ICHABODS GAS UNIT

Operated by ADAMAS ENERGY LLC (P-5 103913) in the CARTHAGE (HAYNESVILLE SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 293721District 06Field 16032300GasSave
Value, all time
$37.2 M
Aug 2022 – May 2026
Value, last 12 filed months
$8.5 M
at the published price for each month
Months reported
46
no gaps in the span
Streams
1
gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction12,901,137 Mcf$37,203,533
Total$37,203,533

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3692, -94.3024. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.36916, -94.30240 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
14,973 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,973 ft.

Completions filed
Jun 2023
1 of 1 wells

1 well

42-405307571H14,973 ftJun 2023

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (46)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

46 months

May 2026128,784106.413.05$392,255
Apr 2026137,57798.932.87$394,807
Mar 2026156,94389.753.15$494,283
Feb 2026151,13063.503.75$566,786
Jan 2026166,45959.138.00$1,331,326
Dec 2025182,97056.664.41$807,512
Nov 2025193,86758.593.93$761,207
Oct 2025209,06059.383.30$690,910
Sep 2025225,97062.743.08$695,292
Aug 2025247,30163.933.01$745,553
Jul 2025262,28766.743.32$869,534
Jun 2025254,66166.483.13$796,763
May 2025289,17960.553.23$934,719
Apr 2025312,16662.363.54$1,106,042
Mar 2025341,29867.704.27$1,456,769
Feb 2025286,70470.884.34$1,244,536
Jan 2025335,66974.324.28$1,436,220
Dec 2024381,51568.993.12$1,190,849
Nov 2024327,23669.052.20$719,409
Oct 2024337,84971.372.28$770,769
Sep 2024373,94769.612.36$884,145
Aug 2024383,93875.632.06$792,306
Jul 2024237,12579.932.15$509,010
Jun 2024344,20678.082.63$906,632
May 2024402,12778.812.20$884,052
Apr 2024340,05584.451.66$564,219
Mar 2024536,26180.301.55$828,593
Feb 2024659,85176.091.78$1,176,937
Jan 2024715,40473.023.30$2,359,159
Dec 2023563,42471.262.61$1,470,942
Nov 2023686,69877.892.81$1,927,946
Oct 2023683,76185.443.09$2,110,962
Sep 2023599,16189.042.74$1,638,729
Aug 2023615,74080.522.67$1,645,799
Jul 2023579,63074.852.64$1,531,267
Jun 2023251,18468.962.26$567,294
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas              128,784 Mcf  × $  3.05 =   $392,255

────────────────────────────────────────────────────
Month total                                 $392,255

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/293721 is the state's own key, not one this site invented.