Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the CARTHAGE (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 293257District 06Field 16032812CondensateGasSaveExport
Value, all time
$247 k
Jun 2022 – May 2026
Value, last 12 filed months
$149 k
at the published price for each month
Months reported
48
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 873 leases and 896 wells, and the rule below applies to all of them.

Discovered
1943-06-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-10-10.

The Commission's schedule remark for this field reads: (PETTIT, LOWER).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition529 bbl$41,319
GasProduction55,681 Mcf$206,096
Total$247,415

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2029, -94.2791. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.20291, -94.27909 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,649 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,649 ft.

Completions filed
May 2025
1 of 1 wells

1 well

42-3653148039,649 ftMay 2025

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (48)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

48 months

May 202612894106.413.05$4,000
Apr 2026101,33098.932.87$4,806
Mar 202661,65989.753.15$5,763
Feb 20261746663.503.75$2,827
Jan 202601,57059.138.00$12,557
Dec 202541,29056.664.41$5,920
Nov 202501,65258.593.93$6,486
Oct 2025111,77859.383.30$6,529
Sep 2025332,51762.743.08$9,815
Aug 2025604,06163.933.01$16,079
Jul 2025826,91066.743.32$28,381
Jun 20257913,06266.483.13$46,119
May 20251414,72260.553.23$48,434
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230576.533.39$17
Dec 20220276.415.73$11
Nov 20220685.005.65$34
Oct 202203287.185.86$188
Sep 20226030884.888.16$7,607
Aug 2022481,20094.529.13$15,490
Jul 2022931,794101.587.54$22,977
Jun 20220423115.097.98$3,374

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate            12 bbl  × $106.41 =     $1,277
Gas                  894 Mcf  × $  3.05 =     $2,723

────────────────────────────────────────────────────
Month total                                   $4,000

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/293257 is the state's own key, not one this site invented.