KYLE, FRED UNIT

Operated by XTO ENERGY INC. (P-5 945936) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228262District 06Field 160321742 tax incentive programmesCondensateGasSaveExport
Value, all time
$13.6 M
Jan 2007 – May 2026
Value, last 12 filed months
$69 k
at the published price for each month
Months reported
233
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-02-09189272
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition33,009 bbl$2,442,465
GasProduction2,186,324 Mcf$11,110,732
Total$13,553,197

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0835, -94.3364. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.08349, -94.33641 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,542 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,542 ft.

Completions filed
Jan 2007
1 of 1 wells

1 well

42-36536145139,542 ftJan 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (233)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

233 months

May 202621,449106.413.05$4,626
Apr 202631,40798.932.87$4,334
Mar 202631,44089.753.15$4,804
Feb 202621,35363.503.75$5,201
Jan 202621,39159.138.00$11,243
Dec 202531,50256.664.41$6,799
Nov 202521,58358.593.93$6,333
Oct 202521,35359.383.30$4,590
Sep 202521,47662.743.08$4,667
Aug 202521,62963.933.01$5,039
Jul 202521,67266.743.32$5,676
Jun 202521,62166.483.13$5,205
May 202521,66760.553.23$5,509
Apr 202531,61462.363.54$5,906
Mar 202531,84967.704.27$8,095
Feb 202521,45970.884.34$6,475
Jan 202531,69874.324.28$7,488
Dec 202431,86668.993.12$6,031
Nov 202431,93069.052.20$4,450
Oct 202432,18871.372.28$5,206
Sep 202432,28669.612.36$5,614
Aug 202432,26475.632.06$4,899
Jul 202432,50979.932.15$5,626
Jun 202432,62478.082.63$7,146
May 202432,40478.812.20$5,521
Apr 202442,39584.451.66$4,312
Mar 202442,48080.301.55$4,153
Feb 202452,46476.091.78$4,775
Jan 202452,70473.023.30$9,282
Dec 202363,72971.262.61$10,163
Nov 202373,61577.892.81$10,695
Oct 202373,90585.443.09$12,654
Sep 202353,85189.042.74$10,978
Aug 202363,94480.522.67$11,025
Jul 202364,71374.852.64$12,900
Jun 202374,25868.962.26$10,099
May 202374,29570.622.23$10,061
Apr 202363,86378.122.24$9,113
Mar 202374,08272.852.39$10,279
Feb 202373,63775.112.47$9,493
Jan 202373,68576.533.39$13,019
Dec 202264,01676.415.73$23,466
Nov 202263,39785.005.65$19,690
Oct 202264,26987.185.86$25,555
Sep 202243,20684.888.16$26,512
Aug 202253,59694.529.13$33,294
Jul 202253,305101.587.54$25,434
Jun 202253,624115.097.98$29,485
May 202274,725109.378.43$40,612
Apr 202284,707104.226.84$33,018
Mar 202284,830108.885.08$25,390
Feb 202284,19591.054.86$21,111
Jan 202294,83981.844.54$22,694
Dec 202174,50571.323.90$18,065
Nov 202184,80677.435.24$25,788
Oct 202153,96679.795.71$23,060
Sep 202142,70869.865.35$14,770
Aug 202143,00666.024.22$12,951
Jul 202153,52470.783.98$14,387
Jun 202164,50869.493.38$15,657
May 202184,86663.483.02$15,192
Apr 202174,70660.362.76$13,404
Mar 202195,07161.302.72$14,329
Feb 202163,23357.805.55$18,283
Jan 202194,85850.412.81$14,106
Dec 202094,99244.642.68$13,758
Nov 2020184,88438.772.71$13,917
Oct 2020355,19636.972.48$14,172
Sep 2020324,75637.091.99$10,656
Aug 2020305,32739.982.39$13,905
Jul 2020274,23238.371.83$8,760
Jun 2020263,82334.901.69$7,369
May 2020324,86216.921.81$9,365
Apr 2020374,62714.751.80$8,895
Mar 2020425,23630.341.86$10,994
Feb 2020434,96649.881.98$11,981
Jan 2020535,13557.252.09$13,791
Dec 20191085,54459.012.30$19,148
Nov 2019865,34455.302.75$19,456
Oct 2019956,24053.472.42$20,171
Sep 2019593,88655.052.66$13,574
Aug 2019744,39653.112.30$14,060
Jul 2019786,05656.272.46$19,287
Jun 2019885,35352.782.49$17,980
May 2019915,47858.482.74$20,333
Apr 2019895,09462.632.75$19,586
Mar 2019915,27056.803.06$21,306
Feb 2019703,90150.852.79$14,452
Jan 2019985,71646.033.23$22,963
Dec 2018965,84346.594.19$28,928
Nov 2018915,70452.934.24$28,986
Oct 2018875,93261.443.40$25,503
Sep 2018825,52859.543.11$22,063
Aug 2018695,64059.403.07$21,394
Jul 2018685,81365.142.93$21,473
Jun 2018695,18860.183.08$20,115
May 2018815,63765.382.90$21,648
Apr 2018885,61063.842.90$21,891
Mar 2018745,56661.222.79$20,042
Feb 2018664,03761.782.77$15,244
Jan 2018875,89662.874.01$29,109
Dec 2017815,49957.272.92$20,704
Nov 2017775,63455.423.12$21,836
Oct 2017706,07849.292.98$21,585
Sep 2017636,06547.523.09$21,718
Aug 2017545,67645.373.00$19,503
Jul 2017596,40443.873.09$22,359
Jun 2017596,24042.493.09$21,772
May 2017755,88245.373.26$22,598
Apr 2017755,60147.933.21$21,583
Mar 2017966,45846.772.98$23,759
Feb 2017955,79550.452.95$21,903
Jan 2017696,14249.413.42$24,408
Dec 2016906,21848.763.72$27,537
Nov 2016966,21842.492.64$20,522
Oct 2016986,72046.193.09$25,293
Sep 2016796,41941.553.10$23,185
Aug 2016796,34641.442.92$21,832
Jul 2016776,62641.622.92$22,581
Jun 2016966,49745.352.69$21,803
May 2016866,91642.521.99$17,427
Apr 2016936,87336.561.99$17,085
Mar 2016927,06333.011.79$15,708
Feb 2016846,34326.472.06$15,313
Jan 2016997,07427.352.36$19,433
Dec 20151107,09532.362.00$17,760
Nov 20151126,83738.792.17$19,163
Oct 2015937,49443.552.43$22,235
Sep 2015887,40542.992.76$24,209
Aug 2015777,77440.162.87$25,423
Jul 2015787,66748.152.95$26,336
Jun 2015867,16556.152.88$25,485
May 2015967,30255.212.96$26,881
Apr 2015907,42849.822.71$24,588
Mar 20151947,85342.892.93$31,367
Feb 20152027,15844.662.98$30,325
Jan 20151878,12343.433.10$33,308
Dec 20141827,29354.693.59$36,145
Nov 20141837,82670.464.25$46,169
Oct 20141838,48778.303.90$47,436
Sep 20142158,94586.164.05$54,711
Aug 20142319,24589.394.04$57,954
Jul 20142186,65796.564.18$48,874
Jun 20142156,84998.164.74$53,547
May 20142477,43894.734.73$58,554
Apr 20142817,96095.944.81$65,240
Mar 20142578,35595.895.06$66,893
Feb 20142385,68297.406.19$58,364
Jan 20142788,69690.404.86$67,400
Dec 20133028,23691.824.35$63,593
Nov 20132888,21388.853.74$56,291
Oct 20132868,69497.423.78$60,720
Sep 20132368,578104.113.72$56,461
Aug 20132148,469104.253.52$52,142
Jul 20132168,750102.523.72$54,675
Jun 20132298,58094.403.93$55,366
May 20132929,38994.834.15$66,646
Apr 20132269,32193.964.28$61,153
Mar 2013408,54493.623.91$37,176
Feb 2013367,84691.233.42$30,117
Jan 2013158,86391.603.42$31,685
Dec 2012158,89786.773.42$31,731
Nov 2012358,91786.953.62$35,367
Oct 20124410,01889.383.40$37,991
Sep 20125510,63494.672.92$36,241
Aug 2012428,92192.662.91$29,835
Jul 20125310,17085.133.02$35,233
Jun 2012519,75279.822.52$28,637
May 20128610,00991.612.49$32,784
Apr 201233210,512101.652.00$54,738
Mar 201228610,299105.052.22$52,930
Feb 20123069,878101.102.57$56,325
Jan 201230810,69298.092.73$59,445
Dec 201130210,53796.873.24$63,392
Nov 201123410,69995.723.31$57,826
Oct 201138411,39484.983.65$74,204
Sep 201132311,43583.623.99$72,587
Aug 201131311,16783.404.15$72,440
Jul 201135111,65794.144.52$85,701
Jun 201131511,24092.904.64$81,416
May 201129111,91098.134.40$81,017
Apr 201122911,455105.964.33$73,903
Mar 201125012,69296.364.06$75,586
Feb 201123811,06785.644.18$66,642
Jan 201125912,62186.504.59$80,318
Dec 201021612,56885.734.35$73,160
Nov 201022612,69780.843.80$66,459
Oct 201024913,86778.103.51$68,105
Sep 201020513,85372.633.98$70,017
Aug 201020414,57573.684.42$79,443
Jul 201021214,63672.554.74$84,704
Jun 201022214,41570.364.91$86,403
May 201025115,27871.124.24$82,557
Apr 201026215,86481.694.12$86,805
Mar 201028716,45478.394.39$94,709
Feb 201025115,28673.585.44$101,660
Jan 201026217,61074.365.96$124,510
Dec 200931318,17371.445.48$122,017
Nov 200929915,93974.593.75$82,098
Oct 200910716,67372.544.11$76,292
Sep 2009716,02265.543.06$49,562
Aug 2009717,63967.423.22$57,243
Jul 2009718,28361.133.46$63,769
Jun 2009718,54366.163.90$72,688
May 20092319,86954.743.93$79,260
Apr 200920221,04746.773.59$84,954
Mar 200929820,18442.144.06$94,485
Feb 2009683,68932.814.63$19,322
Jan 200927717,70235.865.37$105,011
Dec 200837321,59237.105.98$142,897
Nov 200840122,48555.496.86$176,507
Oct 200837523,51175.246.92$190,958
Sep 200832022,482101.767.88$209,656
Aug 20088710,097114.228.48$95,590
Jul 200818224,617131.0811.39$304,230
Jun 200816325,411131.3313.03$352,579
May 200819527,070123.1711.57$337,334
Apr 200821426,106110.3110.45$296,541
Mar 200822127,800101.909.66$291,181
Feb 200828728,11792.538.77$273,159
Jan 200836931,10690.388.21$288,598
Dec 200743634,20288.337.30$288,254
Nov 200746035,96791.677.29$304,429
Oct 200771733,09182.856.92$288,459
Sep 200766236,99375.846.24$281,196
Aug 200783440,79969.066.39$318,218
Jul 200780142,09670.906.39$325,698
Jun 200784944,07262.007.55$385,313
May 200764227,74558.747.85$255,406
Apr 200798537,22759.617.81$349,280
Mar 20071,30947,84756.927.30$423,886
Feb 20071,12441,47555.108.22$402,691
Jan 200729212,94550.306.73$101,767

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             2 bbl  × $106.41 =       $213
Gas                1,449 Mcf  × $  3.05 =     $4,413

────────────────────────────────────────────────────
Month total                                   $4,626

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/228262 is the state's own key, not one this site invented.