Operated by BROOKSTON ENERGY, INC. (P-5 97353) in the WOODLAWN, SW. (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 243568District 06Field 985704002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Dec 2007 – May 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 68 leases and 68 wells, and the rule below applies to all of them.

Discovered
1977-10-20
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2014-11-13.

The Commission's schedule remark for this field reads: ADOPTED, BUT REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-02-09189278
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,697 bbl$227,743
GasProduction302,271 Mcf$1,703,818
Total$1,931,561

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5546, -94.5007. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.55464, -94.50069 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,570 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,570 ft.

Completions filed
Dec 2007
1 of 1 wells

1 well

42-20334164310,570 ftDec 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260789.753.15$22
Feb 20260163.503.75$4
Jan 2026017459.138.00$1,392
Dec 2025040456.664.41$1,783
Nov 2025030458.593.93$1,194
Oct 202501,38659.383.30$4,581
Sep 2025083362.743.08$2,563
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 202124050.412.81$1,210
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201905158.482.74$140
Apr 2019012562.632.75$344
Mar 2019025956.803.06$793
Feb 201906150.852.79$170
Jan 2019013546.033.23$436
Dec 2018011646.594.19$486
Nov 2018128252.934.24$983
Oct 201803261.443.40$109
Sep 201808559.543.11$264
Aug 2018010259.403.07$313
Jul 201805965.142.93$173
Jun 201807360.183.08$225
May 2018011465.382.90$331
Apr 2018017363.842.90$502
Mar 2018018761.222.79$521
Feb 2018020761.782.77$573
Jan 2018021062.874.01$842
Dec 2017014457.272.92$421
Nov 2017028855.423.12$898
Oct 2017022349.292.98$665
Sep 2017017347.523.09$534
Aug 2017021745.373.00$652
Jul 2017024943.873.09$769
Jun 2017018842.493.09$580
May 2017027945.373.26$910
Apr 2017028947.933.21$928
Mar 2017030346.772.98$904
Feb 2017022050.452.95$650
Jan 2017019649.413.42$670
Dec 2016015948.763.72$592
Nov 2016031342.492.64$828
Oct 2016024446.193.09$754
Sep 2016031641.553.10$980
Aug 2016030541.442.92$892
Jul 2016033441.622.92$977
Jun 20163932345.352.69$2,636
May 2016030242.521.99$601
Apr 2016039436.561.99$784
Mar 2016151733.011.79$961
Feb 2016046826.472.06$966
Jan 2016056327.352.36$1,331
Dec 2015069132.362.00$1,383
Nov 2015072338.792.17$1,567
Oct 2015035343.552.43$857
Sep 2015042842.992.76$1,181
Aug 2015052640.162.87$1,511
Jul 2015059048.152.95$1,738
Jun 201501,50556.152.88$4,339
May 20151537855.212.96$1,945
Apr 2015088749.822.71$2,401
Mar 2015411,04742.892.93$4,831
Feb 201501,14244.662.98$3,399
Jan 201501,21643.433.10$3,770
Dec 2014381,18354.693.59$6,327
Nov 201401,25770.464.25$5,345
Oct 201401,15778.303.90$4,513
Sep 2014241,26886.164.05$7,197
Aug 201401,43189.394.04$5,774
Jul 2014261,47896.564.18$8,688
Jun 201401,43898.164.74$6,812
May 201401,46894.734.73$6,939
Apr 2014311,39495.944.81$9,678
Mar 2014331,51395.895.06$10,815
Feb 201431,66397.406.19$10,590
Jan 201401,69390.404.86$8,229
Dec 2013271,56191.824.35$9,276
Nov 2013511,25188.853.74$9,208
Oct 201311,56497.423.78$6,008
Sep 2013381,586104.113.72$9,853
Aug 2013511,661104.253.52$11,168
Jul 2013371,786102.523.72$10,433
Jun 2013241,76494.403.93$9,204
May 2013261,92794.834.15$10,461
Apr 2013492,14393.964.28$13,782
Mar 2013481,94693.623.91$12,108
Feb 201331,01491.233.42$3,741
Jan 201331,17391.603.42$4,286
Dec 2012151,94586.773.42$7,954
Nov 2012471,93286.953.62$11,090
Oct 201232,12189.383.40$7,479
Sep 2012372,13594.672.92$9,734
Aug 201232,20992.662.91$6,702
Jul 201232,14185.133.02$6,723
Jun 201202,18779.822.52$5,509
May 2012372,17991.612.49$8,812
Apr 201212,006101.652.00$4,107
Mar 201232,136105.052.22$5,062
Feb 2012321,832101.102.57$7,944
Jan 201202,21798.092.73$6,061
Dec 2011452,21196.873.24$11,522
Nov 2011372,31195.723.31$11,194
Oct 2011342,11484.983.65$10,602
Sep 201102,31383.623.99$9,219
Aug 201102,63483.404.15$10,929
Jul 201102,50594.144.52$11,316
Jun 2011312,48692.904.64$14,415
May 2011233,33798.134.40$16,956
Apr 201102,910105.964.33$12,610
Mar 2011252,92096.364.06$14,256
Feb 2011242,65285.644.18$13,141
Jan 201102,87886.504.59$13,207
Dec 2010273,02085.734.35$15,445
Nov 201002,95380.843.80$11,208
Oct 2010143,07278.103.51$11,873
Sep 2010522,89272.633.98$15,285
Aug 201003,11973.684.42$13,784
Jul 2010283,09072.554.74$16,667
Jun 201002,97170.364.91$14,589
May 2010323,15571.124.24$15,638
Apr 201003,30081.694.12$13,605
Mar 2010443,27678.394.39$17,826
Feb 2010223,06673.585.44$18,305
Jan 2010283,19174.365.96$21,113
Dec 200943,72571.445.48$20,713
Nov 20096640574.593.75$6,442
Oct 2009343,97872.544.11$18,817
Sep 200904,09965.543.06$12,562
Aug 2009354,23867.423.22$16,000
Jul 2009564,62661.133.46$19,450
Jun 200944,80766.163.90$18,988
May 2009774,89854.743.93$23,443
Apr 2009335,05046.773.59$19,660
Mar 2009725,57342.144.06$25,655
Feb 2009164,20932.814.63$20,025
Jan 2009465,52235.865.37$31,308
Dec 20081125,86937.105.98$39,235
Nov 2008655,80155.496.86$43,404
Oct 2008686,93975.246.92$53,148
Sep 2008837,793101.767.88$69,832
Aug 2008268,410114.228.48$74,312
Jul 200806,995131.0811.39$79,669
Jun 20081569,579131.3313.03$145,327
May 2008887,926123.1711.57$102,577
Apr 200822811,016110.3110.45$140,321
Mar 2008207,891101.909.66$78,297
Feb 2008565,18592.538.77$50,657
Jan 2008605,52290.388.21$50,735
Dec 2007010,80788.337.30$78,912

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.75 =         $0
Gas                    7 Mcf  × $  3.15 =        $22

────────────────────────────────────────────────────
Month total                                      $22

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/243568 is the state's own key, not one this site invented.