FLANGAN, O. E.

Operated by PRINCESS THREE OPERATING, LLC (P-5 677993) in the MINDEN (TRAVIS PEAK CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 38151District 06Field 61792380NGPA filingCondensateGasSaveExport
Value, all time
$1.0 M
Jan 1993 – Jun 2018
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
306
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 304 leases and 325 wells, and the rule below applies to all of them.

Discovered
2006-03-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: EFF. 11-12-08. ALLOCATION FORMULA REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,969 bbl$284,267
GasProduction178,833 Mcf$754,375
Total$1,038,641

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1637, -94.7885. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.16373, -94.78849 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,604 ft
1 wells filed one
Completion to plug
51.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,604 ft.

Completions filed
Dec 1965
1 of 1 wells
Plug dates filed
Jul 2017
1 of 1 wells

Last completion to plug: a median of 51.6 years across the 1 well that filed both dates, with the middle half between 51.6 years and 51.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4010046317,604 ftDec 1965Jul 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (306)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

306 months

Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 2017131045.373.00$5,943
Jul 20170043.873.09$0
Jun 2017091142.493.09$2,813
May 201701,03645.373.26$3,381
Apr 201701,01147.933.21$3,247
Mar 201701,24046.772.98$3,700
Feb 201716276150.452.95$10,420
Jan 201701,10349.413.42$3,771
Dec 2016027848.763.72$1,035
Nov 2016033242.492.64$878
Oct 2016014746.193.09$454
Sep 201606041.553.10$186
Aug 201608341.442.92$243
Jul 2016020641.622.92$602
Jun 2016037345.352.69$1,002
May 2016050042.521.99$996
Apr 2016090736.561.99$1,806
Mar 2016082833.011.79$1,485
Feb 2016079726.472.06$1,645
Jan 2016085827.352.36$2,029
Dec 20151571,00232.362.00$7,086
Nov 20150038.792.17$0
Oct 2015083743.552.43$2,031
Sep 2015090842.992.76$2,505
Aug 2015062440.162.87$1,792
Jul 2015050648.152.95$1,490
Jun 2015095956.152.88$2,765
May 2015093955.212.96$2,775
Apr 20151687949.822.71$8,584
Mar 2015018142.892.93$531
Feb 2015083944.662.98$2,497
Jan 2015084743.433.10$2,626
Dec 2014066054.693.59$2,370
Nov 2014072570.464.25$3,083
Oct 2014075078.303.90$2,926
Sep 2014098586.164.05$3,985
Aug 2014098289.394.04$3,962
Jul 20141661,09396.564.18$20,597
Jun 2014073098.164.74$3,458
May 2014078494.734.73$3,706
Apr 2014091195.944.81$4,381
Mar 2014087195.895.06$4,404
Feb 2014050597.406.19$3,127
Jan 2014090790.404.86$4,409
Dec 2013066691.824.35$2,900
Nov 2013049988.853.74$1,865
Oct 2013038697.423.78$1,459
Sep 20130396104.113.72$1,472
Aug 201300104.253.52$0
Jul 201305102.523.72$19
Jun 2013039694.403.93$1,558
May 2013032994.834.15$1,365
Apr 2013035993.964.28$1,537
Mar 2013043893.623.91$1,714
Feb 2013034991.233.42$1,194
Jan 201316626391.603.42$16,105
Dec 2012029686.773.42$1,012
Nov 2012032186.953.62$1,164
Oct 2012037789.383.40$1,282
Sep 2012038394.672.92$1,118
Aug 2012033892.662.91$983
Jul 201205485.133.02$163
Jun 2012034979.822.52$879
May 2012011191.612.49$276
Apr 201200101.652.00$0
Mar 20120268105.052.22$596
Feb 20120332101.102.57$853
Jan 2012025898.092.73$705
Dec 2011034996.873.24$1,131
Nov 2011053295.723.31$1,762
Oct 2011054484.983.65$1,985
Sep 201116348983.623.99$15,579
Aug 2011066883.404.15$2,772
Jul 2011053594.144.52$2,417
Jun 2011052492.904.64$2,431
May 2011055698.134.40$2,449
Apr 2011026105.964.33$113
Mar 2011027696.364.06$1,120
Feb 2011044385.644.18$1,852
Jan 2011044586.504.59$2,042
Dec 2010053085.734.35$2,304
Nov 2010059080.843.80$2,239
Oct 201016941878.103.51$14,666
Sep 2010061172.633.98$2,431
Aug 2010062573.684.42$2,762
Jul 201016456972.554.74$14,593
Jun 2010054570.364.91$2,676
May 2010056571.124.24$2,393
Apr 2010072181.694.12$2,972
Mar 201016846878.394.39$15,223
Feb 201007973.585.44$430
Jan 201005274.365.96$310
Dec 2009021271.445.48$1,163
Nov 2009035074.593.75$1,313
Oct 2009040572.544.11$1,665
Sep 2009040765.543.06$1,247
Aug 2009049267.423.22$1,584
Jul 2009049361.133.46$1,708
Jun 2009038966.163.90$1,515
May 2009051954.743.93$2,037
Apr 2009033146.773.59$1,187
Mar 2009045342.144.06$1,839
Feb 200917032432.814.63$7,079
Jan 2009034835.865.37$1,869
Dec 2008043737.105.98$2,612
Nov 2008020155.496.86$1,379
Oct 200804475.246.92$305
Sep 20080129101.767.88$1,016
Aug 20080263114.228.48$2,231
Jul 20080462131.0811.39$5,262
Jun 2008178689131.3313.03$32,356
May 20080304123.1711.57$3,519
Apr 20080347110.3110.45$3,628
Mar 20080411101.909.66$3,972
Feb 2008030492.538.77$2,666
Jan 2008037390.388.21$3,061
Dec 2007024388.337.30$1,774
Nov 2007024091.677.29$1,750
Oct 200715623882.856.92$14,572
Sep 2007019575.846.24$1,218
Aug 2007053369.066.39$3,405
Jul 2007068070.906.39$4,344
Jun 2007036062.007.55$2,717
May 200718877358.747.85$17,108
Apr 2007078259.617.81$6,104
Mar 2007054656.927.30$3,987
Feb 2007064055.108.22$5,258
Jan 2007098950.306.73$6,653
Dec 2006027656.656.92$1,909
Nov 2006026054.207.62$1,981
Oct 2006027354.906.01$1,642
Sep 2006181060.085.04$10,874
Aug 2006061968.717.34$4,543
Jul 200601,12269.376.34$7,117
Jun 2006051266.286.38$3,269
May 2006076766.016.42$4,928
Apr 2006090664.397.36$6,669
Mar 200617394956.707.08$16,531
Feb 2006070557.597.75$5,465
Jan 2006058160.598.93$5,190
Dec 2005071854.9413.42$9,632
Nov 2005065554.6910.59$6,935
Oct 200516181458.3413.80$20,622
Sep 2005047861.4512.08$5,774
Aug 200517480361.519.80$18,570
Jul 2005070555.697.84$5,530
Jun 2005060352.337.38$4,451
May 200501,03845.226.65$6,904
Apr 200517679549.207.36$14,511
Mar 2005054750.377.15$3,914
Feb 2005060345.226.31$3,806
Jan 2005080643.166.32$5,096
Dec 2004048639.866.75$3,281
Nov 200417920445.286.33$9,397
Oct 2004076649.706.52$4,991
Sep 2004079943.245.28$4,222
Aug 200408942.375.55$494
Jul 2004047538.286.08$2,890
Jun 2004047936.106.43$3,081
May 2004064937.486.49$4,215
Apr 2004063734.475.86$3,732
Mar 200410830134.365.53$5,375
Feb 2004033832.455.51$1,862
Jan 2004053432.036.30$3,364
Dec 2003059030.266.30$3,718
Nov 200314850328.804.60$6,574
Oct 2003051728.174.76$2,461
Sep 200316573426.314.75$7,827
Aug 2003055729.765.13$2,857
Jul 2003065129.415.17$3,366
Jun 2003043928.565.98$2,627
May 2003051526.595.97$3,076
Apr 200318260426.675.41$8,120
Mar 2003051931.146.10$3,164
Feb 2003053133.487.93$4,209
Jan 200317568130.315.58$9,106
Dec 2002062526.914.85$3,034
Nov 2002032624.664.14$1,349
Oct 2002044826.464.23$1,895
Sep 2002065827.443.64$2,392
Aug 2002078725.963.16$2,490
Jul 200216575724.583.06$6,373
Jun 2002083423.733.34$2,784
May 2002079724.663.58$2,856
Apr 2002094523.653.51$3,319
Mar 200217685222.003.10$6,516
Feb 2002067918.222.38$1,613
Jan 2002067017.172.38$1,592
Dec 200117779816.932.36$4,883
Nov 2001067918.072.41$1,633
Oct 20010019.782.53$0
Sep 2001096124.262.25$2,164
Aug 200101,17524.873.05$3,587
Jul 200101,40223.933.20$4,482
Jun 200101,28024.563.82$4,895
May 200102,23825.524.31$9,640
Apr 200101,22724.685.34$6,546
Mar 200101,62024.545.38$8,710
Feb 20011641,58427.755.77$13,686
Jan 200102,00027.478.40$16,798
Dec 200001,62126.889.12$14,788
Nov 20001531,41132.215.66$12,912
Oct 200001,98031.235.15$10,188
Sep 2000097231.875.19$5,041
Aug 200017394029.644.54$9,396
Jul 200001,62028.534.09$6,625
Jun 200002,11129.304.40$9,283
May 200001,56227.263.68$5,748
Apr 20001301,83124.513.12$8,892
Mar 200001,41128.422.86$4,035
Feb 2000090027.622.73$2,454
Jan 200001,40225.272.48$3,478
Dec 19991601,40924.282.42$7,300
Nov 199901,26023.192.43$3,067
Oct 199902,10220.982.80$5,893
Sep 199902,21121.752.62$5,790
Aug 19991822,08819.262.88$9,510
Jul 199901,84717.892.37$4,382
Jun 199901,75015.942.36$4,134
May 199901,93215.792.32$4,484
Apr 199902,21015.102.21$4,880
Mar 19991812,34712.471.84$6,572
Feb 199901,5979.981.82$2,903
Jan 199901,41110.381.90$2,681
Dec 199802,3509.201.77$4,167
Nov 199802,21010.892.19$4,830
Oct 199802,24812.421.97$4,427
Sep 19981802,07112.592.08$6,579
Aug 199802,11011.301.91$4,025
Jul 199802,16011.742.24$4,833
Jun 199802,29011.242.24$5,123
May 199802,34012.622.21$5,163
Apr 199802,08813.042.51$5,231
Mar 199803,13812.802.31$7,247
Feb 199801,25513.952.30$2,885
Jan 1998087914.702.15$1,894
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 19940012.66$0
Dec 19930012.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 19930015.03$0
Aug 19930015.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 19930017.68$0
Apr 19930018.05$0
Mar 19930018.14$0
Feb 19930017.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2017 — as filed, then multipliedworked
Condensate           131 bbl  × $ 45.37 =     $5,943
Gas                    0 Mcf  × $  3.00 =         $0

────────────────────────────────────────────────────
Month total                                   $5,943

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/38151 is the state's own key, not one this site invented.