Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the WASKOM (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 94111District 06Field 95369160NGPA filingCondensateGasSaveExport
Value, all time
$870 k
Jan 1993 – Oct 2009
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
202
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 473 leases and 477 wells, and the rule below applies to all of them.

Discovered
1955-09-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-11-06.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition657 bbl$13,799
GasProduction343,832 Mcf$855,733
Total$869,532

136,909 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4899, -94.1083. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.48987, -94.10831 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,550 ft
1 wells filed one
Completion to plug
27.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,550 ft.

Completions filed
Mar 1981
1 of 1 wells
Plug dates filed
Apr 2008
1 of 1 wells

Last completion to plug: a median of 27.1 years across the 1 well that filed both dates, with the middle half between 27.1 years and 27.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2033080149,550 ftMar 1981Apr 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (202)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

202 months

Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 200963046.773.59$2,947
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 2006077566.286.38$4,948
May 2006093566.016.42$6,007
Apr 2006098064.397.36$7,213
Mar 2006080556.707.08$5,702
Feb 2006075757.597.75$5,868
Jan 2006079460.598.93$7,093
Dec 2005079954.9413.42$10,719
Nov 2005090554.6910.59$9,583
Oct 2005091758.3413.80$12,651
Sep 2005090761.4512.08$10,956
Aug 2005099561.519.80$9,748
Jul 2005086155.697.84$6,753
Jun 200501,09452.337.38$8,075
May 200501,20745.226.65$8,028
Apr 200501,11449.207.36$8,200
Mar 200501,23950.377.15$8,865
Feb 200501,09545.226.31$6,912
Jan 200501,04743.166.32$6,619
Dec 200401,30339.866.75$8,797
Nov 200401,33845.286.33$8,470
Oct 200401,46449.706.52$9,538
Sep 200401,54543.245.28$8,164
Aug 200401,54342.375.55$8,565
Jul 200401,83338.286.08$11,152
Jun 200402,03636.106.43$13,098
May 200402,35237.486.49$15,275
Apr 200402,05334.475.86$12,027
Mar 200401,38034.365.53$7,632
Feb 200401,41332.455.51$7,785
Jan 200401,43832.036.30$9,059
Dec 200301,37130.266.30$8,640
Nov 2003095328.804.60$4,379
Oct 200301,56428.174.76$7,444
Sep 200301,50126.314.75$7,129
Aug 200301,59529.765.13$8,182
Jul 200301,65629.415.17$8,563
Jun 200301,56428.565.98$9,357
May 200301,62626.595.97$9,712
Apr 200301,62026.675.41$8,760
Mar 200301,56131.146.10$9,516
Feb 200301,47733.487.93$11,707
Jan 200301,43130.315.58$7,988
Dec 200201,71726.914.85$8,334
Nov 200201,61324.664.14$6,673
Oct 200201,57226.464.23$6,648
Sep 200211,62427.443.64$5,931
Aug 200201,91425.963.16$6,056
Jul 200201,91824.583.06$5,872
Jun 200201,63523.733.34$5,458
May 200202,20224.663.58$7,892
Apr 200202,19523.653.51$7,710
Mar 200201,87622.003.10$5,821
Feb 2002332,05818.222.38$5,490
Jan 200202,31817.172.38$5,507
Dec 200102,50416.932.36$5,920
Nov 200102,60018.072.41$6,254
Oct 200102,24819.782.53$5,685
Sep 200102,44024.262.25$5,493
Aug 2001282,32824.873.05$7,804
Jul 200103,01623.933.20$9,642
Jun 200102,74724.563.82$10,505
May 200102,99125.524.31$12,883
Apr 200102,92024.685.34$15,579
Mar 200102,78224.545.38$14,957
Feb 200102,80427.755.77$16,171
Jan 200101,66627.478.40$13,992
Dec 200001,67026.889.12$15,235
Nov 200002,34532.215.66$13,268
Oct 200042,72831.235.15$14,162
Sep 200032,50231.875.19$13,072
Aug 200052,58629.644.54$11,891
Jul 200022,79128.534.09$11,472
Jun 200072,82729.304.40$12,636
May 200053,02327.263.68$11,260
Apr 2000313,02924.513.12$10,198
Mar 200012,70228.422.86$7,755
Feb 200001,15927.622.73$3,160
Jan 200001,32725.272.48$3,292
Dec 199901,39524.282.42$3,381
Nov 199901,51123.192.43$3,678
Oct 19991041,73220.982.80$7,038
Sep 199901,21921.752.62$3,192
Aug 199901,52719.262.88$4,391
Jul 199901,56217.892.37$3,706
Jun 199901,54615.942.36$3,652
May 199901,45215.792.32$3,370
Apr 199901,62515.102.21$3,588
Mar 199961,81212.471.84$3,406
Feb 199901,4959.981.82$2,718
Jan 1999191,85910.381.90$3,729
Dec 199802,4269.201.77$4,302
Nov 199801,52310.892.19$3,329
Oct 199801,62512.421.97$3,200
Sep 199801,66312.592.08$3,463
Aug 199801,95511.301.91$3,729
Jul 199801,72811.742.24$3,866
Jun 199801,78611.242.24$3,996
May 1998581,90312.622.21$4,931
Apr 199802,04313.042.51$5,118
Mar 199802,42712.802.31$5,605
Feb 199801,94413.952.30$4,470
Jan 199801,90614.702.15$4,107
Dec 199701,23216.322.41$2,970
Nov 199701,30618.193.09$4,033
Oct 199701,98819.253.15$6,262
Sep 199702,03317.742.95$6,007
Aug 199702,05617.862.55$5,253
Jul 19971232,48217.582.25$7,739
Jun 199712,47217.242.26$5,597
May 199702,50818.972.31$5,790
Apr 199702,40917.882.08$5,017
Mar 199702,99818.951.94$5,814
Feb 199703,16720.492.21$6,986
Jan 199703,38823.483.54$11,993
Dec 199602,57623.32$0
Nov 199612,78221.97$22
Oct 199612,74623.31$23
Sep 199603,37922.22$0
Aug 199603,47820.26$0
Jul 199603,40619.55$0
Jun 199603,03518.73$0
May 199603,28319.43$0
Apr 199602,74221.51$0
Mar 199602,85619.38$0
Feb 199612,88416.98$17
Jan 199603,44217.07$0
Dec 199503,60117.19$0
Nov 199503,41816.00$0
Oct 199503,50215.43$0
Sep 199501,47816.18$0
Aug 199501,44615.92$0
Jul 199501,46215.24$0
Jun 199501,34516.41$0
May 199521,39617.56$35
Apr 199501,49217.73$0
Mar 199501,51816.44$0
Feb 199501,23216.58$0
Jan 199501,46015.92$0
Dec 199401,54915.03$0
Nov 199401,64515.90$0
Oct 199401,89715.58$0
Sep 199402,16415.29$0
Aug 199401,48916.13$0
Jul 199401,91717.56$0
Jun 199403,35417.09$0
May 19941586,47615.88$2,509
Apr 1994032814.14$0
Mar 19940012.46$0
Feb 199403,38212.50$0
Jan 199403,78612.66$0
Dec 199303,78212.33$0
Nov 199303,92114.49$0
Oct 199304,58415.85$0
Sep 199304,24615.03$0
Aug 199303,92115.66$0
Jul 199304,16615.46$0
Jun 199304,08416.79$0
May 199304,59317.68$0
Apr 199303,98918.05$0
Mar 199304,16318.14$0
Feb 199303,50917.90$0
Jan 199304,00516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2009 — as filed, then multipliedworked
Condensate            63 bbl  × $ 46.77 =     $2,947
Gas                    0 Mcf  × $  3.59 =         $0

────────────────────────────────────────────────────
Month total                                   $2,947

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/94111 is the state's own key, not one this site invented.