WILDER GAS UNIT

Operated by BUCKHORN OPERATING LLC (P-5 102367) in the BRACHFIELD, S.E. (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235909District 06Field 111835002 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.5 M
Mar 2008 – May 2026
Value, last 12 filed months
$701
at the published price for each month
Months reported
219
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 382 leases and 382 wells, and the rule below applies to all of them.

Discovered
1981-02-10
as the register files it
Field class
Gas
the register's own label
Between wells
330 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2014-10-14.

The Commission's schedule remark for this field reads: API NO. 401-34011.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-23184467
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,528 bbl$109,464
GasProduction910,944 Mcf$5,368,970
Total$5,478,434

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0292, -94.7504. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.02918, -94.75039 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,810 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,810 ft.

Completions filed
Mar 2008
1 of 1 wells

1 well

42-40134589510,810 ftMar 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (219)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

219 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20252059.383.30$119
Sep 20250062.743.08$0
Aug 202508363.933.01$250
Jul 20250066.743.32$0
Jun 20255066.483.13$332
May 20250060.553.23$0
Apr 202505062.363.54$177
Mar 2025210567.704.27$584
Feb 202505670.884.34$243
Jan 202507674.324.28$325
Dec 2024213068.993.12$544
Nov 202401269.052.20$26
Oct 20240071.372.28$0
Sep 202409669.612.36$227
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20232080.522.67$161
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20225085.005.65$425
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202210109.378.43$109
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20211079.795.71$80
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20208044.642.68$357
Nov 20200338.772.71$8
Oct 20200336.972.48$7
Sep 20200137.091.99$2
Aug 20207439.982.39$289
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200316.921.81$5
Apr 2020610014.751.80$269
Mar 2020016030.341.86$297
Feb 20200349.881.98$6
Jan 202010857.252.09$589
Dec 20190359.012.30$7
Nov 2019141155.302.75$804
Oct 201905453.472.42$131
Sep 201903955.052.66$104
Aug 2019145053.112.30$859
Jul 20190456.272.46$10
Jun 201904952.782.49$122
May 2019185058.482.74$1,190
Apr 20190262.632.75$6
Mar 20190756.803.06$21
Feb 2019171950.852.79$918
Jan 20191618546.033.23$1,334
Dec 2018041646.594.19$1,741
Nov 2018038552.934.24$1,631
Oct 2018058361.443.40$1,981
Sep 20181835459.543.11$2,172
Aug 2018053859.403.07$1,650
Jul 2018053665.142.93$1,571
Jun 20181846460.183.08$2,511
May 2018054765.382.90$1,587
Apr 20181257763.842.90$2,440
Mar 2018047561.222.79$1,324
Feb 20181873861.782.77$3,153
Jan 2018021762.874.01$870
Dec 20171860157.272.92$2,787
Nov 2017047355.423.12$1,475
Oct 20171648449.292.98$2,233
Sep 2017049847.523.09$1,537
Aug 2017059945.373.00$1,800
Jul 20171465443.873.09$2,633
Jun 2017055242.493.09$1,704
May 20171471145.373.26$2,955
Apr 201701,00247.933.21$3,218
Mar 2017142,54746.772.98$8,254
Feb 2017152,74250.452.95$8,853
Jan 201792,67849.413.42$9,600
Dec 201601,14048.763.72$4,244
Nov 2016162,49742.492.64$7,283
Oct 2016162,59346.193.09$8,752
Sep 2016142,33841.553.10$7,831
Aug 201602,83241.442.92$8,282
Jul 2016122,45841.622.92$7,687
Jun 2016132,40945.352.69$7,060
May 2016152,49142.521.99$5,597
Apr 2016122,32536.561.99$5,068
Mar 201692,11933.011.79$4,099
Feb 2016112,01726.472.06$4,454
Jan 2016102,38027.352.36$5,901
Dec 201582,45932.362.00$5,180
Nov 201592,29438.792.17$5,321
Oct 201502,77843.552.43$6,741
Sep 201571,97242.992.76$5,741
Aug 201582,54540.162.87$7,632
Jul 201572,66848.152.95$8,195
Jun 201572,55856.152.88$7,767
May 201572,60455.212.96$8,082
Apr 201582,57249.822.71$7,360
Mar 2015102,58942.892.93$8,027
Feb 2015102,55744.662.98$8,057
Jan 2015102,80643.433.10$9,135
Dec 2014102,37254.693.59$9,066
Nov 2014102,83170.464.25$12,742
Oct 201483,01878.303.90$12,400
Sep 201483,07586.164.05$13,129
Aug 201403,32989.394.04$13,433
Jul 201473,38096.564.18$14,803
Jun 201483,05198.164.74$15,238
May 201483,33094.734.73$16,497
Apr 201462,85895.944.81$14,320
Mar 201492,86995.895.06$15,371
Feb 201402,76797.406.19$17,133
Jan 201483,73890.404.86$18,893
Dec 201352,57491.824.35$11,668
Nov 201393,61688.853.74$14,317
Oct 2013122,97597.423.78$12,413
Sep 2013103,919104.113.72$15,611
Aug 2013124,500104.253.52$17,103
Jul 2013134,165102.523.72$16,817
Jun 2013263,88994.403.93$17,751
May 2013134,20194.834.15$18,663
Apr 2013164,33093.964.28$20,047
Mar 201304,23693.623.91$16,575
Feb 201304,11691.233.42$14,076
Jan 2013181,99791.603.42$8,478
Dec 2012134,76486.773.42$17,422
Nov 2012323,82686.953.62$16,652
Oct 2012224,89389.383.40$18,601
Sep 2012204,78894.672.92$15,867
Aug 2012224,70292.662.91$15,713
Jul 2012225,45685.133.02$18,354
Jun 2012224,76979.822.52$13,769
May 2012195,43591.612.49$15,265
Apr 201285,291101.652.00$11,378
Mar 201294,590105.052.22$11,145
Feb 2012105,132101.102.57$14,201
Jan 201295,52698.092.73$15,991
Dec 2011125,40396.873.24$18,667
Nov 201195,76495.723.31$19,948
Oct 201186,44384.983.65$24,187
Sep 201135,90583.623.99$23,787
Aug 2011136,55483.404.15$28,279
Jul 2011117,37894.144.52$34,364
Jun 2011136,73392.904.64$32,448
May 2011137,30298.134.40$33,440
Apr 2011115,839105.964.33$26,468
Mar 201147,24696.364.06$29,785
Feb 201176,06085.644.18$25,930
Jan 201157,67586.504.59$35,651
Dec 201077,52285.734.35$33,304
Nov 2010317,10180.843.80$29,457
Oct 2010659,12578.103.51$37,095
Sep 2010788,87672.633.98$40,987
Aug 20107710,14973.684.42$50,525
Jul 20106510,44572.554.74$54,188
Jun 20106010,15470.364.91$54,082
May 20107010,58071.124.24$49,787
Apr 2010278,70881.694.12$38,106
Mar 2010011,49578.394.39$50,448
Feb 2010010,94773.585.44$59,578
Jan 2010013,69574.365.96$81,678
Dec 2009013,69871.445.48$75,116
Nov 2009013,58174.593.75$50,949
Oct 2009014,49872.544.11$59,590
Sep 2009014,47865.543.06$44,371
Aug 2009015,63667.423.22$50,324
Jul 2009016,27361.133.46$56,378
Jun 2009016,36466.163.90$63,738
May 2009017,74554.743.93$69,662
Apr 2009017,69846.773.59$63,492
Mar 2009014,69542.144.06$59,647
Feb 2009014,16232.814.63$65,613
Jan 2009016,71835.865.37$89,792
Dec 2008018,30837.105.98$109,429
Nov 2008024,36055.496.86$167,118
Oct 2008027,53475.246.92$190,590
Sep 2008024,444101.767.88$192,548
Aug 2008030,921114.228.48$262,303
Jul 2008035,341131.0811.39$402,514
Jun 2008039,550131.3313.03$515,441
May 2008055,060123.1711.57$637,280
Apr 2008045,571110.3110.45$476,438
Mar 200808,164101.909.66$78,897

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2025 — as filed, then multipliedworked
Condensate             2 bbl  × $ 59.38 =       $119
Gas                    0 Mcf  × $  3.30 =         $0

────────────────────────────────────────────────────
Month total                                     $119

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently