HOOPER HV UNIT D

Operated by TGNR EAST TEXAS II LLC (P-5 102211) in the CARTHAGE (HAYNESVILLE SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 292262District 06Field 16032300GasSave
Value, all time
$46.4 M
Oct 2021 – May 2026
Value, last 12 filed months
$2.3 M
at the published price for each month
Months reported
56
no gaps in the span
Streams
1
gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction9,623,016 Mcf$46,405,516
Total$46,405,516

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0696, -94.0478. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.06958, -94.04782 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,378 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,378 ft.

Completions filed
Oct 2021
1 of 1 wells

1 well

42-365386224H11,378 ftOct 2021

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (56)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

56 months

May 202645,089106.413.05$137,334
Apr 202646,03298.932.87$132,099
Mar 202646,86689.753.15$147,602
Feb 202644,40863.503.75$166,544
Jan 202649,57959.138.00$396,529
Dec 202550,24256.664.41$221,736
Nov 202551,19058.593.93$200,994
Oct 202556,84759.383.30$187,870
Sep 202553,94962.743.08$165,997
Aug 202557,03263.933.01$171,938
Jul 202558,15066.743.32$192,779
Jun 202557,14066.483.13$178,775
May 202561,14760.553.23$197,647
Apr 202560,34662.363.54$213,813
Mar 202564,86767.704.27$276,873
Feb 202560,52170.884.34$262,712
Jan 202569,69474.324.28$298,198
Dec 202472,34868.993.12$225,825
Nov 202473,24069.052.20$161,014
Oct 202477,69371.372.28$177,249
Sep 202481,05169.612.36$191,634
Aug 202487,37875.632.06$180,316
Jul 202495,18879.932.15$204,330
Jun 202497,86578.082.63$257,774
May 202492,03678.812.20$202,336
Apr 202484,05384.451.66$139,461
Mar 202487,67380.301.55$135,466
Feb 202482,81776.091.78$147,716
Jan 2024103,32473.023.30$340,727
Dec 2023109,67971.262.61$286,341
Nov 2023111,43777.892.81$312,866
Oct 2023118,06785.443.09$364,506
Sep 2023122,96389.042.74$336,309
Aug 2023134,76180.522.67$360,200
Jul 2023144,68474.852.64$382,226
Jun 2023148,43768.962.26$335,242
May 2023151,59770.622.23$337,667
Apr 2023161,19378.122.24$360,711
Mar 2023178,92072.852.39$428,184
Feb 2023173,99175.112.47$429,006
Jan 2023209,32276.533.39$709,124
Dec 2022226,60176.415.73$1,298,215
Nov 2022239,62485.005.65$1,352,965
Oct 2022273,00187.185.86$1,600,812
Sep 2022344,75184.888.16$2,814,437
Aug 2022330,06994.529.13$3,012,593
Jul 2022341,993101.587.54$2,579,339
Jun 2022361,168115.097.98$2,881,109
May 2022404,585109.378.43$3,411,881
Apr 2022442,133104.226.84$3,023,129
Mar 2022472,719108.885.08$2,399,711
Feb 2022456,20491.054.86$2,216,622
Jan 2022572,01981.844.54$2,595,639
Dec 2021669,65771.323.90$2,611,073
Nov 2021556,60877.435.24$2,914,873
Oct 2021199,06879.795.71$1,137,449

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas               45,089 Mcf  × $  3.05 =   $137,334

────────────────────────────────────────────────────
Month total                                 $137,334

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/292262 is the state's own key, not one this site invented.