STONE, PEARL

Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the WASKOM (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235773District 06Field 953691602 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Nov 2007 – May 2026
Value, last 12 filed months
$24 k
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 473 leases and 477 wells, and the rule below applies to all of them.

Discovered
1955-09-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-11-06.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-30181078
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition324 bbl$33,037
GasProduction337,841 Mcf$1,823,544
Total$1,856,581

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4142, -94.1557. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.41416, -94.15571 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,900 ft.

Completions filed
Nov 2007
1 of 1 wells

1 well

42-2033415149,900 ftNov 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 202608059.138.00$640
Dec 2025067356.664.41$2,970
Nov 202501,35258.593.93$5,309
Oct 2025093559.383.30$3,090
Sep 202502,17162.743.08$6,680
Aug 2025075263.933.01$2,267
Jul 2025055866.743.32$1,850
Jun 2025040866.483.13$1,277
May 2025060660.553.23$1,959
Apr 2025058462.363.54$2,069
Mar 2025070967.704.27$3,026
Feb 2025053370.884.34$2,314
Jan 2025053174.324.28$2,272
Dec 2024070368.993.12$2,194
Nov 2024073669.052.20$1,618
Oct 2024045771.372.28$1,043
Sep 2024068769.612.36$1,624
Aug 2024065375.632.06$1,348
Jul 2024045279.932.15$970
Jun 2024071078.082.63$1,870
May 2024065678.812.20$1,442
Apr 2024084184.451.66$1,395
Mar 2024077380.301.55$1,194
Feb 2024072076.091.78$1,284
Jan 2024056673.023.30$1,866
Dec 2023068071.262.61$1,775
Nov 2023067177.892.81$1,884
Oct 2023070485.443.09$2,173
Sep 2023061789.042.74$1,688
Aug 2023068080.522.67$1,818
Jul 2023065774.852.64$1,736
Jun 2023062968.962.26$1,421
May 2023065270.622.23$1,452
Apr 2023064378.122.24$1,439
Mar 2023056872.852.39$1,359
Feb 2023046875.112.47$1,154
Jan 2023064876.533.39$2,195
Dec 2022071176.415.73$4,073
Nov 2022054485.005.65$3,072
Oct 2022072287.185.86$4,234
Sep 2022084784.888.16$6,915
Aug 2022081394.529.13$7,420
Jul 20220914101.587.54$6,893
Jun 20220895115.097.98$7,140
May 20220747109.378.43$6,299
Apr 20220820104.226.84$5,607
Mar 20220716108.885.08$3,635
Feb 2022075691.054.86$3,673
Jan 2022051781.844.54$2,346
Dec 2021086871.323.90$3,384
Nov 2021082077.435.24$4,294
Oct 2021087779.795.71$5,011
Sep 2021071069.865.35$3,799
Aug 2021077666.024.22$3,275
Jul 2021065070.783.98$2,588
Jun 2021065969.493.38$2,228
May 2021074963.483.02$2,260
Apr 2021060660.362.76$1,672
Mar 2021073961.302.72$2,008
Feb 2021059157.805.55$3,279
Jan 2021059250.412.81$1,664
Dec 2020073944.642.68$1,977
Nov 2020074538.772.71$2,016
Oct 2020070636.972.48$1,750
Sep 2020061537.091.99$1,224
Aug 2020081939.982.39$1,953
Jul 2020091038.371.83$1,661
Jun 202001,03634.901.69$1,751
May 2020096016.921.81$1,742
Apr 2020082014.751.80$1,480
Mar 2020092730.341.86$1,721
Feb 202001,00849.881.98$1,997
Jan 2020053057.252.09$1,110
Dec 201901,35959.012.30$3,132
Nov 2019052555.302.75$1,444
Oct 2019062253.472.42$1,504
Sep 2019065055.052.66$1,727
Aug 2019081453.112.30$1,876
Jul 2019082356.272.46$2,025
Jun 2019092752.782.49$2,309
May 20195571558.482.74$5,176
Apr 2019081562.632.75$2,242
Mar 2019069856.803.06$2,137
Feb 2019077950.852.79$2,175
Jan 2019072546.033.23$2,340
Dec 2018087646.594.19$3,666
Nov 2018094152.934.24$3,987
Oct 2018089861.443.40$3,051
Sep 2018086159.543.11$2,676
Aug 2018091859.403.07$2,815
Jul 201801,91965.142.93$5,626
Jun 2018065760.183.08$2,022
May 2018097565.382.90$2,828
Apr 2018061563.842.90$1,784
Mar 2018078861.222.79$2,196
Feb 201801,00161.782.77$2,769
Jan 2018061162.874.01$2,450
Dec 2017067257.272.92$1,963
Nov 2017081855.423.12$2,551
Oct 2017080049.292.98$2,387
Sep 2017098947.523.09$3,053
Aug 2017099445.373.00$2,986
Jul 2017081143.873.09$2,504
Jun 2017092842.493.09$2,865
May 2017075445.373.26$2,461
Apr 2017087847.933.21$2,820
Mar 201701,13446.772.98$3,383
Feb 2017089550.452.95$2,643
Jan 2017065749.413.42$2,246
Dec 2016085448.763.72$3,179
Nov 201601,00142.492.64$2,647
Oct 201601,12046.193.09$3,461
Sep 201601,02841.553.10$3,187
Aug 2016068341.442.92$1,997
Jul 201601,11941.622.92$3,272
Jun 201601,15545.352.69$3,102
May 201601,14442.521.99$2,278
Apr 201601,25036.561.99$2,489
Mar 2016057933.011.79$1,039
Feb 2016051926.472.06$1,071
Jan 201601,10027.352.36$2,601
Dec 2015094332.362.00$1,887
Nov 2015092538.792.17$2,005
Oct 2015095743.552.43$2,322
Sep 201501,34942.992.76$3,721
Aug 201501,66740.162.87$4,788
Jul 2015058048.152.95$1,708
Jun 2015068156.152.88$1,963
May 2015082555.212.96$2,438
Apr 2015098049.822.71$2,652
Mar 201502,11342.892.93$6,201
Feb 201502,94344.662.98$8,759
Jan 201501,32443.433.10$4,105
Dec 2014034654.693.59$1,243
Nov 2014038770.464.25$1,645
Oct 2014052478.303.90$2,044
Sep 2014058486.164.05$2,363
Aug 2014074589.394.04$3,006
Jul 2014079596.564.18$3,323
Jun 2014066898.164.74$3,164
May 2014069594.734.73$3,285
Apr 20146658095.944.81$9,121
Mar 2014059895.895.06$3,024
Feb 2014052897.406.19$3,269
Jan 2014069090.404.86$3,354
Dec 2013072791.824.35$3,166
Nov 2013060488.853.74$2,258
Oct 2013066097.423.78$2,494
Sep 20130574104.113.72$2,134
Aug 20130677104.253.52$2,385
Jul 20130867102.523.72$3,223
Jun 2013066094.403.93$2,596
May 2013083794.834.15$3,473
Apr 2013083093.964.28$3,555
Mar 2013098393.623.91$3,846
Feb 201301,44091.233.42$4,925
Jan 201301,20391.603.42$4,114
Dec 201201,57786.773.42$5,394
Nov 2012080586.953.62$2,918
Oct 2012080689.383.40$2,740
Sep 2012082494.672.92$2,405
Aug 2012088692.662.91$2,577
Jul 201201,19985.133.02$3,622
Jun 201201,51779.822.52$3,821
May 2012065491.612.49$1,627
Apr 201201,867101.652.00$3,728
Mar 201201,263105.052.22$2,806
Feb 201201,721101.102.57$4,423
Jan 2012094398.092.73$2,578
Dec 2011098396.873.24$3,185
Nov 201101,03195.723.31$3,414
Oct 201101,35584.983.65$4,944
Sep 201102,23683.623.99$8,912
Aug 201102,11583.404.15$8,776
Jul 2011092494.144.52$4,174
Jun 201101,24192.904.64$5,758
May 201101,47098.134.40$6,475
Apr 201101,247105.964.33$5,404
Mar 201101,51596.364.06$6,147
Feb 201101,41185.644.18$5,898
Jan 2011701,65186.504.59$13,631
Dec 201002,02585.734.35$8,804
Nov 201002,09380.843.80$7,944
Oct 201002,29878.103.51$8,063
Sep 201002,48172.633.98$9,873
Aug 201002,40973.684.42$10,646
Jul 201002,62772.554.74$12,443
Jun 201003,26970.364.91$16,052
May 201002,40271.124.24$10,173
Apr 201002,17781.694.12$8,975
Mar 201001,74778.394.39$7,667
Feb 201002,06773.585.44$11,249
Jan 201001,73774.365.96$10,360
Dec 200902,51971.445.48$13,814
Nov 200902,46574.593.75$9,247
Oct 200902,88472.544.11$11,854
Sep 200902,64365.543.06$8,100
Aug 200902,98867.423.22$9,617
Jul 200903,08361.133.46$10,681
Jun 200903,00266.163.90$11,693
May 200902,63054.743.93$10,325
Apr 200902,86846.773.59$10,289
Mar 200903,48542.144.06$14,146
Feb 200902,21732.814.63$10,271
Jan 200903,79835.865.37$20,399
Dec 200804,22837.105.98$25,271
Nov 200804,94155.496.86$33,897
Oct 200805,93575.246.92$41,082
Sep 200804,371101.767.88$34,431
Aug 200804,516114.228.48$38,309
Jul 20081335,888131.0811.39$84,495
Jun 200806,857131.3313.03$89,365
May 200808,029123.1711.57$92,930
Apr 200807,964110.3110.45$83,263
Mar 200808,462101.909.66$81,777
Feb 2008011,10192.538.77$97,362
Jan 2008015,76490.388.21$129,355
Dec 2007025,26788.337.30$184,499
Nov 200703,56391.677.29$25,980

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.13 =         $0
Gas                   80 Mcf  × $  8.00 =       $640

────────────────────────────────────────────────────
Month total                                     $640

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/235773 is the state's own key, not one this site invented.