WILSON GU1

Operated by BUFFCO PRODUCTION INC. (P-5 106406) in the OAK HILL (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 237383District 06Field 664612752 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Apr 2008 – May 2026
Value, last 12 filed months
$15 k
at the published price for each month
Months reported
218
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,275 leases and 2,276 wells, and the rule below applies to all of them.

Discovered
1976-11-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-08-14184952
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition291 bbl$25,771
GasProduction216,850 Mcf$1,101,374
Total$1,127,145

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4753, -94.6622. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.47525, -94.66223 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,985 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,985 ft.

Completions filed
Apr 2008
1 of 1 wells

1 well

42-20334254410,985 ftApr 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (218)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

218 months

May 20260302106.413.05$920
Apr 2026031198.932.87$892
Mar 2026041789.753.15$1,313
Feb 2026045163.503.75$1,691
Jan 2026031559.138.00$2,519
Dec 2025052256.664.41$2,304
Nov 2025255858.593.93$2,308
Oct 2025046159.383.30$1,524
Sep 2025014962.743.08$458
Aug 2025021863.933.01$657
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 202302968.962.26$66
May 202308270.622.23$183
Apr 2023013078.122.24$291
Mar 2023010972.852.39$261
Feb 202305975.112.47$145
Jan 202309476.533.39$318
Dec 2022028376.415.73$1,621
Nov 2022019185.005.65$1,078
Oct 2022020887.185.86$1,220
Sep 2022010284.888.16$833
Aug 2022016694.529.13$1,515
Jul 20220156101.587.54$1,177
Jun 20220168115.097.98$1,340
May 20220179109.378.43$1,510
Apr 20220226104.226.84$1,545
Mar 20220247108.885.08$1,254
Feb 2022016091.054.86$777
Jan 2022020681.844.54$935
Dec 2021023171.323.90$901
Nov 2021023877.435.24$1,246
Oct 2021025079.795.71$1,428
Sep 2021021769.865.35$1,161
Aug 2021022766.024.22$958
Jul 2021020970.783.98$832
Jun 2021012069.493.38$406
May 2021016363.483.02$492
Apr 2021023160.362.76$637
Mar 2021022261.302.72$603
Feb 2021022357.805.55$1,237
Jan 2021035350.412.81$992
Dec 2020039944.642.68$1,068
Nov 2020041838.772.71$1,131
Oct 2020039836.972.48$986
Sep 2020023537.091.99$468
Aug 2020025439.982.39$606
Jul 2020017338.371.83$316
Jun 2020142134.901.69$747
May 2020032216.921.81$584
Apr 2020042814.751.80$772
Mar 2020037230.341.86$691
Feb 2020023649.881.98$467
Jan 2020023357.252.09$488
Dec 2019022359.012.30$514
Nov 2019030055.302.75$825
Oct 2019027653.472.42$668
Sep 2019025855.052.66$686
Aug 2019027353.112.30$629
Jul 2019029956.272.46$736
Jun 2019035852.782.49$892
May 2019042358.482.74$1,159
Apr 2019036262.632.75$996
Mar 2019041856.803.06$1,280
Feb 2019037850.852.79$1,055
Jan 2019351246.033.23$1,791
Dec 2018039546.594.19$1,653
Nov 2018040752.934.24$1,725
Oct 2018036361.443.40$1,234
Sep 2018017059.543.11$528
Aug 2018033259.403.07$1,018
Jul 2018032165.142.93$941
Jun 2018028260.183.08$868
May 2018028765.382.90$833
Apr 2018033363.842.90$966
Mar 2018043761.222.79$1,218
Feb 2018037861.782.77$1,046
Jan 2018046662.874.01$1,868
Dec 2017050357.272.92$1,470
Nov 2017049855.423.12$1,553
Oct 2017051649.292.98$1,540
Sep 2017035847.523.09$1,105
Aug 2017052145.373.00$1,565
Jul 2017052243.873.09$1,612
Jun 2017036542.493.09$1,127
May 2017041145.373.26$1,341
Apr 2017045247.933.21$1,452
Mar 2017049046.772.98$1,462
Feb 2017046250.452.95$1,364
Jan 2017053749.413.42$1,836
Dec 2016045148.763.72$1,679
Nov 2016040042.492.64$1,058
Oct 2016041846.193.09$1,292
Sep 2016050441.553.10$1,563
Aug 2016047641.442.92$1,392
Jul 2016054841.622.92$1,603
Jun 2016052945.352.69$1,421
May 2016054042.521.99$1,075
Apr 2016088436.561.99$1,760
Mar 2016076233.011.79$1,367
Feb 2016099926.472.06$2,062
Jan 2016095327.352.36$2,253
Dec 2015172732.362.00$1,487
Nov 2015093138.792.17$2,018
Oct 2015099943.552.43$2,424
Sep 2015094242.992.76$2,598
Aug 2015059840.162.87$1,718
Jul 2015062648.152.95$1,844
Jun 2015053456.152.88$1,539
May 201501,15755.212.96$3,419
Apr 201501,08349.822.71$2,931
Mar 201501,01342.892.93$2,973
Feb 201501,16044.662.98$3,452
Jan 201501,25943.433.10$3,904
Dec 201401,21154.693.59$4,349
Nov 201401,13570.464.25$4,826
Oct 2014095878.303.90$3,737
Sep 2014096386.164.05$3,896
Aug 201401,27989.394.04$5,161
Jul 201401,26096.564.18$5,266
Jun 201401,22098.164.74$5,779
May 201401,34194.734.73$6,338
Apr 201401,03195.944.81$4,958
Mar 201401,16095.895.06$5,866
Feb 201401,05397.406.19$6,520
Jan 201401,37890.404.86$6,698
Dec 201301,48091.824.35$6,445
Nov 201301,53188.853.74$5,723
Oct 201301,21797.423.78$4,599
Sep 201311,547104.113.72$5,855
Aug 201301,286104.253.52$4,530
Jul 201311,300102.523.72$4,936
Jun 201311,39594.403.93$5,582
May 201301,47894.834.15$6,132
Apr 201301,46893.964.28$6,287
Mar 201301,46893.623.91$5,744
Feb 201301,18691.233.42$4,056
Jan 201301,27791.603.42$4,367
Dec 201201,52286.773.42$5,205
Nov 201201,35986.953.62$4,926
Oct 201201,53589.383.40$5,219
Sep 201201,70794.672.92$4,982
Aug 201201,42092.662.91$4,130
Jul 201201,49485.133.02$4,513
Jun 201201,46779.822.52$3,695
May 2012721,41891.612.49$10,124
Apr 201201,361101.652.00$2,718
Mar 201201,353105.052.22$3,006
Feb 201201,395101.102.57$3,585
Jan 201201,46798.092.73$4,011
Dec 201101,36696.873.24$4,425
Nov 201111,60995.723.31$5,424
Oct 201101,68784.983.65$6,155
Sep 201101,51883.623.99$6,050
Aug 201101,82083.404.15$7,552
Jul 201101,91294.144.52$8,637
Jun 201101,64292.904.64$7,619
May 201111,76898.134.40$7,886
Apr 201101,678105.964.33$7,271
Mar 201111,81596.364.06$7,460
Feb 201101,74185.644.18$7,277
Jan 201101,95586.504.59$8,971
Dec 201002,09285.734.35$9,095
Nov 201002,24580.843.80$8,521
Oct 201002,59578.103.51$9,106
Sep 201002,10772.633.98$8,385
Aug 201002,12573.684.42$9,391
Jul 201002,08972.554.74$9,895
Jun 201002,06270.364.91$10,125
May 201012,05671.124.24$8,779
Apr 2010073181.694.12$3,014
Mar 2010077278.394.39$3,388
Feb 2010072573.585.44$3,946
Jan 201010981074.365.96$12,936
Dec 2009185971.445.48$4,782
Nov 2009089074.593.75$3,339
Oct 200912,39472.544.11$9,912
Sep 200902,57065.543.06$7,876
Aug 200912,56467.423.22$8,320
Jul 200912,90461.133.46$10,122
Jun 200922,82366.163.90$11,128
May 200912,84354.743.93$11,216
Apr 200903,86746.773.59$13,873
Mar 200903,90142.144.06$15,834
Feb 200903,42832.814.63$15,882
Jan 200904,11635.865.37$22,107
Dec 200804,10437.105.98$24,530
Nov 2008173,92455.496.86$27,863
Oct 200804,53175.246.92$31,363
Sep 2008114,901101.767.88$39,725
Aug 2008135,669114.228.48$49,575
Jul 2008146,835131.0811.39$79,682
Jun 2008136,595131.3313.03$87,657
May 20081710,121123.1711.57$119,237
Apr 200842,520110.3110.45$26,787

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  302 Mcf  × $  3.05 =       $920

────────────────────────────────────────────────────
Month total                                     $920

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/237383 is the state's own key, not one this site invented.