DIXON, JOHN M.

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the SOUTHERN PINE (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 248181District 06Field 84742500CondensateGasSaveExport
Value, all time
$2.6 M
Dec 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 43 leases and 43 wells, and the rule below applies to all of them.

Discovered
1979-04-24
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-04-24.

The Commission's schedule remark for this field reads: DIAGONAL AND ALLOCATION FORMULA REMAINS SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$215
GasProduction509,052 Mcf$2,648,290
Total$2,648,505

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6287, -95.2169. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.62867, -95.21690 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,093 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,093 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-07331153511,093 ftMar 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230985.443.09$28
Sep 202303289.042.74$88
Aug 20230780.522.67$19
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 202301978.122.24$43
Mar 202303272.852.39$77
Feb 202303575.112.47$86
Jan 202303276.533.39$108
Dec 202203076.415.73$172
Nov 20220085.005.65$0
Oct 202201487.185.86$82
Sep 20220084.888.16$0
Aug 202207294.529.13$657
Jul 20220244101.587.54$1,840
Jun 20220148115.097.98$1,181
May 2022039109.378.43$329
Apr 20220112104.226.84$766
Mar 202200108.885.08$0
Feb 202204691.054.86$224
Jan 2022011881.844.54$535
Dec 2021045571.323.90$1,774
Nov 2021022177.435.24$1,157
Oct 2021072579.795.71$4,143
Sep 20210069.865.35$0
Aug 2021019766.024.22$831
Jul 2021014270.783.98$565
Jun 2021045469.493.38$1,535
May 2021041163.483.02$1,240
Apr 2021049860.362.76$1,374
Mar 2021023161.302.72$628
Feb 2021025457.805.55$1,409
Jan 2021025250.412.81$708
Dec 2020044644.642.68$1,193
Nov 202008938.772.71$241
Oct 2020023236.972.48$575
Sep 2020045237.091.99$900
Aug 2020015439.982.39$367
Jul 2020016138.371.83$294
Jun 2020019934.901.69$336
May 2020039716.921.81$720
Apr 2020032214.751.80$581
Mar 2020010730.341.86$199
Feb 2020027449.881.98$543
Jan 2020010557.252.09$220
Dec 2019012259.012.30$281
Nov 2019044555.302.75$1,224
Oct 201905453.472.42$131
Sep 2019091255.052.66$2,423
Aug 201901,08153.112.30$2,491
Jul 2019093256.272.46$2,293
Jun 201901,06652.782.49$2,656
May 2019010458.482.74$285
Apr 2019019462.632.75$534
Mar 2019012756.803.06$389
Feb 20190050.852.79$0
Jan 201902346.033.23$74
Dec 201807046.594.19$293
Nov 201802552.934.24$106
Oct 20180061.443.40$0
Sep 2018013159.543.11$407
Aug 201805359.403.07$163
Jul 201807965.142.93$232
Jun 201808760.183.08$268
May 201806465.382.90$186
Apr 2018041663.842.90$1,207
Mar 2018016661.222.79$463
Feb 2018011761.782.77$324
Jan 201801362.874.01$52
Dec 2017022557.272.92$657
Nov 2017014355.423.12$446
Oct 201709249.292.98$275
Sep 2017028947.523.09$892
Aug 2017119745.373.00$637
Jul 201701,00843.873.09$3,112
Jun 2017028042.493.09$864
May 2017038845.373.26$1,266
Apr 20170047.933.21$0
Mar 2017010146.772.98$301
Feb 201707650.452.95$224
Jan 201709249.413.42$315
Dec 201601,05148.763.72$3,913
Nov 201603,44942.492.64$9,120
Oct 201603,49546.193.09$10,800
Sep 201602,86541.553.10$8,883
Aug 201603,76841.442.92$11,019
Jul 201601,87041.622.92$5,469
Jun 201602,13345.352.69$5,729
May 201601,96642.521.99$3,914
Apr 201601,10936.561.99$2,208
Mar 201601,37533.011.79$2,467
Feb 201601,96526.472.06$4,055
Jan 201601,93027.352.36$4,563
Dec 201502,30432.362.00$4,611
Nov 201502,12838.792.17$4,612
Oct 201502,60643.552.43$6,324
Sep 201502,50342.992.76$6,904
Aug 201502,49940.162.87$7,178
Jul 201503,27948.152.95$9,657
Jun 201502,76556.152.88$7,971
May 201502,91855.212.96$8,624
Apr 201502,53549.822.71$6,861
Mar 201502,92642.892.93$8,587
Feb 201502,64444.662.98$7,869
Jan 201502,95743.433.10$9,169
Dec 201402,91954.693.59$10,483
Nov 201402,78470.464.25$11,837
Oct 201402,95178.303.90$11,512
Sep 201402,85586.164.05$11,550
Aug 201402,89989.394.04$11,698
Jul 201402,80696.564.18$11,728
Jun 201402,73198.164.74$12,936
May 201403,04494.734.73$14,388
Apr 201403,08095.944.81$14,812
Mar 201403,06395.895.06$15,489
Feb 201402,62597.406.19$16,254
Jan 201402,56590.404.86$12,468
Dec 201302,88091.824.35$12,541
Nov 201302,82488.853.74$10,557
Oct 201303,07697.423.78$11,625
Sep 201302,955104.113.72$10,986
Aug 201303,654104.253.52$12,872
Jul 201303,683102.523.72$13,692
Jun 201303,52194.403.93$13,850
May 201303,40994.834.15$14,144
Apr 201303,51993.964.28$15,070
Mar 201302,89793.623.91$11,336
Feb 201303,20791.233.42$10,968
Jan 201303,31491.603.42$11,334
Dec 201203,48286.773.42$11,909
Nov 201203,42586.953.62$12,415
Oct 201202,60489.383.40$8,853
Sep 201202,42594.672.92$7,077
Aug 201202,85692.662.91$8,306
Jul 201202,98485.133.02$9,014
Jun 201203,13379.822.52$7,892
May 201203,04991.612.49$7,587
Apr 201202,857101.652.00$5,705
Mar 201202,859105.052.22$6,353
Feb 201202,604101.102.57$6,693
Jan 201202,92498.092.73$7,994
Dec 201103,35196.873.24$10,856
Nov 201102,99695.723.31$9,921
Oct 201103,31784.983.65$12,102
Sep 201103,09283.623.99$12,324
Aug 201103,23183.404.15$13,406
Jul 201103,11694.144.52$14,076
Jun 201103,24192.904.64$15,038
May 201103,08698.134.40$13,593
Apr 201102,822105.964.33$12,229
Mar 201103,06796.364.06$12,444
Feb 201102,57085.644.18$10,743
Jan 201103,01486.504.59$13,831
Dec 201003,22285.734.35$14,008
Nov 201003,03980.843.80$11,534
Oct 201003,11278.103.51$10,920
Sep 201003,46972.633.98$13,805
Aug 201003,77073.684.42$16,661
Jul 201003,08472.554.74$14,607
Jun 201002,72670.364.91$13,386
May 201003,58971.124.24$15,200
Apr 201003,58381.694.12$14,772
Mar 201003,72078.394.39$16,326
Feb 201003,15073.585.44$17,143
Jan 201003,51174.365.96$20,940
Dec 200903,22471.445.48$17,680
Nov 200902,43474.593.75$9,131
Oct 200903,60272.544.11$14,805
Sep 200902,83765.543.06$8,695
Aug 200903,04867.423.22$9,810
Jul 200904,07961.133.46$14,132
Jun 200903,89066.163.90$15,152
May 200904,16554.743.93$16,351
Apr 200904,06446.773.59$14,580
Mar 200903,99442.144.06$16,212
Feb 200903,67032.814.63$17,003
Jan 200904,24935.865.37$22,821
Dec 200804,66137.105.98$27,859
Nov 200804,84255.496.86$33,218
Oct 200806,32975.246.92$43,809
Sep 200803,134101.767.88$24,687
Aug 200803,231114.228.48$27,409
Jul 200804,937131.0811.39$56,230
Jun 200805,260131.3313.03$68,552
May 200803,665123.1711.57$42,420
Apr 200804,192110.3110.45$43,827
Mar 200804,137101.909.66$39,980
Feb 200804,36892.538.77$38,310
Jan 200805,34390.388.21$43,843
Dec 200703,81588.337.30$27,857
Nov 200702,71391.677.29$19,782
Oct 200702,74482.856.92$18,994
Sep 200702,91775.846.24$18,214
Aug 200707,02569.066.39$44,875
Jul 200706,58770.906.39$42,077
Jun 200705,15662.007.55$38,920
May 200706,26758.747.85$49,173
Apr 200706,05159.617.81$47,229
Mar 200706,56956.927.30$47,967
Feb 200706,09955.108.22$50,109
Jan 200707,49550.306.73$50,418
Dec 200606,73056.656.92$46,561
Nov 200607,41954.207.62$56,514
Oct 200608,45654.906.01$50,853
Sep 200609,37960.085.04$47,244
Aug 200608,81868.717.34$64,723
Jul 200607,87869.376.34$49,968
Jun 200608,36666.286.38$53,408
May 200609,23066.016.42$59,303
Apr 2006013,48464.397.36$99,249
Mar 200637,17956.707.08$51,018
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 85.44 =         $0
Gas                    9 Mcf  × $  3.09 =        $28

────────────────────────────────────────────────────
Month total                                      $28

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/248181 is the state's own key, not one this site invented.