MCCLENDON GU

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the CARTHAGE, NORTH (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228007District 06Field 160342502 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.2 M
Mar 2007 – Jan 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 568 leases and 570 wells, and the rule below applies to all of them.

Discovered
1981-11-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-12-14.

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-07179381
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11,251 bbl$893,765
GasProduction420,225 Mcf$2,320,217
Total$3,213,982

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3674, -94.2865. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.36743, -94.28645 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,000 ft.

Completions filed
Jan 2026
1 of 1 wells

1 well

42-20333830113,000 ftJan 2026Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

Jan 20269059.138.00$532
Dec 202509856.664.41$433
Nov 2025038258.593.93$1,500
Oct 2025033659.383.30$1,110
Sep 2025032762.743.08$1,006
Aug 2025033963.933.01$1,022
Jul 2025028066.743.32$928
Jun 2025520666.483.13$977
May 2025027760.553.23$895
Apr 2025022062.363.54$779
Mar 2025025467.704.27$1,084
Feb 20251012370.884.34$1,243
Jan 2025022974.324.28$980
Dec 2024024568.993.12$765
Nov 2024030769.052.20$675
Oct 2024038371.372.28$874
Sep 20241931069.612.36$2,056
Aug 2024035875.632.06$739
Jul 2024020179.932.15$431
Jun 2024612378.082.63$792
May 2024029678.812.20$651
Apr 2024028684.451.66$475
Mar 2024026380.301.55$406
Feb 2024029076.091.78$517
Jan 2024049373.023.30$1,626
Dec 2023144671.262.61$1,236
Nov 2023247377.892.81$1,484
Oct 2023053185.443.09$1,639
Sep 2023050589.042.74$1,381
Aug 2023051780.522.67$1,382
Jul 2023453574.852.64$1,713
Jun 2023046968.962.26$1,059
May 2023050970.622.23$1,134
Apr 2023852478.122.24$1,798
Mar 2023054172.852.39$1,295
Feb 2023048775.112.47$1,201
Jan 20231455876.533.39$2,962
Dec 2022059276.415.73$3,392
Nov 2022047585.005.65$2,682
Oct 2022034987.185.86$2,046
Sep 20222027384.888.16$3,926
Aug 2022032894.529.13$2,994
Jul 20220339101.587.54$2,557
Jun 20220269115.097.98$2,146
May 20220335109.378.43$2,825
Apr 20220298104.226.84$2,038
Mar 20220303108.885.08$1,538
Feb 20221729891.054.86$2,996
Jan 2022033081.844.54$1,497
Dec 2021030571.323.90$1,189
Nov 2021032077.435.24$1,676
Oct 2021037079.795.71$2,114
Sep 20211735669.865.35$3,093
Aug 2021033666.024.22$1,418
Jul 2021035270.783.98$1,402
Jun 20213634469.493.38$3,665
May 2021037363.483.02$1,126
Apr 2021036060.362.76$993
Mar 2021050861.302.72$1,380
Feb 2021018957.805.55$1,049
Jan 2021039950.412.81$1,121
Dec 20201938844.642.68$1,886
Nov 2020038738.772.71$1,047
Oct 2020038736.972.48$959
Sep 2020038137.091.99$759
Aug 20203239039.982.39$2,210
Jul 2020040338.371.83$736
Jun 20201539534.901.69$1,191
May 2020039716.921.81$720
Apr 2020037014.751.80$668
Mar 2020043230.341.86$802
Feb 2020043549.881.98$862
Jan 2020048257.252.09$1,010
Dec 20191249859.012.30$1,856
Nov 2019050755.302.75$1,395
Oct 2019039053.472.42$943
Sep 2019047355.052.66$1,257
Aug 2019048653.112.30$1,120
Jul 20191649356.272.46$2,113
Jun 2019048052.782.49$1,196
May 20193553058.482.74$3,499
Apr 2019048862.632.75$1,342
Mar 20193752256.803.06$3,700
Feb 2019048450.852.79$1,351
Jan 2019054346.033.23$1,753
Dec 2018054746.594.19$2,289
Nov 2018055152.934.24$2,335
Oct 2018057961.443.40$1,967
Sep 2018056759.543.11$1,762
Aug 2018059359.403.07$1,818
Jul 2018059365.142.93$1,739
Jun 20188059560.183.08$6,645
May 2018054165.382.90$1,569
Apr 2018058463.842.90$1,694
Mar 2018058161.222.79$1,619
Feb 2018053361.782.77$1,474
Jan 2018059562.874.01$2,386
Dec 2017062457.272.92$1,823
Nov 2017062855.423.12$1,958
Oct 2017056449.292.98$1,683
Sep 2017060547.523.09$1,868
Aug 2017148345.373.00$1,497
Jul 2017037243.873.09$1,148
Jun 2017069242.493.09$2,136
May 2017072945.373.26$2,379
Apr 2017069947.933.21$2,245
Mar 2017074546.772.98$2,223
Feb 2017267450.452.95$2,091
Jan 2017073449.413.42$2,509
Dec 2016076948.763.72$2,863
Nov 2016075542.492.64$1,996
Oct 2016078446.193.09$2,423
Sep 2016078941.553.10$2,446
Aug 2016264641.442.92$1,972
Jul 20163166541.622.92$3,235
Jun 2016065145.352.69$1,748
May 2016073142.521.99$1,455
Apr 2016590036.561.99$1,975
Mar 2016092333.011.79$1,656
Feb 2016188626.472.06$1,855
Jan 2016096927.352.36$2,291
Dec 201501,04732.362.00$2,095
Nov 201501,07538.792.17$2,330
Oct 2015121,30343.552.43$3,684
Sep 201591,34842.992.76$4,105
Aug 201551,08640.162.87$3,320
Jul 201511,18548.152.95$3,538
Jun 201501,21056.152.88$3,488
May 201561,11455.212.96$3,624
Apr 2015361,17649.822.71$4,976
Mar 2015471,39142.892.93$6,098
Feb 2015221,27344.662.98$4,771
Jan 2015871,46843.433.10$8,330
Dec 2014361,58454.693.59$7,658
Nov 2014271,50170.464.25$8,284
Oct 2014441,47378.303.90$9,191
Sep 2014211,44486.164.05$7,651
Aug 2014341,81789.394.04$10,371
Jul 2014172,00996.564.18$10,038
Jun 2014343,08698.164.74$17,955
May 2014343,16094.734.73$18,157
Apr 2014313,21395.944.81$18,426
Mar 2014323,28395.895.06$19,670
Feb 2014262,94497.406.19$20,762
Jan 2014122,81890.404.86$14,782
Dec 2013341,62791.824.35$10,207
Nov 2013451,47288.853.74$9,501
Oct 2013631,33897.423.78$11,194
Sep 2013191,296104.113.72$6,796
Aug 2013371,456104.253.52$8,986
Jul 2013381,499102.523.72$9,469
Jun 2013341,41694.403.93$8,779
May 2013401,68294.834.15$10,772
Apr 2013611,66493.964.28$12,858
Mar 2013471,62893.623.91$10,770
Feb 2013161,57991.233.42$6,860
Jan 2013291,74591.603.42$8,624
Dec 2012341,79486.773.42$9,086
Nov 2012341,81386.953.62$9,528
Oct 2012481,86989.383.40$10,644
Sep 2012311,61194.672.92$7,636
Aug 2012291,61392.662.91$7,378
Jul 2012311,69785.133.02$7,765
Jun 2012341,86979.822.52$7,422
May 2012321,88491.612.49$7,620
Apr 2012312,032101.652.00$7,209
Mar 2012692,059105.052.22$11,824
Feb 2012302,004101.102.57$8,184
Jan 2012262,16698.092.73$8,472
Dec 2011422,16096.873.24$11,066
Nov 2011292,19295.723.31$10,034
Oct 2011382,20584.983.65$11,274
Sep 2011472,01483.623.99$11,958
Aug 2011802,06983.404.15$15,257
Jul 2011442,01494.144.52$13,240
Jun 2011631,95092.904.64$14,900
May 2011572,28198.134.40$15,641
Apr 2011562,772105.964.33$17,946
Mar 2011362,47296.364.06$13,499
Feb 2011401,06985.644.18$7,894
Jan 2011521,54586.504.59$11,588
Dec 2010532,30185.734.35$14,548
Nov 2010352,46680.843.80$12,189
Oct 2010422,59678.103.51$12,389
Sep 2010472,72872.633.98$14,270
Aug 2010592,95473.684.42$17,402
Jul 2010492,49072.554.74$15,349
Jun 2010642,49770.364.91$16,764
May 2010902,61271.124.24$17,463
Apr 2010672,43781.694.12$15,520
Mar 20101042,78078.394.39$20,353
Feb 2010761,74873.585.44$15,105
Jan 20101163,77374.365.96$31,128
Dec 2009743,97771.445.48$27,095
Nov 20091373,23374.593.75$22,347
Oct 2009663,17472.544.11$17,834
Sep 2009933,55265.543.06$16,981
Aug 2009923,88767.423.22$18,713
Jul 2009973,99261.133.46$19,760
Jun 20091424,08666.163.90$25,310
May 20091144,27054.743.93$23,003
Apr 20091424,27246.773.59$21,967
Mar 20091324,51042.144.06$23,869
Feb 20091793,53232.814.63$22,237
Jan 20091783,94235.865.37$27,556
Dec 20081825,21237.105.98$37,905
Nov 20082204,94455.496.86$46,125
Oct 20082565,10275.246.92$54,577
Sep 20082264,827101.767.88$61,020
Aug 20082025,539114.228.48$70,060
Jul 20082196,024131.0811.39$97,316
Jun 20082525,463131.3313.03$104,292
May 20083036,274123.1711.57$109,938
Apr 20083235,980110.3110.45$98,150
Mar 20083076,074101.909.66$89,983
Feb 20082487,08592.538.77$85,087
Jan 20082696,78090.388.21$79,947
Dec 20072528,03488.337.30$80,923
Nov 20073489,25291.677.29$99,364
Oct 20074429,87382.856.92$104,960
Sep 200735210,43375.846.24$91,841
Aug 200738412,01469.066.39$103,264
Jul 200738112,87970.906.39$109,283
Jun 200756518,44662.007.55$174,269
May 20074409,31958.747.85$98,965
Apr 20073269,09259.617.81$90,398
Mar 200719,46756.927.30$69,185

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2026 — as filed, then multipliedworked
Condensate             9 bbl  × $ 59.13 =       $532
Gas                    0 Mcf  × $  8.00 =         $0

────────────────────────────────────────────────────
Month total                                     $532

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/228007 is the state's own key, not one this site invented.