Operated by SHERIDAN PRODUCTION CO III, LLC (P-5 775851) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 226786District 06Field 160321742 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.0 M
Sep 2006 – Feb 2023
Value, last 12 filed months
$915
at the published price for each month
Months reported
198
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-06-25172746
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11,701 bbl$866,115
GasProduction351,236 Mcf$2,093,998
Total$2,960,113

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2626, -94.2276. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.26258, -94.22759 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,860 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,860 ft.

Completions filed
Feb 2023
1 of 1 wells

1 well

42-36536022169,860 ftFeb 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (198)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

198 months

Feb 20230075.112.47$0
Jan 202305476.533.39$183
Dec 202202276.415.73$126
Nov 202201785.005.65$96
Oct 202202387.185.86$135
Sep 202204684.888.16$376
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 201704950.452.95$145
Jan 201708849.413.42$301
Dec 201606848.763.72$253
Nov 201607742.492.64$204
Oct 201606446.193.09$198
Sep 201605341.553.10$164
Aug 201606541.442.92$190
Jul 201606141.622.92$178
Jun 201607745.352.69$207
May 201609142.521.99$181
Apr 201608736.561.99$173
Mar 2016010133.011.79$181
Feb 201609326.472.06$192
Jan 2016010027.352.36$236
Dec 2015010432.362.00$208
Nov 2015011038.792.17$238
Oct 2015011343.552.43$274
Sep 2015012042.992.76$331
Aug 201509740.162.87$279
Jul 2015012648.152.95$371
Jun 2015013056.152.88$375
May 2015013655.212.96$402
Apr 2015015149.822.71$409
Mar 2015010442.892.93$305
Feb 2015012844.662.98$381
Jan 2015015143.433.10$468
Dec 2014015354.693.59$549
Nov 2014015770.464.25$668
Oct 2014017778.303.90$690
Sep 2014021286.164.05$858
Aug 2014021789.394.04$876
Jul 2014675496.564.18$3,731
Jun 201407098.164.74$332
May 201407094.734.73$331
Apr 2014121,43795.944.81$8,062
Mar 2014171,67295.895.06$10,085
Feb 2014101,12097.406.19$7,909
Jan 2014121,07090.404.86$6,286
Dec 2013121,03191.824.35$5,591
Nov 2013151,64988.853.74$7,497
Oct 2013221,84197.423.78$9,101
Sep 2013181,754104.113.72$8,395
Aug 2013141,714104.253.52$7,497
Jul 2013181,715102.523.72$8,221
Jun 2013121,31794.403.93$6,313
May 2013151,22594.834.15$6,505
Apr 2013251,36693.964.28$8,199
Mar 2013281,52993.623.91$8,604
Feb 2013201,25491.233.42$6,113
Jan 2013301,57191.603.42$8,121
Dec 2012241,62286.773.42$7,630
Nov 2012371,56086.953.62$8,872
Oct 2012581,88789.383.40$11,599
Sep 20121931,88694.672.92$23,775
Aug 20121992,11092.662.91$24,576
Jul 20122142,36485.133.02$25,359
Jun 20122152,48979.822.52$23,431
May 20123152,75491.612.49$35,710
Apr 20121452,567101.652.00$19,865
Mar 2012932,248105.052.22$14,765
Feb 2012692,077101.102.57$12,314
Jan 2012802,06098.092.73$13,479
Dec 2011882,52496.873.24$16,702
Nov 2011851,79395.723.31$14,073
Oct 2011992,37784.983.65$17,086
Sep 201142,44883.623.99$10,092
Aug 201152,56883.404.15$11,072
Jul 201131,71094.144.52$8,007
Jun 201152,36692.904.64$11,442
May 201152,55798.134.40$11,754
Apr 2011442,557105.964.33$15,742
Mar 2011642,34496.364.06$15,677
Feb 2011391,83785.644.18$11,019
Jan 2011562,39186.504.59$15,816
Dec 2010502,67785.734.35$15,925
Nov 2010782,35680.843.80$15,247
Oct 2010662,76578.103.51$14,857
Sep 2010992,55372.633.98$17,350
Aug 20101402,52273.684.42$21,461
Jul 20101502,90272.554.74$24,628
Jun 20101272,40270.364.91$20,731
May 20101462,89971.124.24$22,661
Apr 20101593,10981.694.12$25,806
Mar 20101293,21578.394.39$24,222
Feb 201003,00273.585.44$16,338
Jan 201003,02074.365.96$18,012
Dec 20091353,52471.445.48$28,969
Nov 200903,57974.593.75$13,427
Oct 20092453,21572.544.11$30,987
Sep 200903,86465.543.06$11,842
Aug 20091643,52567.423.22$22,402
Jul 200904,12761.133.46$14,298
Jun 20091754,46866.163.90$28,981
May 200904,48754.743.93$17,615
Apr 20091503,91346.773.59$21,053
Mar 200984,21342.144.06$17,438
Feb 200923,24532.814.63$15,100
Jan 200945,76535.865.37$31,107
Dec 200835,58637.105.98$33,500
Nov 200805,22155.496.86$35,818
Oct 2008755,84775.246.92$46,116
Sep 20081176,328101.767.88$61,752
Aug 2008904,038114.228.48$44,534
Jul 2008955,007131.0811.39$69,479
Jun 20081165,567131.3313.03$87,787
May 20081245,509123.1711.57$79,036
Apr 20081245,473110.3110.45$70,898
Mar 20081375,500101.909.66$67,113
Feb 20082666,00792.538.77$77,298
Jan 20081264,92090.388.21$51,760
Dec 20071865,61988.337.30$57,459
Nov 20071334,87091.677.29$47,703
Oct 20071536,00682.856.92$54,249
Sep 2007795,35475.846.24$39,423
Aug 20071677,36769.066.39$58,593
Jul 20072928,38170.906.39$74,240
Jun 20073398,41462.007.55$84,531
May 20075039,68958.747.85$105,569
Apr 20074979,60559.617.81$104,595
Mar 200765111,18156.927.30$118,698
Feb 20073487,38755.108.22$79,866
Jan 20073665,90050.306.73$58,098
Dec 20062966,39556.656.92$61,012
Nov 20064298,65854.207.62$89,204
Oct 20066617,80954.906.01$83,251
Sep 200687611,37460.085.04$109,923

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 76.53 =         $0
Gas                   54 Mcf  × $  3.39 =       $183

────────────────────────────────────────────────────
Month total                                     $183

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/226786 is the state's own key, not one this site invented.