12038.792.17$7,848
Oct 2015373,42043.552.43$9,910
Sep 2015323,55542.992.76$11,182
Aug 2015222,68740.162.87$8,602
Jul 2015222,07948.152.95$7,182
Jun 2015222,11856.152.88$7,341
May 201501,99255.212.96$5,887
Apr 201502,72949.822.71$7,386
Mar 20150642.892.93$18
Feb 201501,41044.662.98$4,196
Jan 201501,60543.433.10$4,977
Dec 201403,23254.693.59$11,607
Nov 201403,07570.464.25$13,074
Oct 201403,24778.303.90$12,666
Sep 201402,92586.164.05$11,833
Aug 201402,57989.394.04$10,407
Jul 201403,15796.564.18$13,195
Jun 201403,29498.164.74$15,603
May 201403,38794.734.73$16,009
Apr 201403,66895.944.81$17,640
Mar 201403,63295.895.06$18,366
Feb 201402,81397.406.19$17,418
Jan 201403,84590.404.86$18,689
Dec 201303,74191.824.35$16,290
Nov 201303,50888.853.74$13,114
Oct 201303,69697.423.78$13,969
Sep 201303,500104.113.72$13,012
Aug 201303,688104.253.52$12,991
Jul 201303,666102.523.72$13,629
Jun 201303,71494.403.93$14,609
May 201303,85994.834.15$16,011
Apr 201303,85393.964.28$16,501
Mar 201303,81893.623.91$14,939
Feb 201303,73591.233.42$12,773
Jan 201303,99891.603.42$13,673
Dec 201204,08286.773.42$13,961
Nov 201204,14086.953.62$15,007
Oct 201204,38189.383.40$14,894
Sep 201204,34994.672.92$12,692
Aug 201204,59392.662.91$13,357
Jul 201204,16185.133.02$12,570
Jun 201204,57879.822.52$11,532
May 201204,82991.612.49$12,016
Apr 201205,314101.652.00$10,611
Mar 201203,565105.052.22$7,922
Feb 201203,072101.102.57$7,896
Jan 201203,91798.092.73$10,709
Dec 2011103,10996.873.24$11,041
Nov 2011284,15295.723.31$16,429
Oct 2011213,46284.983.65$14,416
Sep 2011214,35083.623.99$19,094
Aug 2011264,52983.404.15$20,961
Jul 2011214,68794.144.52$23,149
Jun 2011254,98692.904.64$25,457
May 2011264,56398.134.40$22,651
Apr 2011274,551105.964.33$22,582
Mar 2011264,77796.364.06$21,887
Feb 2011252,09785.644.18$10,906
Jan 2011265,18386.504.59$26,033
Dec 2010244,28585.734.35$20,688
Nov 2010163,23480.843.80$13,568
Oct 2010015,10878.103.51$53,012
Sep 201005,47672.633.98$21,792
Aug 201005,77773.684.42$25,531
Jul 201004,26872.554.74$20,215
Jun 201015,22770.364.91$25,737
May 2010165,15071.124.24$22,949
Apr 2010355,18781.694.12$24,244
Mar 2010415,89978.394.39$29,103
Feb 2010305,56573.585.44$32,494
Jan 2010366,00774.365.96$38,503
Dec 2009326,01271.445.48$35,254
Nov 2009366,45374.593.75$26,894
Oct 2009516,87072.544.11$31,937
Sep 2009426,53165.543.06$22,769
Aug 2009467,38467.423.22$26,867
Jul 2009487,78261.133.46$29,895
Jun 2009367,94866.163.90$33,339
May 2009167,91254.743.93$31,936
Apr 2009186,92446.773.59$25,682
Mar 2009177,95342.144.06$32,998
Feb 2009146,54032.814.63$30,759
Jan 2009175,23235.865.37$28,711
Dec 2008138,33937.105.98$50,326
Nov 2008518,84055.496.86$63,476
Oct 20081387,19075.246.92$60,152
Sep 20081228,896101.767.88$82,489
Aug 20081319,957114.228.48$99,428
Jul 20081649,332131.0811.39$127,783
Jun 20081449,838131.3313.03$147,127
May 200814711,295123.1711.57$148,838
Apr 2008710,898110.3110.45$114,709
Mar 20082110,332101.909.66$101,989
Feb 20081710,72592.538.77$95,637
Jan 20082111,05990.388.21$92,645
Dec 2007011,25488.337.30$82,176
Nov 2007011,80091.677.29$86,042
Oct 2007013,91582.856.92$96,319
Sep 2007017,44475.846.24$108,923
Aug 200703,47669.066.39$22,204
Jul 2007014,19570.906.39$90,677
Jun 2007012,97862.007.55$97,964
May 2007014,21658.747.85$111,543
Apr 2007015,86759.617.81$123,845
Mar 2007020,64256.927.30$150,727
Feb 2007020,16955.108.22$165,709
Jan 2007026,91950.306.73$181,080
Dec 2006030,33556.656.92$209,871
Nov 2006029,54854.207.62$225,081
Oct 2006010,01654.906.01$60,234

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  185 Mcf  × $  3.05 =       $563

────────────────────────────────────────────────────
Month total                                     $563

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/225886 is the state's own key, not one this site invented.