HAYTER, SAM B. EST.

Operated by TEXIAN OPERATING COMPANY, LLC (P-5 848681) in the DOUGLASS, W. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227078District 06Field 258644712 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.9 M
Mar 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 423 leases and 423 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: AND NACOGDOCHES, E. (JAMES LIME).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-11-05177885
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition369 bbl$29,320
GasProduction618,586 Mcf$3,884,271
Total$3,913,591

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6570, -94.7708. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.65699, -94.77080 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,490 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,490 ft.

1 well

42-347324355410,490 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20181065.142.93$65
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 2017012145.373.00$364
Jul 201709543.873.09$293
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20164045.352.69$181
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 201609927.352.36$234
Dec 2015030532.362.00$610
Nov 2015031938.792.17$691
Oct 2015038443.552.43$932
Sep 2015036542.992.76$1,007
Aug 2015052940.162.87$1,520
Jul 2015052148.152.95$1,534
Jun 2015053356.152.88$1,537
May 2015062655.212.96$1,850
Apr 2015766649.822.71$2,151
Mar 2015073742.892.93$2,163
Feb 2015068944.662.98$2,051
Jan 2015686343.433.10$2,936
Dec 2014094554.693.59$3,394
Nov 201401,06970.464.25$4,545
Oct 201401,20778.303.90$4,708
Sep 201401,31886.164.05$5,332
Aug 201401,96889.394.04$7,941
Jul 201402,08196.564.18$8,698
Jun 2014181,63198.164.74$9,493
May 2014121,83694.734.73$9,815
Apr 201401,62095.944.81$7,791
Mar 201402,07895.895.06$10,508
Feb 2014131,88497.406.19$12,932
Jan 201402,22990.404.86$10,835
Dec 201302,31091.824.35$10,059
Nov 201302,08888.853.74$7,806
Oct 201302,24397.423.78$8,477
Sep 201302,258104.113.72$8,395
Aug 201302,284104.253.52$8,046
Jul 201302,360102.523.72$8,774
Jun 201302,36294.403.93$9,291
May 201302,40394.834.15$9,970
Apr 201302,39493.964.28$10,253
Mar 201302,32393.623.91$9,090
Feb 201302,22591.233.42$7,609
Jan 201302,50091.603.42$8,550
Dec 2012152,62686.773.42$10,283
Nov 201202,58286.953.62$9,360
Oct 201202,69489.383.40$9,159
Sep 201282,57594.672.92$8,272
Aug 201202,75692.662.91$8,015
Jul 201202,82685.133.02$8,537
Jun 201202,72879.822.52$6,872
May 201202,90991.612.49$7,239
Apr 201202,584101.652.00$5,160
Mar 2012102,820105.052.22$7,317
Feb 201202,738101.102.57$7,037
Jan 201202,84398.092.73$7,773
Dec 201103,01896.873.24$9,778
Nov 201103,06395.723.31$10,142
Oct 201103,26584.983.65$11,912
Sep 2011102,98383.623.99$12,726
Aug 201103,20583.404.15$13,299
Jul 201103,12894.144.52$14,130
Jun 201103,09392.904.64$14,351
May 201103,22098.134.40$14,184
Apr 201103,204105.964.33$13,884
Mar 2011203,41896.364.06$15,795
Feb 201102,96785.644.18$12,402
Jan 201103,38186.504.59$15,515
Dec 201003,82685.734.35$16,634
Nov 201053,41380.843.80$13,358
Oct 201003,85578.103.51$13,527
Sep 201003,80572.633.98$15,142
Aug 201003,96673.684.42$17,527
Jul 201003,75772.554.74$17,795
Jun 201014,04170.364.91$19,913
May 201004,36271.124.24$18,474
Apr 201004,35681.694.12$17,958
Mar 201004,70078.394.39$20,627
Feb 201004,45673.585.44$24,251
Jan 201004,63974.365.96$27,667
Dec 200954,47171.445.48$24,875
Nov 200904,62474.593.75$17,347
Oct 200995,35972.544.11$22,680
Sep 200904,76165.543.06$14,591
Aug 200905,15367.423.22$16,585
Jul 200904,86661.133.46$16,858
Jun 200905,61966.163.90$21,886
May 2009236,25654.743.93$25,819
Apr 200905,69346.773.59$20,424
Mar 200915,77342.144.06$23,475
Feb 200906,36532.814.63$29,489
Jan 200916,51035.865.37$35,001
Dec 2008267,77537.105.98$47,437
Nov 200808,48855.496.86$58,231
Oct 200808,17675.246.92$56,594
Sep 200816,281101.767.88$49,578
Aug 2008147,133114.228.48$62,108
Jul 200827,457131.0811.39$85,193
Jun 2008167,450131.3313.03$99,194
May 200808,315123.1711.57$96,240
Apr 200818,768110.3110.45$91,779
Mar 2008179,738101.909.66$95,841
Feb 200819,67792.538.77$84,965
Jan 20081410,76390.388.21$89,584
Dec 20071512,04588.337.30$89,277
Nov 2007313,25291.677.29$96,905
Oct 2007915,26682.856.92$106,417
Sep 2007116,48275.846.24$102,992
Aug 20071220,65269.066.39$132,752
Jul 2007620,96170.906.39$134,323
Jun 20071122,70462.007.55$172,062
May 20071331,76158.747.85$249,969
Apr 20073248,50859.617.81$380,522
Mar 2007677,21456.927.30$564,156

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2018 — as filed, then multipliedworked
Condensate             1 bbl  × $ 65.14 =        $65
Gas                    0 Mcf  × $  2.93 =         $0

────────────────────────────────────────────────────
Month total                                      $65

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/227078 is the state's own key, not one this site invented.