Value, all time
$1.3 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 264 leases and 264 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2010-12-14.

The Commission's schedule remark for this field reads: DENSITY HAVE BEEN ASSIGNED, CORRELATIVE INTERVAL 8112-9435 FT.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,106 bbl$70,113
GasProduction469,195 Mcf$1,233,625
Total$1,303,737

175,898 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2873, -94.0940. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.28726, -94.09405 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,980 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,980 ft.

Completions filed
Sep 1977
1 of 1 wells

1 well

42-3653057828,980 ftSep 1977

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020047834.901.69$808
May 2020052816.921.81$958
Apr 2020054214.751.80$978
Mar 2020057730.341.86$1,071
Feb 2020054449.881.98$1,077
Jan 2020060757.252.09$1,272
Dec 2019058659.012.30$1,350
Nov 2019091255.302.75$2,509
Oct 2019058053.472.42$1,403
Sep 2019054055.052.66$1,435
Aug 2019053553.112.30$1,233
Jul 2019047156.272.46$1,159
Jun 2019048352.782.49$1,203
May 2019059458.482.74$1,628
Apr 2019062762.632.75$1,725
Mar 2019054956.803.06$1,681
Feb 2019029550.852.79$824
Jan 2019058346.033.23$1,882
Dec 2018061846.594.19$2,587
Nov 2018075352.934.24$3,191
Oct 2018085561.443.40$2,905
Sep 2018074959.543.11$2,328
Aug 2018078159.403.07$2,395
Jul 2018085165.142.93$2,495
Jun 2018066860.183.08$2,055
May 2018061265.382.90$1,775
Apr 2018063363.842.90$1,836
Mar 2018058361.222.79$1,625
Feb 2018046261.782.77$1,278
Jan 2018069762.874.01$2,795
Dec 2017074157.272.92$2,165
Nov 2017062355.423.12$1,943
Oct 2017062149.292.98$1,853
Sep 2017060847.523.09$1,877
Aug 2017061645.373.00$1,851
Jul 2017058743.873.09$1,812
Jun 2017051842.493.09$1,599
May 2017050245.373.26$1,638
Apr 2017047747.933.21$1,532
Mar 2017053446.772.98$1,593
Feb 2017049450.452.95$1,459
Jan 2017061649.413.42$2,106
Dec 2016068448.763.72$2,546
Nov 2016064842.492.64$1,714
Oct 2016063446.193.09$1,959
Sep 2016069241.553.10$2,146
Aug 2016065441.442.92$1,913
Jul 2016060141.622.92$1,758
Jun 2016048245.352.69$1,295
May 2016055442.521.99$1,103
Apr 2016051136.561.99$1,017
Mar 2016054033.011.79$969
Feb 2016051726.472.06$1,067
Jan 2016061727.352.36$1,459
Dec 2015064732.362.00$1,295
Nov 2015059438.792.17$1,287
Oct 2015062343.552.43$1,512
Sep 2015053842.992.76$1,484
Aug 2015056940.162.87$1,634
Jul 2015066948.152.95$1,970
Jun 2015072256.152.88$2,081
May 2015073555.212.96$2,172
Apr 2015067849.822.71$1,835
Mar 2015063542.892.93$1,864
Feb 2015057644.662.98$1,714
Jan 2015064743.433.10$2,006
Dec 2014068554.693.59$2,460
Nov 2014052070.464.25$2,211
Oct 2014061878.303.90$2,411
Sep 2014060086.164.05$2,427
Aug 2014070189.394.04$2,829
Jul 2014070596.564.18$2,947
Jun 2014076398.164.74$3,614
May 2014077994.734.73$3,682
Apr 2014071595.944.81$3,439
Mar 2014066995.895.06$3,383
Feb 2014059197.406.19$3,659
Jan 2014071590.404.86$3,475
Dec 2013071391.824.35$3,105
Nov 2013066488.853.74$2,482
Oct 2013076497.423.78$2,887
Sep 20130770104.113.72$2,863
Aug 20130816104.253.52$2,874
Jul 20130792102.523.72$2,944
Jun 2013078194.403.93$3,072
May 2013077294.834.15$3,203
Apr 2013067693.964.28$2,895
Mar 2013047593.623.91$1,859
Feb 2013067291.233.42$2,298
Jan 2013081491.603.42$2,784
Dec 2012078286.773.42$2,675
Nov 2012077986.953.62$2,824
Oct 2012043489.383.40$1,475
Sep 2012076694.672.92$2,235
Aug 2012095292.662.91$2,769
Jul 2012085285.133.02$2,574
Jun 2012076979.822.52$1,937
May 2012081891.612.49$2,035
Apr 20120718101.652.00$1,434
Mar 20121729105.052.22$1,725
Feb 20120716101.102.57$1,840
Jan 2012577098.092.73$2,596
Dec 2011081596.873.24$2,640
Nov 20112077795.723.31$4,487
Oct 2011090284.983.65$3,291
Sep 2011090183.623.99$3,591
Aug 20113981383.404.15$6,626
Jul 2011080394.144.52$3,627
Jun 2011084392.904.64$3,911
May 20118492398.134.40$12,309
Apr 20110943105.964.33$4,086
Mar 20117592996.364.06$10,996
Feb 2011081085.644.18$3,386
Jan 20116695786.504.59$10,100
Dec 2010086985.734.35$3,778
Nov 2010791580.843.80$4,039
Oct 2010090878.103.51$3,186
Sep 2010098772.633.98$3,928
Aug 2010441,11473.684.42$8,165
Jul 201001,03072.554.74$4,879
Jun 2010093870.364.91$4,606
May 2010099771.124.24$4,223
Apr 201001,00481.694.12$4,139
Mar 20101896978.394.39$5,664
Feb 2010080273.585.44$4,365
Jan 2010079774.365.96$4,753
Dec 2009085371.445.48$4,678
Nov 2009085674.593.75$3,211
Oct 2009084872.544.11$3,485
Sep 20093784965.543.06$5,027
Aug 2009097167.423.22$3,125
Jul 2009092461.133.46$3,201
Jun 2009053766.163.90$2,092
May 2009081454.743.93$3,196
Apr 2009079446.773.59$2,848
Mar 2009094142.144.06$3,820
Feb 2009086732.814.63$4,017
Jan 2009096035.865.37$5,156
Dec 2008097337.105.98$5,816
Nov 200801,02155.496.86$7,004
Oct 2008089675.246.92$6,202
Sep 20080939101.767.88$7,397
Aug 200825876114.228.48$10,287
Jul 20080843131.0811.39$9,601
Jun 20080818131.3313.03$10,661
May 20080780123.1711.57$9,028
Apr 20080786110.3110.45$8,218
Mar 200824920101.909.66$11,337
Feb 2008081892.538.77$7,174
Jan 2008063690.388.21$5,219
Dec 20072567788.337.30$7,152
Nov 2007071191.677.29$5,184
Oct 2007074982.856.92$5,185
Sep 20072170975.846.24$6,020
Aug 2007069469.066.39$4,433
Jul 2007069470.906.39$4,433
Jun 2007070462.007.55$5,314
May 20072076158.747.85$7,146
Apr 2007071959.617.81$5,612
Mar 2007074256.927.30$5,418
Feb 20073661255.108.22$7,012
Jan 20073060250.306.73$5,559
Dec 2006073456.656.92$5,078
Nov 2006073654.207.62$5,606
Oct 2006077154.906.01$4,637
Sep 20062779360.085.04$5,617
Aug 2006091368.717.34$6,701
Jul 2006098469.376.34$6,241
Jun 2006351,01966.286.38$8,825
May 2006089466.016.42$5,744
Apr 2006075364.397.36$5,542
Mar 2006531,00956.707.08$10,152
Feb 200601,01957.597.75$7,898
Jan 2006521,06160.598.93$12,629
Dec 200501,11054.9413.42$14,891
Nov 2005451,08354.6910.59$13,928
Oct 200501,19358.3413.80$16,458
Sep 2005098861.4512.08$11,934
Aug 200501,09161.519.80$10,688
Jul 2005431,07855.697.84$10,850
Jun 20054184052.337.38$8,346
May 2005079345.226.65$5,274
Apr 2005085649.207.36$6,301
Mar 2005299350.377.15$7,206
Feb 200501,05345.226.31$6,646
Jan 200501,19743.166.32$7,568
Dec 200401,27539.866.75$8,608
Nov 200401,36845.286.33$8,660
Oct 200401,26049.706.52$8,209
Sep 200401,27443.245.28$6,732
Aug 200401,41742.375.55$7,865
Jul 200401,27238.286.08$7,739
Jun 200401,24136.106.43$7,983
May 200401,26137.486.49$8,190
Apr 200401,17334.475.86$6,872
Mar 200401,28634.365.53$7,112
Feb 200401,45232.455.51$8,000
Jan 200431,29832.036.30$8,273
Dec 200301,25730.266.30$7,921
Nov 200301,23728.804.60$5,684
Oct 200301,30928.174.76$6,230
Sep 200301,25626.314.75$5,965
Aug 200301,26429.765.13$6,484
Jul 200301,22429.415.17$6,329
Jun 200301,19628.565.98$7,156
May 200301,27826.595.97$7,633
Apr 200301,23026.675.41$6,651
Mar 200301,42431.146.10$8,681
Feb 200301,18033.487.93$9,353
Jan 200301,31630.315.58$7,346
Dec 200201,46926.914.85$7,130
Nov 200291,22624.664.14$5,294
Oct 200201,45226.464.23$6,141
Sep 200211,56827.443.64$5,727
Aug 200201,48025.963.16$4,683
Jul 200201,45124.583.06$4,443
Jun 200201,33923.733.34$4,470
May 200211,39324.663.58$5,017
Apr 200201,29223.653.51$4,538
Mar 200261,26522.003.10$4,057
Feb 200221,16418.222.38$2,802
Jan 200201,34817.172.38$3,202
Dec 200101,35116.932.36$3,194
Nov 200101,25018.072.41$3,007
Oct 200111,19719.782.53$3,047
Sep 200111,24924.262.25$2,836
Aug 200111,31824.873.05$4,049
Jul 200161,33523.933.20$4,412
Jun 200111,25124.563.82$4,809
May 200131,33225.524.31$5,814
Apr 200111,32224.685.34$7,078
Mar 200101,40324.545.38$7,543
Feb 200101,23227.755.77$7,105
Jan 200101,43527.478.40$12,052
Dec 200001,37926.889.12$12,580
Nov 200001,64432.215.66$9,302
Oct 200001,71131.235.15$8,804
Sep 200001,55831.875.19$8,081
Aug 200001,59329.644.54$7,233
Jul 2000531,62328.534.09$8,150
Jun 2000063229.304.40$2,779
May 2000077627.263.68$2,855
Apr 200001,44024.513.12$4,487
Mar 200001,51728.422.86$4,338
Feb 200001,37327.622.73$3,743
Jan 200001,68525.272.48$4,180
Dec 199901,78024.282.42$4,314
Nov 199901,78623.192.43$4,347
Oct 199901,88920.982.80$5,296
Sep 199901,83621.752.62$4,808
Aug 199901,91019.262.88$5,492
Jul 199901,87117.892.37$4,439
Jun 199901,76215.942.36$4,162
May 199901,80815.792.32$4,196
Apr 199901,99215.102.21$4,398
Mar 199902,05812.471.84$3,783
Feb 199901,8079.981.82$3,285
Jan 1999521,99610.381.90$4,332
Dec 199802,0419.201.77$3,619
Nov 199801,97910.892.19$4,326
Oct 199802,02112.421.97$3,980
Sep 199802,05712.592.08$4,284
Aug 199802,08511.301.91$3,977
Jul 199801,97811.742.24$4,425
Jun 199801,92711.242.24$4,311
May 199801,92612.622.21$4,249
Apr 199801,75513.042.51$4,397
Mar 199801,94312.802.31$4,487
Feb 199801,82013.952.30$4,184
Jan 199802,05814.702.15$4,435
Dec 199702,28316.322.41$5,505
Nov 199702,11718.193.09$6,538
Oct 199702,24719.253.15$7,078
Sep 199702,16717.742.95$6,403
Aug 199702,27217.862.55$5,804
Jul 199702,28717.582.25$5,139
Jun 199702,41717.242.26$5,456
May 199702,52918.972.31$5,838
Apr 1997122,33517.882.08$5,078
Mar 199702,42818.951.94$4,708
Feb 199702,31020.492.21$5,096
Jan 199702,56623.483.54$9,083
Dec 199602,52123.32$0
Nov 199602,53521.97$0
Oct 199603,05823.31$0
Sep 199603,09322.22$0
Aug 199603,28820.26$0
Jul 199603,55919.55$0
Jun 199603,54218.73$0
May 199603,85619.43$0
Apr 199603,84321.51$0
Mar 199604,30319.38$0
Feb 199604,46816.98$0
Jan 199604,28917.07$0
Dec 199505,33417.19$0
Nov 199505,33716.00$0
Oct 199505,51215.43$0
Sep 199505,37416.18$0
Aug 199505,85815.92$0
Jul 199506,06315.24$0
Jun 199503,99216.41$0
May 199502,70017.56$0
Apr 199502,77117.73$0
Mar 199502,52816.44$0
Feb 199502,04216.58$0
Jan 199503,67115.92$0
Dec 199402,57715.03$0
Nov 199403,25815.90$0
Oct 199403,89815.58$0
Sep 199403,29815.29$0
Aug 199403,24416.13$0
Jul 199402,57317.56$0
Jun 199402,89317.09$0
May 199402,86215.88$0
Apr 199403,27414.14$0
Mar 199403,59012.46$0
Feb 199402,78112.50$0
Jan 199403,11112.66$0
Dec 199303,44012.33$0
Nov 199303,25914.49$0
Oct 199303,73715.85$0
Sep 199303,86015.03$0
Aug 199303,67515.66$0
Jul 199304,60415.46$0
Jun 199304,56316.79$0
May 199304,26217.68$0
Apr 199303,10718.05$0
Mar 1993783,20618.14$1,415
Feb 199303,34017.90$0
Jan 199303,94916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 34.90 =         $0
Gas                  478 Mcf  × $  1.69 =       $808

────────────────────────────────────────────────────
Month total                                     $808

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/73706 is the state's own key, not one this site invented.