CATES

Operated by STROUD PETROLEUM, INC. (P-5 828082) in the SCOOBER CREEK (RODESSA-HILL) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 58297District 06Field 81706500CondensateGasSaveExport
Value, all time
$995 k
Jan 1993 – Nov 2025
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
395
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 42 leases and 42 wells, and the rule below applies to all of them.

Discovered
1972-03-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 320 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,450 bbl$82,323
GasProduction332,596 Mcf$912,527
Total$994,850

136,675 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0183, -94.8667. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.01831, -94.86672 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,070 ft
1 wells filed one
Completion to plug
51.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,070 ft.

Completions filed
Apr 1974
1 of 1 wells
Plug dates filed
Nov 2025
1 of 1 wells

Last completion to plug: a median of 51.6 years across the 1 well that filed both dates, with the middle half between 51.6 years and 51.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4013017518,070 ftApr 1974Nov 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (395)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

395 months

Nov 20250058.593.93$0
Oct 202547059.383.30$2,791
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240178.812.20$2
Apr 20240184.451.66$2
Mar 20240180.301.55$2
Feb 20240176.091.78$2
Jan 20240173.023.30$3
Dec 20230171.262.61$3
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 20230189.042.74$3
Aug 20230180.522.67$3
Jul 20230174.852.64$3
Jun 20230268.962.26$5
May 20230270.622.23$4
Apr 20230278.122.24$4
Mar 20230172.852.39$2
Feb 20230175.112.47$2
Jan 20230276.533.39$7
Dec 20220176.415.73$6
Nov 20220185.005.65$6
Oct 20220287.185.86$12
Sep 20220384.888.16$24
Aug 20220094.529.13$0
Jul 202203101.587.54$23
Jun 202202115.097.98$16
May 202204109.378.43$34
Apr 202202104.226.84$14
Mar 202200108.885.08$0
Feb 20220191.054.86$5
Jan 20220681.844.54$27
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210466.024.22$17
Jul 20210370.783.98$12
Jun 20210569.493.38$17
May 20210363.483.02$9
Apr 20210360.362.76$8
Mar 20210561.302.72$14
Feb 20210457.805.55$22
Jan 20210350.412.81$8
Dec 20200544.642.68$13
Nov 20200538.772.71$14
Oct 202001036.972.48$25
Sep 20200337.091.99$6
Aug 202001539.982.39$36
Jul 202002838.371.83$51
Jun 20200434.901.69$7
May 20200816.921.81$15
Apr 20200914.751.80$16
Mar 20200230.341.86$4
Feb 202003349.881.98$65
Jan 202002557.252.09$52
Dec 201902159.012.30$48
Nov 201902155.302.75$58
Oct 201904653.472.42$111
Sep 201903155.052.66$82
Aug 201901253.112.30$28
Jul 201903656.272.46$89
Jun 201901952.782.49$47
May 201903058.482.74$82
Apr 201903462.632.75$94
Mar 201901856.803.06$55
Feb 201902950.852.79$81
Jan 201906046.033.23$194
Dec 201802046.594.19$84
Nov 201804152.934.24$174
Oct 20180961.443.40$31
Sep 201802559.543.11$78
Aug 201803259.403.07$98
Jul 201802965.142.93$85
Jun 201806260.183.08$191
May 201802765.382.90$78
Apr 201802763.842.90$78
Mar 20180861.222.79$22
Feb 201802661.782.77$72
Jan 201804162.874.01$164
Dec 201704257.272.92$123
Nov 201705655.423.12$175
Oct 201704149.292.98$122
Sep 201705847.523.09$179
Aug 201702145.373.00$63
Jul 201702843.873.09$86
Jun 201704242.493.09$130
May 201701445.373.26$46
Apr 201703647.933.21$116
Mar 201702146.772.98$63
Feb 201701350.452.95$38
Jan 201706649.413.42$226
Dec 2016013548.763.72$503
Nov 201601,17542.492.64$3,107
Oct 2016011146.193.09$343
Sep 20160941.553.10$28
Aug 201606841.442.92$199
Jul 201602441.622.92$70
Jun 2016018145.352.69$486
May 2016011742.521.99$233
Apr 2016019036.561.99$378
Mar 2016033533.011.79$601
Feb 201603326.472.06$68
Jan 201605627.352.36$132
Dec 201503732.362.00$74
Nov 201505838.792.17$126
Oct 201502343.552.43$56
Sep 201502842.992.76$77
Aug 201501240.162.87$34
Jul 201506948.152.95$203
Jun 201507556.152.88$216
May 201501255.212.96$35
Apr 2015018549.822.71$501
Mar 2015014142.892.93$414
Feb 2015012744.662.98$378
Jan 2015016043.433.10$496
Dec 2014038754.693.59$1,390
Nov 2014048570.464.25$2,062
Oct 2014059478.303.90$2,317
Sep 2014062986.164.05$2,545
Aug 201406589.394.04$262
Jul 20149162596.564.18$11,399
Jun 2014067498.164.74$3,193
May 2014058494.734.73$2,760
Apr 2014030095.944.81$1,443
Mar 2014032195.895.06$1,623
Feb 2014033097.406.19$2,043
Jan 2014043090.404.86$2,090
Dec 2013028691.824.35$1,245
Nov 2013012688.853.74$471
Oct 201307597.423.78$283
Sep 2013013104.113.72$48
Aug 2013092104.253.52$324
Jul 20130147102.523.72$547
Jun 201303194.403.93$122
May 201306594.834.15$270
Apr 201302393.964.28$99
Mar 2013064393.623.91$2,516
Feb 2013016891.233.42$575
Jan 2013021191.603.42$722
Dec 2012013386.773.42$455
Nov 2012015086.953.62$544
Oct 2012090489.383.40$3,073
Sep 2012021194.672.92$616
Aug 2012015292.662.91$442
Jul 2012024985.133.02$752
Jun 2012020179.822.52$506
May 2012029191.612.49$724
Apr 20120273101.652.00$545
Mar 20120314105.052.22$698
Feb 20120308101.102.57$792
Jan 2012038698.092.73$1,055
Dec 201101,45596.873.24$4,714
Nov 2011025595.723.31$844
Oct 2011028984.983.65$1,054
Sep 201103983.623.99$155
Aug 2011041283.404.15$1,710
Jul 2011068994.144.52$3,112
Jun 2011082292.904.64$3,814
May 2011082798.134.40$3,643
Apr 20110613105.964.33$2,656
Mar 2011067396.364.06$2,731
Feb 2011039085.644.18$1,630
Jan 2011051886.504.59$2,377
Dec 2010050285.734.35$2,183
Nov 201011439480.843.80$10,711
Oct 2010050678.103.51$1,776
Sep 2010039572.633.98$1,572
Aug 2010044973.684.42$1,984
Jul 2010078172.554.74$3,699
Jun 2010082770.364.91$4,061
May 201008771.124.24$368
Apr 2010027781.694.12$1,142
Mar 2010050878.394.39$2,229
Feb 2010067173.585.44$3,652
Jan 2010017474.365.96$1,038
Dec 2009052971.445.48$2,901
Nov 2009053074.593.75$1,988
Oct 2009053972.544.11$2,215
Sep 2009050565.543.06$1,548
Aug 2009053267.423.22$1,712
Jul 2009076561.133.46$2,650
Jun 2009059866.163.90$2,329
May 2009084754.743.93$3,325
Apr 200918774846.773.59$11,429
Mar 2009055142.144.06$2,237
Feb 2009068432.814.63$3,169
Jan 2009069535.865.37$3,733
Dec 2008076037.105.98$4,543
Nov 2008066455.496.86$4,555
Oct 2008064375.246.92$4,451
Sep 20080562101.767.88$4,427
Aug 20080541114.228.48$4,589
Jul 20080700131.0811.39$7,973
Jun 20080665131.3313.03$8,667
May 20080676123.1711.57$7,824
Apr 20080724110.3110.45$7,569
Mar 20080688101.909.66$6,649
Feb 2008070292.538.77$6,157
Jan 2008078990.388.21$6,474
Dec 2007079988.337.30$5,834
Nov 2007087891.677.29$6,402
Oct 200701,02682.856.92$7,102
Sep 2007066175.846.24$4,127
Aug 2007068569.066.39$4,376
Jul 2007079170.906.39$5,053
Jun 2007080962.007.55$6,107
May 2007089258.747.85$6,999
Apr 2007077459.617.81$6,041
Mar 2007074656.927.30$5,447
Feb 2007084355.108.22$6,926
Jan 200720785250.306.73$16,143
Dec 2006091956.656.92$6,358
Nov 2006090354.207.62$6,879
Oct 200601,02354.906.01$6,152
Sep 200601,03860.085.04$5,229
Aug 200601,18368.717.34$8,683
Jul 2006069569.376.34$4,408
Jun 2006088966.286.38$5,675
May 2006096066.016.42$6,168
Apr 2006073164.397.36$5,381
Mar 2006086856.707.08$6,148
Feb 2006088457.597.75$6,852
Jan 200601,15560.598.93$10,318
Dec 2005062054.9413.42$8,318
Nov 2005092454.6910.59$9,784
Oct 200501,08958.3413.80$15,024
Sep 200501,25561.4512.08$15,159
Aug 20051811,26561.519.80$23,526
Jul 200502,26955.697.84$17,797
Jun 2005045252.337.38$3,336
May 200501,00145.226.65$6,658
Apr 2005052849.207.36$3,886
Mar 200502950.377.15$207
Feb 2005092945.226.31$5,864
Jan 200502743.166.32$171
Dec 2004090439.866.75$6,103
Nov 2004078445.286.33$4,963
Oct 200401,07149.706.52$6,978
Sep 2004010043.245.28$528
Aug 2004055342.375.55$3,070
Jul 200405038.286.08$304
Jun 200407736.106.43$495
May 2004098637.486.49$6,404
Apr 2004087434.475.86$5,120
Mar 2004056134.365.53$3,102
Feb 200401,24232.455.51$6,843
Jan 200401,00832.036.30$6,350
Dec 200301,67930.266.30$10,580
Nov 2003034928.804.60$1,604
Oct 2003082428.174.76$3,922
Sep 200301,12126.314.75$5,324
Aug 200301,16829.765.13$5,992
Jul 200301,03929.415.17$5,373
Jun 200301,11628.565.98$6,677
May 200301,27226.595.97$7,597
Apr 200301,18426.675.41$6,402
Mar 200301,26531.146.10$7,711
Feb 200301,16233.487.93$9,210
Jan 200301,33130.315.58$7,430
Dec 200201,36026.914.85$6,601
Nov 200201,13524.664.14$4,695
Oct 200201,46526.464.23$6,196
Sep 200201,15827.443.64$4,210
Aug 200203,51525.963.16$11,122
Jul 200201,49624.583.06$4,580
Jun 200201,38723.733.34$4,630
May 200201,50224.663.58$5,383
Apr 200201,25323.653.51$4,401
Mar 200201,44922.003.10$4,496
Feb 2002055618.222.38$1,321
Jan 200201,25217.172.38$2,974
Dec 200101,29916.932.36$3,071
Nov 200101,13418.072.41$2,728
Oct 20011911,31119.782.53$7,093
Sep 200101,27724.262.25$2,875
Aug 200101,35524.873.05$4,137
Jul 200101,24323.933.20$3,974
Jun 200101,30124.563.82$4,975
May 200101,21425.524.31$5,229
Apr 2001094024.685.34$5,015
Mar 200101,43424.545.38$7,710
Feb 200101,30627.755.77$7,532
Jan 200101,47327.478.40$12,371
Dec 200001,50726.889.12$13,748
Nov 200001,53332.215.66$8,674
Oct 20001861,64831.235.15$14,289
Sep 200001,72531.875.19$8,947
Aug 200001,80229.644.54$8,182
Jul 200001,85528.534.09$7,586
Jun 200001,47929.304.40$6,504
May 200001,22127.263.68$4,493
Apr 200001,25224.513.12$3,901
Mar 200001,74728.422.86$4,996
Feb 200002,43427.622.73$6,636
Jan 200002,76625.272.48$6,861
Dec 199902,81824.282.42$6,830
Nov 199903,00523.192.43$7,314
Oct 199903,65320.982.80$10,242
Sep 199902,62921.752.62$6,885
Aug 199907219.262.88$207
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 199903415.792.32$79
Apr 199907715.102.21$170
Mar 1999012812.471.84$235
Feb 199901589.981.82$287
Jan 1999019110.381.90$363
Dec 199802839.201.77$502
Nov 1998026310.892.19$575
Oct 1998025212.421.97$496
Sep 1998062512.592.08$1,302
Aug 1998069311.301.91$1,322
Jul 1998031611.742.24$707
Jun 1998044511.242.24$996
May 1998071012.622.21$1,567
Apr 1998078113.042.51$1,957
Mar 1998027212.802.31$628
Feb 199801,75513.952.30$4,035
Jan 199802,40114.702.15$5,174
Dec 199701,20216.322.41$2,898
Nov 199702,12918.193.09$6,575
Oct 19971932,18519.253.15$10,598
Sep 1997091317.742.95$2,698
Aug 199702,14017.862.55$5,467
Jul 199702,13017.582.25$4,786
Jun 199702,11817.242.26$4,781
May 199702,21118.972.31$5,104
Apr 199702,20317.882.08$4,588
Mar 199702,31518.951.94$4,489
Feb 199701,86920.492.21$4,123
Jan 199702,25123.483.54$7,968
Dec 199602,38823.32$0
Nov 199601,62921.97$0
Oct 19961822,35923.31$4,242
Sep 199602,48422.22$0
Aug 199601,64420.26$0
Jul 199601,17919.55$0
Jun 1996091918.73$0
May 199602,22319.43$0
Apr 199602,67721.51$0
Mar 199602,38719.38$0
Feb 199602,88316.98$0
Jan 199603,40217.07$0
Dec 199502,93217.19$0
Nov 199503,54016.00$0
Oct 199502,26315.43$0
Sep 1995098916.18$0
Aug 199501,10115.92$0
Jul 199501,36415.24$0
Jun 199501,18416.41$0
May 199501,64517.56$0
Apr 19951712,53517.73$3,032
Mar 199503,49716.44$0
Feb 199503,35216.58$0
Jan 199503,83215.92$0
Dec 199403,43615.03$0
Nov 199403,79815.90$0
Oct 199408015.58$0
Sep 199403,10615.29$0
Aug 19941803,10316.13$2,903
Jul 199403,12117.56$0
Jun 199403,11117.09$0
May 199403,26815.88$0
Apr 199403,33914.14$0
Mar 199403,61012.46$0
Feb 19941903,22312.50$2,375
Jan 199404,04912.66$0
Dec 199302,63912.33$0
Nov 199303,75314.49$0
Oct 199304,90915.85$0
Sep 199304,33715.03$0
Aug 19931603,37015.66$2,506
Jul 199304,36915.46$0
Jun 199302,64816.79$0
May 199302,66817.68$0
Apr 199303,12618.05$0
Mar 199303,43618.14$0
Feb 199304,28017.90$0
Jan 19931705,48816.93$2,878

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2025 — as filed, then multipliedworked
Condensate            47 bbl  × $ 59.38 =     $2,791
Gas                    0 Mcf  × $  3.30 =         $0

────────────────────────────────────────────────────
Month total                                   $2,791

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/58297 is the state's own key, not one this site invented.