SLONE

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the BECKVILLE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234380District 06Field 066485002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.3 M
Nov 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 503 leases and 503 wells, and the rule below applies to all of them.

Discovered
1974-05-21
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2015-02-24.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-20180990
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,752 bbl$139,762
GasProduction361,825 Mcf$2,141,972
Total$2,281,734

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3999, -94.3450. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.39987, -94.34503 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,367 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,367 ft.

Completions filed
Nov 2007
1 of 1 wells

1 well

42-20334087110,367 ftNov 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 202502662.363.54$92
Mar 202509967.704.27$423
Feb 20250070.884.34$0
Jan 202503174.324.28$133
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202402971.372.28$66
Sep 202401169.612.36$26
Aug 2024010375.632.06$213
Jul 20240079.932.15$0
Jun 20240678.082.63$16
May 20240478.812.20$9
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230178.122.24$2
Mar 20230072.852.39$0
Feb 2023035875.112.47$883
Jan 20230076.533.39$0
Dec 202202876.415.73$160
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 202206894.529.13$621
Jul 202200101.587.54$0
Jun 2022024115.097.98$191
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202202108.885.08$10
Feb 20220091.054.86$0
Jan 20220281.844.54$9
Dec 20210071.323.90$0
Nov 20210577.435.24$26
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210166.024.22$4
Jul 20210070.783.98$0
Jun 20210569.493.38$17
May 20210063.483.02$0
Apr 202102960.362.76$80
Mar 20210061.302.72$0
Feb 20210157.805.55$6
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200236.972.48$5
Sep 20200337.091.99$6
Aug 20200039.982.39$0
Jul 20200238.371.83$4
Jun 20200034.901.69$0
May 202007616.921.81$138
Apr 20200114.751.80$2
Mar 20200030.341.86$0
Feb 202005149.881.98$101
Jan 202004857.252.09$101
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 201905355.052.66$141
Aug 20190353.112.30$7
Jul 20190056.272.46$0
Jun 201905352.782.49$132
May 20190058.482.74$0
Apr 201905262.632.75$143
Mar 201907156.803.06$217
Feb 20190050.852.79$0
Jan 201906046.033.23$194
Dec 201806146.594.19$255
Nov 20180052.934.24$0
Oct 201803761.443.40$126
Sep 201805859.543.11$180
Aug 201808259.403.07$251
Jul 201806565.142.93$191
Jun 20180060.183.08$0
May 201803165.382.90$90
Apr 201802763.842.90$78
Mar 201802861.222.79$78
Feb 201801861.782.77$50
Jan 201804362.874.01$172
Dec 201703257.272.92$93
Nov 201703055.423.12$94
Oct 201702849.292.98$84
Sep 201702647.523.09$80
Aug 201703045.373.00$90
Jul 201703843.873.09$117
Jun 201701742.493.09$52
May 201704845.373.26$157
Apr 201703747.933.21$119
Mar 201708546.772.98$254
Feb 201706450.452.95$189
Jan 2017013749.413.42$468
Dec 2016016748.763.72$622
Nov 2016020242.492.64$534
Oct 2016055346.193.09$1,709
Sep 2016047741.553.10$1,479
Aug 2016083441.442.92$2,439
Jul 2016083441.622.92$2,439
Jun 2016074545.352.69$2,001
May 201616161542.521.99$8,070
Apr 2016078336.561.99$1,559
Mar 201601,08733.011.79$1,950
Feb 2016084726.472.06$1,748
Jan 201601,18027.352.36$2,790
Dec 2015089532.362.00$1,791
Nov 2015087238.792.17$1,890
Oct 201501,12043.552.43$2,718
Sep 2015099542.992.76$2,745
Aug 201501,23140.162.87$3,536
Jul 201501,16448.152.95$3,428
Jun 2015094256.152.88$2,716
May 201501,05555.212.96$3,118
Apr 201501,08849.822.71$2,945
Mar 201501,30742.892.93$3,836
Feb 2015075844.662.98$2,256
Jan 201501,18843.433.10$3,684
Dec 201401,00854.693.59$3,620
Nov 2014086070.464.25$3,657
Oct 201401,29878.303.90$5,063
Sep 201401,36086.164.05$5,502
Aug 2014086689.394.04$3,494
Jul 2014098096.564.18$4,096
Jun 2014084998.164.74$4,022
May 201401,06494.734.73$5,029
Apr 201401,25695.944.81$6,040
Mar 2014891,36295.895.06$15,422
Feb 201401,13897.406.19$7,047
Jan 201401,23990.404.86$6,022
Dec 201301,53691.824.35$6,688
Nov 201301,47788.853.74$5,521
Oct 201302,14297.423.78$8,095
Sep 20130596104.113.72$2,216
Aug 20130985104.253.52$3,470
Jul 201301,064102.523.72$3,956
Jun 201301,23594.403.93$4,858
May 201302,20094.834.15$9,128
Apr 201302,08693.964.28$8,933
Mar 201302,31793.623.91$9,066
Feb 201301,92891.233.42$6,594
Jan 201302,31591.603.42$7,917
Dec 201201,71686.773.42$5,869
Nov 20121552,49086.953.62$22,503
Oct 201201,61989.383.40$5,504
Sep 201201,74794.672.92$5,098
Aug 201201,91292.662.91$5,560
Jul 201201,82385.133.02$5,507
Jun 201202,37679.822.52$5,985
May 201201,52191.612.49$3,785
Apr 201202,101101.652.00$4,195
Mar 201202,569105.052.22$5,709
Feb 201201,810101.102.57$4,652
Jan 201202,12298.092.73$5,802
Dec 201102,64996.873.24$8,582
Nov 201102,18095.723.31$7,219
Oct 201102,43284.983.65$8,873
Sep 201102,24683.623.99$8,952
Aug 201102,61583.404.15$10,850
Jul 20111542,65894.144.52$26,504
Jun 201102,92992.904.64$13,590
May 201102,97698.134.40$13,109
Apr 201103,106105.964.33$13,459
Mar 201102,88496.364.06$11,701
Feb 201103,09485.644.18$12,933
Jan 201103,31386.504.59$15,203
Dec 201003,26885.734.35$14,208
Nov 201003,45680.843.80$13,117
Oct 201003,69678.103.51$12,969
Sep 201003,25072.633.98$12,933
Aug 20101753,62973.684.42$28,932
Jul 201003,66772.554.74$17,369
Jun 201003,26970.364.91$16,052
May 201003,73771.124.24$15,827
Apr 201003,60581.694.12$14,862
Mar 201004,03078.394.39$17,686
Feb 201003,66373.585.44$19,935
Jan 201004,19274.365.96$25,001
Dec 20091814,36971.445.48$36,889
Nov 200904,08374.593.75$15,317
Oct 200904,43572.544.11$18,229
Sep 200904,45365.543.06$13,647
Aug 200904,78067.423.22$15,384
Jul 200904,30761.133.46$14,922
Jun 200905,10766.163.90$19,892
May 200905,68754.743.93$22,326
Apr 20091735,62146.773.59$28,257
Mar 200905,91142.144.06$23,993
Feb 200905,43232.814.63$25,166
Jan 200906,20935.865.37$33,349
Dec 200806,51337.105.98$38,929
Nov 20081886,81155.496.86$57,158
Oct 200807,54175.246.92$52,199
Sep 200807,554101.767.88$59,504
Aug 200808,722114.228.48$73,989
Jul 200809,274131.0811.39$105,626
Jun 20081369,803131.3313.03$145,620
May 2008010,922123.1711.57$126,414
Apr 200815411,491110.3110.45$137,125
Mar 2008012,620101.909.66$121,961
Feb 200818612,80092.538.77$129,474
Jan 2008016,57490.388.21$136,002
Dec 2007022,75188.337.30$166,127
Nov 200701,27591.677.29$9,297

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 62.36 =         $0
Gas                   26 Mcf  × $  3.54 =        $92

────────────────────────────────────────────────────
Month total                                      $92

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/234380 is the state's own key, not one this site invented.