HAYGOOD, LOIS

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235750District 06Field 160321742 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.7 M
Apr 2008 – May 2026
Value, last 12 filed months
$38 k
at the published price for each month
Months reported
218
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-15182848
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition12,799 bbl$921,016
GasProduction935,391 Mcf$4,774,577
Total$5,695,593

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0613, -94.3537. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.06128, -94.35369 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,635 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,635 ft.

Completions filed
Apr 2008
1 of 1 wells

1 well

42-36536994159,635 ftApr 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (218)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

218 months

May 20260884106.413.05$2,693
Apr 2026086398.932.87$2,477
Mar 2026091489.753.15$2,879
Feb 2026080163.503.75$3,004
Jan 2026061259.138.00$4,895
Dec 2025096956.664.41$4,277
Nov 2025090358.593.93$3,546
Oct 202501,10759.383.30$3,658
Sep 2025168162.743.08$2,158
Aug 2025386163.933.01$2,788
Jul 2025492966.743.32$3,347
Jun 2025467466.483.13$2,375
May 202561,33160.553.23$4,666
Apr 2025477262.363.54$2,985
Mar 2025553867.704.27$2,635
Feb 2025782770.884.34$4,086
Jan 202571,03174.324.28$4,932
Dec 202481,18668.993.12$4,254
Nov 202461,39869.052.20$3,488
Oct 202471,47471.372.28$3,862
Sep 202461,48369.612.36$3,924
Aug 202451,56175.632.06$3,599
Jul 202441,64679.932.15$3,853
Jun 202421,74978.082.63$4,763
May 202421,80378.812.20$4,121
Apr 202421,73884.451.66$3,053
Mar 202421,87080.301.55$3,050
Feb 202431,81376.091.78$3,462
Jan 202421,77073.023.30$5,983
Dec 202321,92671.262.61$5,171
Nov 202321,88177.892.81$5,437
Oct 202321,99285.443.09$6,321
Sep 202322,01189.042.74$5,678
Aug 202311,22680.522.67$3,357
Jul 2023286774.852.64$2,440
Jun 2023186068.962.26$2,011
May 2023295270.622.23$2,262
Apr 2023289878.122.24$2,166
Mar 2023389872.852.39$2,368
Feb 2023275475.112.47$2,009
Jan 202351,00476.533.39$3,784
Dec 202261,38576.415.73$8,393
Nov 202261,64285.005.65$9,781
Oct 202261,74587.185.86$10,755
Sep 202251,97284.888.16$16,523
Aug 202252,01294.529.13$18,836
Jul 202252,111101.587.54$16,429
Jun 202241,967115.097.98$16,152
May 20223965109.378.43$8,466
Apr 202241,541104.226.84$10,954
Mar 202241,266108.885.08$6,862
Feb 202251,72291.054.86$8,822
Jan 202252,00981.844.54$9,525
Dec 202152,08871.323.90$8,498
Nov 202152,06477.435.24$11,196
Oct 202142,08979.795.71$12,255
Sep 202142,01769.865.35$11,072
Aug 202142,21166.024.22$9,596
Jul 202142,21370.783.98$9,095
Jun 202142,16469.493.38$7,594
May 202172,28363.483.02$7,334
Apr 2021142,36160.362.76$7,358
Mar 2021152,54661.302.72$7,837
Feb 2021111,61757.805.55$9,607
Jan 2021172,54150.412.81$7,998
Dec 2020162,52744.642.68$7,475
Nov 2020152,57738.772.71$7,556
Oct 2020142,66036.972.48$7,110
Sep 2020142,69037.091.99$5,875
Aug 2020142,83739.982.39$7,326
Jul 2020142,53338.371.83$5,160
Jun 202081,76534.901.69$3,263
May 202001,07816.921.81$1,956
Apr 2020080114.751.80$1,445
Mar 2020076730.341.86$1,424
Feb 2020076949.881.98$1,523
Jan 2020089957.252.09$1,883
Dec 2019091059.012.30$2,097
Nov 2019092255.302.75$2,536
Oct 201901,00053.472.42$2,419
Sep 201901,02355.052.66$2,718
Aug 201901,36053.112.30$3,134
Jul 2019088256.272.46$2,170
Jun 201911,22652.782.49$3,107
May 201981,28458.482.74$3,986
Apr 2019111,33162.632.75$4,350
Mar 2019111,38956.803.06$4,878
Feb 2019111,28950.852.79$4,159
Jan 2019341,31346.033.23$5,804
Dec 2018501,77346.594.19$9,750
Nov 2018391,65752.934.24$9,085
Oct 2018472,17561.443.40$10,279
Sep 2018422,36859.543.11$9,860
Aug 2018442,46959.403.07$10,185
Jul 2018482,56765.142.93$10,653
Jun 2018392,53160.183.08$10,135
May 2018312,60065.382.90$9,569
Apr 2018312,67963.842.90$9,750
Mar 2018342,87861.222.79$10,102
Feb 2018282,69861.782.77$9,193
Jan 2018332,81262.874.01$13,349
Dec 2017302,90457.272.92$10,202
Nov 2017322,98955.423.12$11,094
Oct 2017293,20649.292.98$10,995
Sep 2017263,04847.523.09$10,646
Aug 2017292,28545.373.00$8,181
Jul 2017411,44643.873.09$6,263
Jun 2017611,60642.493.09$7,550
May 2017671,72645.373.26$8,672
Apr 2017751,74847.933.21$9,209
Mar 2017811,89446.772.98$9,439
Feb 2017731,74450.452.95$8,832
Jan 2017802,02749.413.42$10,883
Dec 2016782,17648.763.72$11,904
Nov 2016692,16042.492.64$8,644
Oct 2016571,94546.193.09$8,643
Sep 2016472,17541.553.10$8,697
Aug 2016672,38741.442.92$9,757
Jul 2016672,51241.622.92$10,134
Jun 2016672,47645.352.69$9,689
May 2016712,63642.521.99$8,267
Apr 2016792,94036.561.99$8,742
Mar 2016853,18433.011.79$8,518
Feb 2016833,00826.472.06$8,404
Jan 2016903,40627.352.36$10,515
Dec 2015742,95132.362.00$8,301
Nov 2015803,13238.792.17$9,891
Oct 2015693,31643.552.43$11,051
Sep 2015743,38142.992.76$12,507
Aug 2015733,43740.162.87$12,804
Jul 2015783,39948.152.95$13,766
Jun 2015783,21256.152.88$13,639
May 2015893,65355.212.96$15,710
Apr 2015933,44149.822.71$13,947
Mar 2015933,58942.892.93$14,521
Feb 2015553,17144.662.98$11,894
Jan 2015503,50543.433.10$13,039
Dec 2014353,42354.693.59$14,207
Nov 2014303,35170.464.25$16,362
Oct 2014283,34478.303.90$15,237
Sep 2014283,39586.164.05$16,147
Aug 2014283,59989.394.04$17,025
Jul 2014343,60296.564.18$18,338
Jun 2014363,42998.164.74$19,777
May 2014473,62294.734.73$21,572
Apr 2014653,50495.944.81$23,087
Mar 20141103,68695.895.06$29,187
Feb 20141063,41297.406.19$31,452
Jan 20141193,73890.404.86$28,927
Dec 20131183,87891.824.35$27,721
Nov 20131103,78188.853.74$23,908
Oct 20131083,87797.423.78$25,174
Sep 20131003,723104.113.72$24,252
Aug 20131023,911104.253.52$24,410
Jul 20131143,897102.523.72$26,175
Jun 20131063,78294.403.93$24,883
May 20131194,12394.834.15$28,391
Apr 20131273,89493.964.28$28,609
Mar 2013564,25893.623.91$21,904
Feb 2013394,05991.233.42$17,439
Jan 2013424,67391.603.42$19,828
Dec 2012394,80286.773.42$19,808
Nov 2012394,72186.953.62$20,504
Oct 2012202,75589.383.40$11,154
Sep 2012904,66094.672.92$22,120
Aug 2012924,88092.662.91$22,717
Jul 2012874,73185.133.02$21,698
Jun 20121085,25879.822.52$21,866
May 2012703,40691.612.49$14,888
Apr 20121255,429101.652.00$23,547
Mar 2012904,650105.052.22$19,787
Feb 20121015,454101.102.57$24,229
Jan 20121106,06498.092.73$27,369
Dec 20111015,92596.873.24$28,979
Nov 2011895,68495.723.31$27,340
Oct 2011876,39684.983.65$30,729
Sep 2011836,28383.623.99$31,983
Aug 2011816,57383.404.15$34,029
Jul 2011936,79094.144.52$39,427
Jun 20111036,89292.904.64$41,547
May 20111227,46398.134.40$44,845
Apr 201100105.964.33$0
Mar 20111257,78196.364.06$43,615
Feb 20111166,83785.644.18$38,513
Jan 20111288,94886.504.59$52,132
Dec 20101328,39585.734.35$47,816
Nov 20101178,02480.843.80$39,912
Oct 20101198,96278.103.51$40,741
Sep 2010808,30872.633.98$38,872
Aug 2010597,83973.684.42$38,990
Jul 2010678,54672.554.74$45,339
Jun 2010576,96670.364.91$38,216
May 2010737,44771.124.24$36,731
Apr 2010797,60581.694.12$37,807
Mar 20101258,06678.394.39$45,198
Feb 20101748,21173.585.44$57,490
Jan 20101176,21574.365.96$45,767
Dec 20091989,71771.445.48$67,431
Nov 20091669,76074.593.75$48,997
Oct 200917710,70072.544.11$56,819
Sep 200916911,22765.543.06$45,484
Aug 200917611,59667.423.22$49,188
Jul 200918812,22361.133.46$53,839
Jun 200920912,60766.163.90$62,932
May 200922413,80254.743.93$66,445
Apr 200923513,33746.773.59$58,837
Mar 200931415,58742.144.06$76,500
Feb 20092229,50232.814.63$51,307
Jan 200929915,57735.865.37$94,386
Dec 200831716,65537.105.98$111,310
Nov 200833017,59355.496.86$139,006
Oct 200817118,15275.246.92$138,514
Sep 200810716,602101.767.88$141,664
Aug 200812820,277114.228.48$186,630
Jul 200815023,737131.0811.39$290,013
Jun 200818127,486131.3313.03$381,986
May 200827440,649123.1711.57$504,232
Apr 200816432,836110.3110.45$361,387

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  884 Mcf  × $  3.05 =     $2,693

────────────────────────────────────────────────────
Month total                                   $2,693

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/235750 is the state's own key, not one this site invented.