MCCANTS

Operated by EAGLE OIL & GAS CO. (P-5 238634) in the CCB (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 256666District 06Field 142120752 tax incentive programmesGasSaveExport
Value, all time
$218 k
Dec 2009 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
198
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
2005-03-23
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2012.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112011-02-28201220
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction50,586 Mcf$218,409
Total$218,409

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8500, -94.2194. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.85004, -94.21940 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,738 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,738 ft.

Completions filed
Dec 2009
1 of 1 wells

1 well

42-41931476111,738 ftDec 2009

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (198)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

198 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 201723957.272.92$698
Nov 2017055.423.12$0
Oct 201719149.292.98$570
Sep 201722047.523.09$679
Aug 201722045.373.00$661
Jul 201722043.873.09$679
Jun 201720242.493.09$624
May 201723045.373.26$751
Apr 201714347.933.21$459
Mar 201714346.772.98$427
Feb 201724150.452.95$712
Jan 201714349.413.42$489
Dec 201617548.763.72$652
Nov 201611742.492.64$309
Oct 201614846.193.09$457
Sep 201618841.553.10$583
Aug 201631341.442.92$915
Jul 201612741.622.92$371
Jun 201613645.352.69$365
May 201620142.521.99$400
Apr 201620136.561.99$400
Mar 201624933.011.79$447
Feb 20166826.472.06$140
Jan 201613727.352.36$324
Dec 20153632.362.00$72
Nov 201513538.792.17$293
Oct 201514443.552.43$349
Sep 20155442.992.76$149
Aug 201512340.162.87$353
Jul 201520348.152.95$598
Jun 201515556.152.88$447
May 201512755.212.96$375
Apr 201526449.822.71$715
Mar 201526742.892.93$784
Feb 201524644.662.98$732
Jan 201529843.433.10$924
Dec 201424954.693.59$894
Nov 201411770.464.25$497
Oct 20145678.303.90$218
Sep 20148686.164.05$348
Aug 201410889.394.04$436
Jul 201410096.564.18$418
Jun 201410098.164.74$474
May 20149294.734.73$435
Apr 20145995.944.81$284
Mar 20148095.895.06$405
Feb 20147597.406.19$464
Jan 201420390.404.86$987
Dec 201319291.824.35$836
Nov 201312488.853.74$464
Oct 20135897.423.78$219
Sep 2013117104.113.72$435
Aug 201385104.253.52$299
Jul 201361102.523.72$227
Jun 2013094.403.93$0
May 201312294.834.15$506
Apr 2013093.964.28$0
Mar 201316293.623.91$634
Feb 20139791.233.42$332
Jan 201321491.603.42$732
Dec 201272486.773.42$2,476
Nov 201232686.953.62$1,182
Oct 20125889.383.40$197
Sep 20128994.672.92$260
Aug 201247792.662.91$1,387
Jul 201216585.133.02$498
Jun 201226979.822.52$678
May 201225291.612.49$627
Apr 2012238101.652.00$475
Mar 2012414105.052.22$920
Feb 2012135101.102.57$347
Jan 201255998.092.73$1,528
Dec 201157296.873.24$1,853
Nov 201117795.723.31$586
Oct 201170684.983.65$2,576
Sep 201166883.623.99$2,663
Aug 201132183.404.15$1,332
Jul 201164194.144.52$2,896
Jun 201128392.904.64$1,313
May 201137198.134.40$1,634
Apr 2011646105.964.33$2,799
Mar 201131996.364.06$1,294
Feb 201161585.644.18$2,571
Jan 20111,99486.504.59$9,150
Dec 20101,96985.734.35$8,561
Nov 20101,66980.843.80$6,334
Oct 20101,38178.103.51$4,846
Sep 20101,17372.633.98$4,668
Aug 20101,57273.684.42$6,947
Jul 20101,36172.554.74$6,446
Jun 20101,73370.364.91$8,510
May 20102,08571.124.24$8,830
Apr 20102,12981.694.12$8,777
Mar 20102,96878.394.39$13,026
Feb 20102,55773.585.44$13,916
Jan 20105,04674.365.96$30,095
Dec 20095,06371.445.48$27,764

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2017 — as filed, then multipliedworked
Gas                  239 Mcf  × $  2.92 =       $698

────────────────────────────────────────────────────
Month total                                     $698

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/256666 is the state's own key, not one this site invented.