TILLISON

Operated by HOWELL OIL & GAS, INC. (P-5 406605) in the MINDEN (TRAVIS PEAK CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 261369District 06Field 61792380CondensateGasSaveExport
Value, all time
$1.2 M
Jan 2011 – Apr 2017
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
76
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 304 leases and 325 wells, and the rule below applies to all of them.

Discovered
2006-03-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: EFF. 11-12-08. ALLOCATION FORMULA REMAINS SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,540 bbl$328,877
GasProduction233,921 Mcf$889,299
Total$1,218,175

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1322, -94.6812. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.13223, -94.68124 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,607 ft
1 wells filed one
Completion to plug
6.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,607 ft.

Completions filed
Jan 2011
1 of 1 wells
Plug dates filed
Apr 2017
1 of 1 wells

Last completion to plug: a median of 6.3 years across the 1 well that filed both dates, with the middle half between 6.3 years and 6.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4013513317,607 ftJan 2011Apr 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (76)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

76 months

Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 201760049.413.42$2,965
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 201506242.892.93$182
Feb 2015028944.662.98$860
Jan 2015026143.433.10$809
Dec 201415660854.693.59$10,715
Nov 2014097170.464.25$4,129
Oct 201401,14578.303.90$4,467
Sep 2014089486.164.05$3,617
Aug 201401,61689.394.04$6,521
Jul 201401,74396.564.18$7,285
Jun 201401,77598.164.74$8,408
May 201402,03494.734.73$9,614
Apr 201401,90695.944.81$9,166
Mar 201402,19995.895.06$11,120
Feb 20141501,80297.406.19$25,768
Jan 201402,27190.404.86$11,039
Dec 201302,02891.824.35$8,831
Nov 201302,55388.853.74$9,544
Oct 201302,32097.423.78$8,768
Sep 20131882,093104.113.72$27,354
Aug 201302,008104.253.52$7,073
Jul 201302,224102.523.72$8,268
Jun 201301,98794.403.93$7,816
May 201302,18294.834.15$9,053
Apr 201302,45693.964.28$10,518
Mar 201302,60193.623.91$10,177
Feb 20131822,56791.233.42$25,383
Jan 201303,17891.603.42$10,868
Dec 201203,48486.773.42$11,916
Nov 201204,74386.953.62$17,193
Oct 201204,05589.383.40$13,786
Sep 20121904,11094.672.92$29,982
Aug 201204,96492.662.91$14,436
Jul 201202,99285.133.02$9,038
Jun 201203,47879.822.52$8,761
May 20121975,27691.612.49$31,176
Apr 201205,119101.652.00$10,222
Mar 201205,718105.052.22$12,706
Feb 20121945,837101.102.57$34,616
Jan 201206,89898.092.73$18,860
Dec 20111667,66096.873.24$40,897
Nov 201107,85395.723.31$26,003
Oct 20111859,09184.983.65$48,890
Sep 20111929,91883.623.99$55,586
Aug 2011011,36883.404.15$47,169
Jul 201116113,78894.144.52$77,440
Jun 201118413,61892.904.64$80,279
May 201137313,28898.134.40$95,134
Apr 201137814,703105.964.33$103,765
Mar 201138916,32796.364.06$103,728
Feb 201119511,86085.644.18$66,274
Jan 20110086.504.59$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2017 — as filed, then multipliedworked
Condensate            60 bbl  × $ 49.41 =     $2,965
Gas                    0 Mcf  × $  3.42 =         $0

────────────────────────────────────────────────────
Month total                                   $2,965

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/261369 is the state's own key, not one this site invented.