HAYTER, SAM B. EST.

Operated by WALLACE OPERATING COMPANY LLC (P-5 102713) in the DOUGLASS, W. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227283District 06Field 258644712 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.0 M
Mar 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
231
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 423 leases and 423 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: AND NACOGDOCHES, E. (JAMES LIME).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-11-05177884
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition326 bbl$27,316
GasProduction348,139 Mcf$1,939,070
Total$1,966,386

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6536, -94.7820. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.65362, -94.78202 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,393 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,393 ft.

1 well

42-347324415710,393 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (231)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

231 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240680.301.55$9
Feb 20240876.091.78$14
Jan 20240373.023.30$10
Dec 202303971.262.61$102
Nov 202305677.892.81$157
Oct 202305385.443.09$164
Sep 2023015289.042.74$416
Aug 2023026480.522.67$706
Jul 2023028674.852.64$756
Jun 2023025768.962.26$580
May 2023022670.622.23$503
Apr 2023025378.122.24$566
Mar 2023022272.852.39$531
Feb 2023019475.112.47$478
Jan 2023024076.533.39$813
Dec 2022018476.415.73$1,054
Nov 2022022085.005.65$1,242
Oct 2022023387.185.86$1,366
Sep 2022024584.888.16$2,000
Aug 2022021794.529.13$1,981
Jul 20220258101.587.54$1,946
Jun 20220290115.097.98$2,313
May 20220283109.378.43$2,387
Apr 20220255104.226.84$1,744
Mar 20220246108.885.08$1,249
Feb 2022018091.054.86$875
Jan 2022022481.844.54$1,016
Dec 2021033171.323.90$1,291
Nov 2021029477.435.24$1,540
Oct 2021033679.795.71$1,920
Sep 2021035269.865.35$1,884
Aug 2021035066.024.22$1,477
Jul 2021034770.783.98$1,382
Jun 2021032569.493.38$1,099
May 2021024863.483.02$748
Apr 202109460.362.76$259
Mar 2021028561.302.72$774
Feb 2021020557.805.55$1,137
Jan 202103550.412.81$98
Dec 2020020544.642.68$548
Nov 2020022938.772.71$620
Oct 2020024336.972.48$602
Sep 2020030837.091.99$613
Aug 2020032939.982.39$785
Jul 2020019638.371.83$358
Jun 2020022534.901.69$380
May 2020038616.921.81$700
Apr 2020038914.751.80$702
Mar 2020040230.341.86$746
Feb 2020025249.881.98$499
Jan 2020037857.252.09$792
Dec 2019037459.012.30$862
Nov 2019031855.302.75$875
Oct 2019029653.472.42$716
Sep 2019044755.052.66$1,188
Aug 2019065853.112.30$1,516
Jul 2019035556.272.46$873
Jun 2019249652.782.49$1,341
May 2019045758.482.74$1,252
Apr 2019057662.632.75$1,584
Mar 2019069656.803.06$2,131
Feb 2019856850.852.79$1,993
Jan 2019068746.033.23$2,218
Dec 201801,14946.594.19$4,809
Nov 201801,33152.934.24$5,640
Oct 201801,70261.443.40$5,784
Sep 201801,56359.543.11$4,858
Aug 201821,93059.403.07$6,037
Jul 201852,24865.142.93$6,917
Jun 201822,64160.183.08$8,247
May 201802,77665.382.90$8,053
Apr 201801,13263.842.90$3,284
Mar 2018080861.222.79$2,252
Feb 2018077761.782.77$2,149
Jan 2018074862.874.01$2,999
Dec 2017078957.272.92$2,305
Nov 201701,26055.423.12$3,929
Oct 201703,20149.292.98$9,551
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 201601,36348.763.72$5,074
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20165045.352.69$227
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 2016042627.352.36$1,007
Dec 201501,28232.362.00$2,566
Nov 201501,24538.792.17$2,698
Oct 201501,32243.552.43$3,208
Sep 201501,13342.992.76$3,125
Aug 201501,14240.162.87$3,280
Jul 201501,16948.152.95$3,443
Jun 201501,12756.152.88$3,249
May 2015096355.212.96$2,846
Apr 2015773949.822.71$2,349
Mar 2015074842.892.93$2,195
Feb 2015079744.662.98$2,372
Jan 2015690643.433.10$3,070
Dec 2014076754.693.59$2,755
Nov 2014089070.464.25$3,784
Oct 201401,01778.303.90$3,967
Sep 2014099786.164.05$4,033
Aug 201401,00389.394.04$4,047
Jul 2014093796.564.18$3,916
Jun 20141888198.164.74$5,940
May 20141392094.734.73$5,580
Apr 201401,34595.944.81$6,468
Mar 201402,21695.895.06$11,206
Feb 2014131,91797.406.19$13,136
Jan 201402,17390.404.86$10,562
Dec 201302,11491.824.35$9,205
Nov 201302,01788.853.74$7,540
Oct 201302,19897.423.78$8,307
Sep 201302,089104.113.72$7,766
Aug 201302,037104.253.52$7,176
Jul 201301,405102.523.72$5,223
Jun 201301,29194.403.93$5,078
May 201301,38694.834.15$5,751
Apr 201301,26593.964.28$5,417
Mar 201301,55893.623.91$6,096
Feb 201301,40791.233.42$4,812
Jan 201301,62091.603.42$5,540
Dec 2012151,58286.773.42$6,712
Nov 201201,36286.953.62$4,937
Oct 201201,24789.383.40$4,239
Sep 201281,23094.672.92$4,347
Aug 201201,34192.662.91$3,900
Jul 201201,34485.133.02$4,060
Jun 201201,24679.822.52$3,139
May 201201,26891.612.49$3,155
Apr 201201,326101.652.00$2,648
Mar 2012141,484105.052.22$4,768
Feb 201201,431101.102.57$3,678
Jan 201201,52798.092.73$4,175
Dec 201101,54096.873.24$4,989
Nov 201101,31995.723.31$4,368
Oct 201101,60484.983.65$5,852
Sep 2011141,58483.623.99$7,484
Aug 201101,82783.404.15$7,581
Jul 201101,99094.144.52$8,989
Jun 201101,97992.904.64$9,182
May 201102,15098.134.40$9,470
Apr 201102,009105.964.33$8,706
Mar 2011132,28396.364.06$10,516
Feb 201101,87885.644.18$7,850
Jan 201102,17786.504.59$9,990
Dec 201002,22185.734.35$9,656
Nov 2010342,06980.843.80$10,601
Oct 201002,23378.103.51$7,835
Sep 201002,46472.633.98$9,805
Aug 201002,18373.684.42$9,647
Jul 201001,98072.554.74$9,378
Jun 201012,50570.364.91$12,371
May 201002,63771.124.24$11,168
Apr 201002,71781.694.12$11,201
Mar 201002,73978.394.39$12,021
Feb 201002,59873.585.44$14,139
Jan 201002,58774.365.96$15,429
Dec 200942,58671.445.48$14,467
Nov 200902,87474.593.75$10,782
Oct 200973,15472.544.11$13,472
Sep 200903,13265.543.06$9,599
Aug 200903,49867.423.22$11,258
Jul 200902,76261.133.46$9,569
Jun 200903,27366.163.90$12,748
May 200943,50054.743.93$13,959
Apr 200903,44546.773.59$12,359
Mar 200903,54742.144.06$14,397
Feb 200903,30732.814.63$15,321
Jan 200913,32635.865.37$17,900
Dec 200842,59637.105.98$15,665
Nov 200803,34655.496.86$22,955
Oct 200803,14675.246.92$21,777
Sep 200813,093101.767.88$24,466
Aug 2008163,495114.228.48$31,476
Jul 200823,970131.0811.39$45,478
Jun 200893,599131.3313.03$48,086
May 200804,953123.1711.57$57,327
Apr 200815,290110.3110.45$55,417
Mar 2008165,899101.909.66$58,639
Feb 200805,75692.538.77$50,483
Jan 2008185,08790.388.21$43,369
Dec 200795,88988.337.30$43,796
Nov 200726,29591.677.29$46,085
Oct 200796,98182.856.92$49,068
Sep 200717,19875.846.24$45,021
Aug 200788,92869.066.39$57,584
Jul 2007510,09170.906.39$64,815
Jun 200756,06662.007.55$46,099
May 2007910,91958.747.85$86,202
Apr 20071116,34959.617.81$128,263
Mar 2007421,49556.927.30$157,184

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 80.30 =         $0
Gas                    6 Mcf  × $  1.55 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/227283 is the state's own key, not one this site invented.