BURNETT UNIT 7

Operated by R. LACY SERVICES, LTD. (P-5 687208) in the BRIGGS (UPPER TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 285702District 06Field 11956400CondensateGasSaveExport
Value, all time
$502 k
Jul 2018 – Apr 2024
Value, last 12 filed months
$0
at the published price for each month
Months reported
70
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 89 leases and 89 wells, and the rule below applies to all of them.

Discovered
1988-08-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1990-07-30.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED ADMINISTRATIVELY EFF. 7-1-93

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,359 bbl$183,042
GasProduction108,744 Mcf$319,437
Total$502,479

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2650, -94.3064. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.26497, -94.30640 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,150 ft
1 wells filed one
Completion to plug
5.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,150 ft.

Completions filed
Jul 2018
1 of 1 wells
Plug dates filed
May 2024
1 of 1 wells

Last completion to plug: a median of 5.8 years across the 1 well that filed both dates, with the middle half between 5.8 years and 5.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-36531171168,150 ftJul 2018May 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (70)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

70 months

Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 2021324777.435.24$1,526
Oct 2021172,74379.795.71$17,030
Sep 2021182,09369.865.35$12,457
Aug 2021172,12966.024.22$10,108
Jul 2021192,29770.783.98$10,492
Jun 2021202,22469.493.38$8,908
May 2021202,28463.483.02$8,162
Apr 2021272,31660.362.76$8,018
Mar 2021342,56761.302.72$9,059
Feb 2021231,49557.805.55$9,624
Jan 2021342,29250.412.81$8,155
Dec 2020342,39444.642.68$7,923
Nov 2020272,23338.772.71$7,091
Oct 2020282,31036.972.48$6,760
Sep 2020202,32937.091.99$5,379
Aug 202082,32239.982.39$5,858
Jul 202092,34038.371.83$4,616
Jun 202082,23634.901.69$4,059
May 202072,13516.921.81$3,993
Apr 2020112,40214.751.80$4,496
Mar 2020132,34230.341.86$4,742
Feb 2020172,86149.881.98$6,515
Jan 2020162,98657.252.09$7,171
Dec 2019132,53559.012.30$6,609
Nov 2019152,81955.302.75$8,584
Oct 2019212,91453.472.42$8,171
Sep 2019172,79055.052.66$8,350
Aug 2019213,00853.112.30$8,047
Jul 2019203,12056.272.46$8,801
Jun 2019223,11352.782.49$8,916
May 2019213,03558.482.74$9,545
Apr 2019443,51062.632.75$12,411
Mar 20193673,43156.803.06$31,352
Feb 20191811,39650.852.79$13,102
Jan 20194524,71246.033.23$36,017
Dec 20182241,90346.594.19$18,401
Nov 20183623,65552.934.24$34,648
Oct 20183574,49961.443.40$37,222
Sep 20182943,42559.543.11$28,150
Aug 20184857,07059.403.07$50,490
Jul 20181323265.142.93$1,527

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2021 — as filed, then multipliedworked
Condensate             3 bbl  × $ 77.43 =       $232
Gas                  247 Mcf  × $  5.24 =     $1,294

────────────────────────────────────────────────────
Month total                                   $1,526

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/285702 is the state's own key, not one this site invented.