SPIKES GAS UNIT NO. 1

Operated by SABINE OIL & GAS LLC (P-5 742142) in the MINDEN (COTTON VALLEY CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 232044District 06Field 617921112 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.0 M
Aug 2007 – Dec 2013
Value, last 12 filed months
$93 k
at the published price for each month
Months reported
77
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 456 leases and 456 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: EXCEPTION TO SWR51(A) 30 DAY RULE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-01-29180303
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition659 bbl$63,554
GasProduction463,047 Mcf$2,941,281
Total$3,004,835

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1323, -94.7206. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.13231, -94.72064 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,755 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,755 ft.

Completions filed
Mar 2014
1 of 1 wells

1 well

42-40134324710,755 ftMar 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (77)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

77 months

Dec 201370091.824.35$6,427
Nov 201301,35788.853.74$5,073
Oct 201301,87097.423.78$7,067
Sep 201301,912104.113.72$7,108
Aug 201312,082104.253.52$7,438
Jul 201332,161102.523.72$8,342
Jun 201312,06394.403.93$8,209
May 201302,17294.834.15$9,012
Apr 201312,12593.964.28$9,194
Mar 201302,17593.623.91$8,510
Feb 201322,19591.233.42$7,689
Jan 201312,44391.603.42$8,446
Dec 201212,42886.773.42$8,391
Nov 201232,35786.953.62$8,805
Oct 201232,50189.383.40$8,771
Sep 201222,43994.672.92$7,307
Aug 201222,55292.662.91$7,607
Jul 201202,45685.133.02$7,419
Jun 201202,50179.822.52$6,300
May 20121752,64691.612.49$22,616
Apr 201212,583101.652.00$5,259
Mar 201222,690105.052.22$6,188
Feb 201252,557101.102.57$7,078
Jan 201212,73898.092.73$7,584
Dec 2011172,82596.873.24$10,799
Nov 201102,84595.723.31$9,421
Oct 201102,99984.983.65$10,942
Sep 201102,90283.623.99$11,567
Aug 201102,93483.404.15$12,174
Jul 201133,06894.144.52$14,141
Jun 201103,00392.904.64$13,934
May 201173,11698.134.40$14,412
Apr 201102,997105.964.33$12,987
Mar 201153,09196.364.06$13,023
Feb 201102,79285.644.18$11,671
Jan 201103,09686.504.59$14,207
Dec 201003,19285.734.35$13,878
Nov 201003,06880.843.80$11,644
Oct 201003,11378.103.51$10,923
Sep 201002,41172.633.98$9,595
Aug 201002,62873.684.42$11,614
Jul 201022,68172.554.74$12,844
Jun 201002,80670.364.91$13,779
May 201002,99571.124.24$12,684
Apr 201003,06981.694.12$12,653
Mar 201093,02378.394.39$13,972
Feb 201002,84973.585.44$15,505
Jan 201003,31974.365.96$19,795
Dec 200903,51771.445.48$19,286
Nov 200913,43374.593.75$12,953
Oct 2009403,66672.544.11$17,970
Sep 200923,59665.543.06$11,152
Aug 200904,20867.423.22$13,543
Jul 200904,15561.133.46$14,395
Jun 200904,85666.163.90$18,914
May 200904,74154.743.93$18,612
Apr 200935,07246.773.59$18,336
Mar 200905,49642.144.06$22,308
Feb 200945,92132.814.63$27,563
Jan 200907,01635.865.37$37,683
Dec 200857,35937.105.98$44,171
Nov 200867,51955.496.86$51,916
Oct 200818,27975.246.92$57,382
Sep 200818,390101.767.88$66,191
Aug 20081919,158114.228.48$99,504
Jul 200829,777131.0811.39$111,617
Jun 2008210,663131.3313.03$139,230
May 2008712,252123.1711.57$142,670
Apr 2008112,700110.3110.45$132,887
Mar 20081914,284101.909.66$139,978
Feb 20083714,21592.538.77$128,097
Jan 2008215,67690.388.21$128,814
Dec 2007317,55688.337.30$128,458
Nov 2007022,02491.677.29$160,592
Oct 2007626,61682.856.92$184,733
Sep 2007835,07975.846.24$219,646
Aug 2007151,99869.066.39$332,229

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2013 — as filed, then multipliedworked
Condensate            70 bbl  × $ 91.82 =     $6,427
Gas                    0 Mcf  × $  4.35 =         $0

────────────────────────────────────────────────────
Month total                                   $6,427

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/232044 is the state's own key, not one this site invented.