EDDY, EMMA

Operated by DIXIE LAKE OPERATING, LLC (P-5 100953) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229013District 06Field 160321742 tax incentive programmesGasSaveExport
Value, all time
$2.8 M
Apr 2007 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
230
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-10-18176980
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction525,950 Mcf$2,840,240
Total$2,840,240

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2248, -94.4337. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.22480, -94.43368 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,949 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,949 ft.

Completions filed
Apr 2007
1 of 1 wells

1 well

42-36536028219,949 ftApr 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (230)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

230 months

May 202664106.413.05$195
Apr 202610298.932.87$293
Mar 20266289.753.15$195
Feb 20267363.503.75$274
Jan 202615759.138.00$1,256
Dec 20256256.664.41$274
Nov 20255458.593.93$212
Oct 20255059.383.30$165
Sep 20255662.743.08$172
Aug 20255563.933.01$166
Jul 20259866.743.32$325
Jun 20255366.483.13$166
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 20249680.301.55$148
Feb 20246276.091.78$111
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 20236277.892.81$174
Oct 20233485.443.09$105
Sep 20236889.042.74$186
Aug 20238680.522.67$230
Jul 20235074.852.64$132
Jun 20235268.962.26$117
May 202310270.622.23$227
Apr 202310878.122.24$242
Mar 20235772.852.39$136
Feb 2023075.112.47$0
Jan 20239876.533.39$332
Dec 202211576.415.73$659
Nov 2022085.005.65$0
Oct 20228987.185.86$522
Sep 20229184.888.16$743
Aug 20225994.529.13$539
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 202278109.378.43$658
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 20226691.054.86$321
Jan 2022081.844.54$0
Dec 20215771.323.90$222
Nov 2021177.435.24$5
Oct 20216679.795.71$377
Sep 20216669.865.35$353
Aug 20216766.024.22$283
Jul 20219970.783.98$394
Jun 20215469.493.38$183
May 2021063.483.02$0
Apr 202113560.362.76$372
Mar 20218261.302.72$223
Feb 20219057.805.55$499
Jan 20213150.412.81$87
Dec 202023144.642.68$618
Nov 202015138.772.71$409
Oct 202023836.972.48$590
Sep 202022937.091.99$456
Aug 202031939.982.39$761
Jul 20201,32338.371.83$2,415
Jun 202087434.901.69$1,477
May 202081516.921.81$1,479
Apr 202082314.751.80$1,485
Mar 202085530.341.86$1,587
Feb 202084849.881.98$1,680
Jan 20201,37357.252.09$2,876
Dec 20191,51359.012.30$3,487
Nov 2019755.302.75$19
Oct 2019053.472.42$0
Sep 201961855.052.66$1,642
Aug 20191,37753.112.30$3,173
Jul 20192,37256.272.46$5,835
Jun 201920552.782.49$511
May 2019058.482.74$0
Apr 20193662.632.75$99
Mar 201979656.803.06$2,437
Feb 201953250.852.79$1,485
Jan 201987646.033.23$2,828
Dec 201887846.594.19$3,675
Nov 201889752.934.24$3,801
Oct 20181,17561.443.40$3,993
Sep 20181,78759.543.11$5,554
Aug 201855159.403.07$1,690
Jul 20181,37765.142.93$4,037
Jun 20181,44360.183.08$4,440
May 20181,61765.382.90$4,691
Apr 20181,53763.842.90$4,459
Mar 20181,92761.222.79$5,370
Feb 20182,10061.782.77$5,809
Jan 20182,35462.874.01$9,438
Dec 20171,90557.272.92$5,566
Nov 20171,86255.423.12$5,806
Oct 20171,61549.292.98$4,819
Sep 20171,64447.523.09$5,075
Aug 20171,75345.373.00$5,267
Jul 20171,69443.873.09$5,230
Jun 20171,73642.493.09$5,360
May 20172,31545.373.26$7,555
Apr 20172,38447.933.21$7,656
Mar 20172,24546.772.98$6,698
Feb 20172,22750.452.95$6,575
Jan 20172,33849.413.42$7,993
Dec 20162,41248.763.72$8,979
Nov 20162,25542.492.64$5,963
Oct 20162,20446.193.09$6,811
Sep 20162,11141.553.10$6,545
Aug 20162,25741.442.92$6,600
Jul 20161,90141.622.92$5,559
Jun 20161,37245.352.69$3,685
May 20161,91542.521.99$3,813
Apr 20161,51736.561.99$3,020
Mar 20161,63333.011.79$2,930
Feb 20162,95526.472.06$6,098
Jan 20163,11027.352.36$7,353
Dec 20153,08932.362.00$6,182
Nov 20152,83238.792.17$6,138
Oct 20152,93043.552.43$7,110
Sep 20152,77142.992.76$7,644
Aug 20152,82640.162.87$8,118
Jul 20152,87348.152.95$8,461
Jun 20152,77256.152.88$7,991
May 20152,90755.212.96$8,591
Apr 20152,76549.822.71$7,484
Mar 20152,97542.892.93$8,731
Feb 20152,65144.662.98$7,890
Jan 20152,68643.433.10$8,328
Dec 20142,94154.693.59$10,562
Nov 20142,70270.464.25$11,488
Oct 20142,84278.303.90$11,087
Sep 20141,58586.164.05$6,412
Aug 20141,34689.394.04$5,431
Jul 20141,46796.564.18$6,131
Jun 20141,76398.164.74$8,351
May 20141,69294.734.73$7,997
Apr 20141,51795.944.81$7,295
Mar 20141,82095.895.06$9,203
Feb 20142,19697.406.19$13,598
Jan 20141,62290.404.86$7,884
Dec 20133,07291.824.35$13,377
Nov 2013088.853.74$0
Oct 201339697.423.78$1,497
Sep 2013930104.113.72$3,458
Aug 2013950104.253.52$3,346
Jul 2013824102.523.72$3,063
Jun 201388094.403.93$3,461
May 201395794.834.15$3,971
Apr 201385193.964.28$3,644
Mar 201388893.623.91$3,475
Feb 201360191.233.42$2,055
Jan 20131,10591.603.42$3,779
Dec 20121,54386.773.42$5,277
Nov 20121,87486.953.62$6,793
Oct 20123,06389.383.40$10,413
Sep 20123,63394.672.92$10,603
Aug 20123,13492.662.91$9,114
Jul 20124,57485.133.02$13,817
Jun 20124,74379.822.52$11,948
May 20125,53491.612.49$13,770
Apr 20125,330101.652.00$10,643
Mar 2012429105.052.22$953
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 20111,09496.873.24$3,544
Nov 20111,27795.723.31$4,229
Oct 20111,22684.983.65$4,473
Sep 20111,13783.623.99$4,532
Aug 20111,08083.404.15$4,481
Jul 20111,06494.144.52$4,806
Jun 20111,21492.904.64$5,633
May 20111,47398.134.40$6,488
Apr 2011132105.964.33$572
Mar 201122596.364.06$913
Feb 20111,26185.644.18$5,271
Jan 20111,83086.504.59$8,397
Dec 20101,70985.734.35$7,430
Nov 20102,03680.843.80$7,727
Oct 20102,05678.103.51$7,214
Sep 20103,20672.633.98$12,758
Aug 20103,83773.684.42$16,957
Jul 20103,85272.554.74$18,245
Jun 20103,12570.364.91$15,345
May 20104,29271.124.24$18,178
Apr 20103,64081.694.12$15,007
Mar 20104,60578.394.39$20,210
Feb 20104,16373.585.44$22,657
Jan 20104,72874.365.96$28,198
Dec 20094,80971.445.48$26,371
Nov 20094,90174.593.75$18,386
Oct 20095,14572.544.11$21,147
Sep 20095,06065.543.06$15,508
Aug 20093,85567.423.22$12,407
Jul 20094,42861.133.46$15,341
Jun 20094,85966.163.90$18,926
May 20095,58354.743.93$21,917
Apr 20095,62446.773.59$20,176
Mar 20095,99542.144.06$24,334
Feb 20095,62632.814.63$26,065
Jan 20096,53635.865.37$35,105
Dec 20085,77537.105.98$34,518
Nov 20086,78255.496.86$46,527
Oct 20087,21475.246.92$49,935
Sep 20086,348101.767.88$50,004
Aug 20087,858114.228.48$66,660
Jul 20087,214131.0811.39$82,163
Jun 20087,697131.3313.03$100,312
May 20088,043123.1711.57$93,092
Apr 20087,601110.3110.45$79,467
Mar 20087,812101.909.66$75,496
Feb 20087,64692.538.77$67,060
Jan 20088,61690.388.21$70,701
Dec 200710,79188.337.30$78,796
Nov 200710,17591.677.29$74,193
Oct 200711,39682.856.92$78,883
Sep 200711,40875.846.24$71,233
Aug 200713,97669.066.39$89,278
Jul 200715,80470.906.39$100,955
Jun 200716,96862.007.55$128,082
May 200725,87058.747.85$202,983
Apr 200714,97159.617.81$116,852

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   64 Mcf  × $  3.05 =       $195

────────────────────────────────────────────────────
Month total                                     $195

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/229013 is the state's own key, not one this site invented.