PINKERTON GAS UNIT

Operated by BUCKHORN OPERATING LLC (P-5 102367) in the BRACHFIELD, S.E. (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234807District 06Field 111835002 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.9 M
Feb 2008 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 382 leases and 382 wells, and the rule below applies to all of them.

Discovered
1981-02-10
as the register files it
Field class
Gas
the register's own label
Between wells
330 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2014-10-14.

The Commission's schedule remark for this field reads: API NO. 401-34011.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-08-18184904
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,443 bbl$561,302
GasProduction1,297,381 Mcf$6,359,432
Total$6,920,734

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0291, -94.6646. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.02911, -94.66462 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,810 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,810 ft.

Completions filed
Jul 2008
1 of 1 wells

1 well

42-40134363811,810 ftJul 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 20260170106.413.05$518
Apr 2026032998.932.87$944
Mar 2026025589.753.15$803
Feb 2026029863.503.75$1,118
Jan 2026017959.138.00$1,432
Dec 2025016356.664.41$719
Nov 202501258.593.93$47
Oct 2025127059.383.30$952
Sep 2025013362.743.08$409
Aug 2025032763.933.01$986
Jul 202502066.743.32$66
Jun 2025037966.483.13$1,186
May 2025276860.553.23$2,604
Apr 202535362.363.54$375
Mar 202541,71067.704.27$7,570
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240369.052.20$7
Oct 20240071.372.28$0
Sep 20240269.612.36$5
Aug 202401375.632.06$27
Jul 2024104879.932.15$902
Jun 202405878.082.63$153
May 2024060278.812.20$1,323
Apr 20240084.451.66$0
Mar 2024012180.301.55$187
Feb 202441,48376.091.78$2,950
Jan 20240073.023.30$0
Dec 2023341571.262.61$1,297
Nov 2023072677.892.81$2,038
Oct 2023135285.443.09$1,172
Sep 202302,01489.042.74$5,508
Aug 20231162,06380.522.67$14,854
Jul 202301,57674.852.64$4,163
Jun 202302,35868.962.26$5,326
May 202352,33670.622.23$5,556
Apr 202342,81978.122.24$6,621
Mar 2023132,99572.852.39$8,115
Feb 20231491,38875.112.47$14,614
Jan 202302,96876.533.39$10,055
Dec 202202,72976.415.73$15,635
Nov 202293,82485.005.65$22,356
Oct 202203,31087.185.86$19,409
Sep 202243,03684.888.16$25,124
Aug 20220094.529.13$0
Jul 20221202,519101.587.54$31,188
Jun 2022333,252115.097.98$29,740
May 202203,347109.378.43$28,225
Apr 2022112,673104.226.84$19,423
Mar 20221683,108108.885.08$34,069
Feb 202202,83191.054.86$13,755
Jan 2022113,37781.844.54$16,224
Dec 202193,17671.323.90$13,025
Nov 202103,11777.435.24$16,323
Oct 2021423,26179.795.71$21,984
Sep 202103,07569.865.35$16,454
Aug 2021172,70966.024.22$12,556
Jul 202103,35070.783.98$13,340
Jun 202102,94069.493.38$9,939
May 2021983,75663.483.02$17,555
Apr 202104,18260.362.76$11,536
Mar 2021175,26561.302.72$15,347
Feb 202103,76957.805.55$20,910
Jan 2021692,62750.412.81$10,861
Dec 202001,92244.642.68$5,142
Nov 202002,26538.772.71$6,130
Oct 202004,07636.972.48$10,102
Sep 20201769537.091.99$2,014
Aug 202001,26739.982.39$3,022
Jul 2020471,89938.371.83$5,269
Jun 2020282,94734.901.69$5,959
May 2020043816.921.81$795
Apr 2020146514.751.80$854
Mar 20203596830.341.86$2,859
Feb 202031,35549.881.98$2,833
Jan 202021,20557.252.09$2,639
Dec 201942,03359.012.30$4,921
Nov 2019411,91455.302.75$7,532
Oct 201902,33953.472.42$5,657
Sep 2019542,38355.052.66$9,305
Aug 201932,23853.112.30$5,316
Jul 2019552,25756.272.46$8,647
Jun 201902,67652.782.49$6,666
May 201992,44258.482.74$7,218
Apr 201902,34762.632.75$6,456
Mar 2019332,41056.803.06$9,254
Feb 201901,95650.852.79$5,462
Jan 2019672,53646.033.23$11,271
Dec 201802,48646.594.19$10,405
Nov 201802,26152.934.24$9,580
Oct 2018103,01161.443.40$10,846
Sep 2018602,51859.543.11$11,398
Aug 201882,74559.403.07$8,893
Jul 201803,02065.142.93$8,854
Jun 2018592,72660.183.08$11,938
May 201803,15965.382.90$9,164
Apr 201802,14663.842.90$6,225
Mar 2018753,18861.222.79$13,476
Feb 201803,70361.782.77$10,243
Jan 2018582,98462.874.01$15,610
Dec 201703457.272.92$99
Nov 2017612055.423.12$3,443
Oct 201703,42849.292.98$10,228
Sep 2017573,19747.523.09$12,579
Aug 201703,18045.373.00$9,554
Jul 201702,98243.873.09$9,206
Jun 2017573,21442.493.09$12,344
May 201703,03345.373.26$9,898
Apr 2017653,27347.933.21$13,627
Mar 201794,04146.772.98$12,478
Feb 2017634,74450.452.95$17,185
Jan 201703,25349.413.42$11,121
Dec 2016583,89548.763.72$17,329
Nov 201604,67042.492.64$12,349
Oct 20161113,19946.193.09$15,013
Sep 201603,14341.553.10$9,745
Aug 2016456,33641.442.92$20,393
Jul 2016452,95941.622.92$10,526
Jun 201602,82945.352.69$7,598
May 201602,72942.521.99$5,434
Apr 201603,25536.561.99$6,481
Mar 201603,38133.011.79$6,066
Feb 2016482,91326.472.06$7,282
Jan 201603,53827.352.36$8,365
Dec 2015483,56432.362.00$8,686
Nov 2015393,49338.792.17$9,083
Oct 2015303,69543.552.43$10,273
Sep 2015583,61042.992.76$12,451
Aug 201503,67540.162.87$10,556
Jul 2015303,52648.152.95$11,829
Jun 201503,51856.152.88$10,142
May 2015203,45655.212.96$11,318
Apr 2015283,72549.822.71$11,477
Mar 2015504,02542.892.93$13,957
Feb 201503,36544.662.98$10,015
Jan 2015303,33843.433.10$11,653
Dec 201403,26754.693.59$11,733
Nov 2014613,11170.464.25$17,526
Oct 201403,42078.303.90$13,341
Sep 2014323,56286.164.05$17,167
Aug 2014353,58889.394.04$17,607
Jul 2014253,47696.564.18$16,942
Jun 2014173,88198.164.74$20,053
May 2014173,69894.734.73$19,089
Apr 2014223,40695.944.81$18,491
Mar 2014153,59095.895.06$19,592
Feb 2014163,64697.406.19$24,134
Jan 201404,06490.404.86$19,754
Dec 2013253,97791.824.35$19,613
Nov 2013242,46288.853.74$11,336
Oct 2013244,10897.423.78$17,864
Sep 2013234,335104.113.72$18,511
Aug 2013225,435104.253.52$21,439
Jul 2013256,613102.523.72$27,148
Jun 2013177,31794.403.93$30,386
May 2013158,87194.834.15$38,229
Apr 2013319,47793.964.28$43,499
Mar 2013157,29693.623.91$29,953
Feb 2013286,53991.233.42$24,917
Jan 2013196,78191.603.42$24,931
Dec 201267,22986.773.42$25,245
Nov 201277,16186.953.62$26,567
Oct 2012137,62589.383.40$27,085
Sep 2012106,31694.672.92$19,379
Aug 2012227,15192.662.91$22,835
Jul 2012138,83585.133.02$27,795
Jun 20123010,80479.822.52$29,610
May 20121812,72291.612.49$33,305
Apr 20124314,959101.652.00$34,241
Mar 20123310,987105.052.22$27,881
Feb 20123110,885101.102.57$31,111
Jan 2012647,86298.092.73$27,773
Dec 2011297,86496.873.24$28,287
Nov 2011296,95695.723.31$25,809
Oct 201197,68784.983.65$28,811
Sep 2011187,44783.623.99$31,187
Aug 2011107,97083.404.15$33,904
Jul 201158,84394.144.52$40,417
Jun 201128,14492.904.64$37,973
May 201138,83298.134.40$39,198
Apr 201149,339105.964.33$40,892
Mar 2011710,42296.364.06$42,960
Feb 2011510,57685.644.18$44,636
Jan 2011211,05086.504.59$50,879
Dec 2010118,43385.734.35$37,608
Nov 2010187,74580.843.80$30,850
Oct 2010126,98878.103.51$25,457
Sep 201078,54872.633.98$34,525
Aug 20101012,70773.684.42$56,894
Jul 20103914,13072.554.74$69,756
Jun 2010366,56570.364.91$34,770
May 20102913,17671.124.24$57,866
Apr 20103713,66381.694.12$59,351
Mar 20103314,83478.394.39$67,688
Feb 20102814,06173.585.44$78,585
Jan 20103915,83774.365.96$97,353
Dec 20093017,02171.445.48$95,482
Nov 20093515,45074.593.75$60,571
Oct 20092916,72372.544.11$70,839
Sep 20093316,80565.543.06$53,666
Aug 20096017,93467.423.22$61,766
Jul 20095718,51361.133.46$67,623
Jun 200910818,54766.163.90$79,386
May 200916020,26654.743.93$88,318
Apr 200919020,86546.773.59$83,739
Mar 200926223,15342.144.06$105,019
Feb 200922822,70832.814.63$112,687
Jan 200918025,93635.865.37$145,757
Dec 200816826,89637.105.98$166,994
Nov 200816128,90255.496.86$207,212
Oct 200831631,97375.246.92$245,092
Sep 200843131,211101.767.88$289,710
Aug 200873334,093114.228.48$372,935
Jul 200848130,483131.0811.39$410,233
Jun 200811,601131.3313.03$20,997
May 2008424,362123.1711.57$282,466
Apr 2008326,989110.3110.45$282,497
Mar 2008642,595101.909.66$412,252
Feb 200838,22792.538.77$72,433

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  170 Mcf  × $  3.05 =       $518

────────────────────────────────────────────────────
Month total                                     $518

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/234807 is the state's own key, not one this site invented.