WERNER -G- GAS UNIT

Operated by CHEVRON U. S. A. INC. (P-5 148113) in the CARTHAGE (PETTIT, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 29847District 06Field 16032667NGPA filingGasSaveExport
Value, all time
$166 k
Jan 1993 – Apr 2004
Value, last 12 filed months
$25 k
at the published price for each month
Months reported
136
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 314 leases and 316 wells, and the rule below applies to all of them.

Discovered
1942-04-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
3,960 ft
minimum
From a lease line
1,320 ft
minimum

A drilling unit in this field needs at least 640 acres. The field rule took effect on 1989-12-01.

The Commission's schedule remark for this field reads: EFFECTIVE JUNE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction72,940 Mcf$165,621
Total$165,621

25,226 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1922, -94.1192. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.19218, -94.11916 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,260 ft
1 wells filed one
Completion to plug
16 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,260 ft.

Completions filed
Apr 2004
1 of 1 wells
Plug dates filed
Aug 2005
1 of 1 wells

Last completion to plug: a median of 16 months across the 1 well that filed both dates, with the middle half between 16 months and 16 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3650110616,260 ftApr 2004Aug 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (136)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

136 months

Apr 20042534.475.86$146
Mar 200445734.365.53$2,527
Feb 200416032.455.51$882
Jan 200420832.036.30$1,310
Dec 200319630.266.30$1,235
Nov 200339528.804.60$1,815
Oct 200351328.174.76$2,442
Sep 200351126.314.75$2,427
Aug 200362329.765.13$3,196
Jul 200354129.415.17$2,797
Jun 200353428.565.98$3,195
May 200352226.595.97$3,118
Apr 200353226.675.41$2,877
Mar 200355231.146.10$3,365
Feb 200346233.487.93$3,662
Jan 200344130.315.58$2,462
Dec 200248426.914.85$2,349
Nov 200249624.664.14$2,052
Oct 200252626.464.23$2,225
Sep 200259927.443.64$2,177
Aug 200251625.963.16$1,633
Jul 200254224.583.06$1,659
Jun 200254423.733.34$1,816
May 200234524.663.58$1,236
Apr 200252023.653.51$1,826
Mar 200253422.003.10$1,657
Feb 200248618.222.38$1,155
Jan 200254417.172.38$1,292
Dec 200160716.932.36$1,435
Nov 200147418.072.41$1,140
Oct 200161119.782.53$1,545
Sep 200164524.262.25$1,452
Aug 200154324.873.05$1,658
Jul 200167123.933.20$2,145
Jun 200154424.563.82$2,080
May 200150425.524.31$2,171
Apr 200150924.685.34$2,716
Mar 200155124.545.38$2,962
Feb 200153127.755.77$3,062
Jan 200155027.478.40$4,619
Dec 200058726.889.12$5,355
Nov 200062432.215.66$3,531
Oct 200058231.235.15$2,995
Sep 200062231.875.19$3,226
Aug 200038729.644.54$1,757
Jul 200046328.534.09$1,894
Jun 200047429.304.40$2,084
May 200060627.263.68$2,230
Apr 200061124.513.12$1,904
Mar 200067828.422.86$1,939
Feb 200062327.622.73$1,699
Jan 200064425.272.48$1,597
Dec 199961924.282.42$1,500
Nov 199965223.192.43$1,587
Oct 199968020.982.80$1,907
Sep 199957221.752.62$1,498
Aug 199964919.262.88$1,866
Jul 199972317.892.37$1,715
Jun 199981315.942.36$1,920
May 199978715.792.32$1,827
Apr 199973615.102.21$1,625
Mar 199974412.471.84$1,368
Feb 19995699.981.82$1,034
Jan 199956610.381.90$1,075
Dec 19985349.201.77$947
Nov 199855410.892.19$1,211
Oct 199861312.421.97$1,207
Sep 199859412.592.08$1,237
Aug 199852611.301.91$1,003
Jul 199853011.742.24$1,186
Jun 199855311.242.24$1,237
May 199861512.622.21$1,357
Apr 199862413.042.51$1,563
Mar 199852912.802.31$1,222
Feb 199852413.952.30$1,205
Jan 199864214.702.15$1,383
Dec 199757916.322.41$1,396
Nov 199749618.193.09$1,532
Oct 199756319.253.15$1,773
Sep 199746317.742.95$1,368
Aug 199754617.862.55$1,395
Jul 199754917.582.25$1,234
Jun 199738717.242.26$874
May 199761918.972.31$1,429
Apr 199756217.882.08$1,171
Mar 199749718.951.94$964
Feb 199749720.492.21$1,096
Jan 199755923.483.54$1,979
Dec 199651523.32$0
Nov 199643621.97$0
Oct 199655123.31$0
Sep 199664522.22$0
Aug 199661120.26$0
Jul 199667019.55$0
Jun 199658418.73$0
May 199663619.43$0
Apr 199649421.51$0
Mar 199645119.38$0
Feb 199622616.98$0
Jan 199639417.07$0
Dec 199535917.19$0
Nov 199539216.00$0
Oct 199535615.43$0
Sep 199536216.18$0
Aug 199542115.92$0
Jul 199539615.24$0
Jun 199543116.41$0
May 199543517.56$0
Apr 199539017.73$0
Mar 199546316.44$0
Feb 199548216.58$0
Jan 199555915.92$0
Dec 199459315.03$0
Nov 199446715.90$0
Oct 199446215.58$0
Sep 199451715.29$0
Aug 199444116.13$0
Jul 199457217.56$0
Jun 199453417.09$0
May 199458615.88$0
Apr 199435014.14$0
Mar 199456712.46$0
Feb 199458812.50$0
Jan 199476712.66$0
Dec 199367812.33$0
Nov 199364014.49$0
Oct 199369215.85$0
Sep 199348015.03$0
Aug 199361415.66$0
Jul 199354815.46$0
Jun 199359516.79$0
May 199369717.68$0
Apr 199371118.05$0
Mar 199375618.14$0
Feb 199345617.90$0
Jan 199365616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2004 — as filed, then multipliedworked
Gas                   25 Mcf  × $  5.86 =       $146

────────────────────────────────────────────────────
Month total                                     $146

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/29847 is the state's own key, not one this site invented.