GARRISON, BLOUNT

Operated by HEREFORD, J. A. INDUSTRIES, INC. (P-5 379753) in the NACOGDOCHES field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 10047District 06Field 64296001OilCasinghead gasSaveExport
Value, all time
$577 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 82 leases and 637 wells, and the rule below applies to all of them.

Discovered
1866-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
75 ft
minimum

A drilling unit in this field needs at least 1 acres. The field rule took effect on 1967-08-04.

The Commission's schedule remark for this field reads: ESTABLISHED AS 100'-400'

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,614 bbl$577,218
Casinghead gasProduction116 Mcf$250
Total$577,468

44 Mcf of this lease's gas, across 44 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (26)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4701, -94.4638. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

31.46932, -94.46368 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
26 of 26 wells
With a plug date
100.0%
26 of 26 wells
Median depth
332 ft
25 wells filed one
Completion to plug
40.4 years
median over 22 wells

What the state filed about each well

On the RRC proration schedule
26100.0%
A plug date is filed
26100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
26100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 25 of 26 wells. Median 332 ft, with the middle half between 305 and 354 ft; the shallowest is 248 ft and the deepest 634 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 22 of 26 wells, May 1978 – Mar 1986. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
May 1978 – Mar 1986
22 of 26 wells; 4 filed none
Plug dates filed
Aug 2022
26 of 26 wells

Last completion to plug: a median of 40.4 years across the 22 wells that filed both dates, with the middle half between 39.3 years and 41.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

26 wells

42-3478005422360 ftAug 2022Yes
42-3478005523Aug 2022Yes
42-3478005624360 ftAug 2022Yes
42-3478005726354 ftAug 2022Yes
42-3473113443344 ftMar 1986Aug 2022Yes
42-3473113045248 ftSep 1984Aug 2022Yes
42-3473113244269 ftApr 1984Aug 2022Yes
42-3473060035320 ftJul 1983Aug 2022Yes
42-3473049817294 ftMay 1983Aug 2022Yes
42-3473059230357 ftMay 1983Aug 2022Yes
42-3473050121333 ftMay 1983Aug 2022Yes
42-3473049516361 ftMay 1983Aug 2022Yes
42-3473049919312 ftApr 1983Aug 2022Yes
42-3473059833312 ftApr 1982Aug 2022Yes
42-3473060742332 ftMar 1982Aug 2022Yes
42-3473060540330 ftMar 1982Aug 2022Yes
42-3473060237335 ftNov 1981Aug 2022Yes
42-3473059329340 ftAug 1981Aug 2022Yes
42-3473050020634 ftJun 1981Aug 2022Yes
42-3473051827343 ftApr 1981Aug 2022Yes
42-3473051725305 ftMar 1981Aug 2022Yes
42-3473049418305 ftJul 1980Aug 2022Yes
42-347304299288 ftJul 1978Aug 2022Yes
42-347304146280 ftJun 1978Aug 2022Yes
42-347304162273 ftMay 1978Aug 2022Yes
42-347304081374 ftMay 1978Aug 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 2018107065.382.90$6,996
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 2016133045.352.69$6,032
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 2013175091.603.42$16,030
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 201258094.672.92$5,491
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 20121880101.652.00$19,110
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 2011173084.983.65$14,702
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 2011139092.904.64$12,913
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 2011183096.364.06$17,634
Feb 20110085.644.18$0
Jan 2011165086.504.59$14,273
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 2010185073.684.42$13,631
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 2010178071.124.24$12,659
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 2010180073.585.44$13,244
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 2009177074.593.75$13,202
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009185067.423.22$12,473
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 2009173054.743.93$9,470
Apr 2009181046.773.59$8,465
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 20081680131.3313.03$22,063
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 20081650101.909.66$16,814
Feb 20080092.538.77$0
Jan 2008107090.388.21$9,671
Dec 20070088.337.30$0
Nov 2007183091.677.29$16,776
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 2007182069.066.39$12,569
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 2007188058.747.85$11,043
Apr 20070059.617.81$0
Mar 2007196056.927.30$11,156
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 2006161054.906.01$8,839
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 2006123069.376.34$8,533
Jun 2006169066.286.38$11,201
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 2006165056.707.08$9,356
Feb 20060057.597.75$0
Jan 200697060.598.93$5,877
Dec 20050054.9413.42$0
Nov 2005131054.6910.59$7,164
Oct 20050058.3413.80$0
Sep 2005140061.4512.08$8,603
Aug 20050061.519.80$0
Jul 2005107055.697.84$5,959
Jun 20050052.337.38$0
May 2005133045.226.65$6,014
Apr 20050049.207.36$0
Mar 2005123050.377.15$6,196
Feb 20050045.226.31$0
Jan 2005169043.166.32$7,294
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 2004122049.706.52$6,063
Sep 20040043.245.28$0
Aug 2004181042.375.55$7,669
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 2004102037.486.49$3,823
Apr 20040034.475.86$0
Mar 2004113034.365.53$3,883
Feb 20040032.455.51$0
Jan 200473032.036.30$2,338
Dec 2003160030.266.30$4,842
Nov 20030028.804.60$0
Oct 2003123028.174.76$3,465
Sep 20030026.314.75$0
Aug 2003163029.765.13$4,851
Jul 20030029.415.17$0
Jun 200394128.565.98$2,691
May 20030126.595.97$6
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 2003116133.487.93$3,892
Jan 20030130.315.58$6
Dec 20020126.914.85$5
Nov 2002136124.664.14$3,358
Oct 20020126.464.23$4
Sep 200240127.443.64$1,101
Aug 200245125.963.16$1,171
Jul 200295124.583.06$2,338
Jun 20020123.733.34$3
May 2002125124.663.58$3,086
Apr 20020123.653.51$4
Mar 200285122.003.10$1,873
Feb 20020118.222.38$2
Jan 20020117.172.38$2
Dec 2001101116.932.36$1,712
Nov 20010118.072.41$2
Oct 200169119.782.53$1,367
Sep 2001105124.262.25$2,550
Aug 20010124.873.05$3
Jul 200159123.933.20$1,415
Jun 2001111124.563.82$2,730
May 20010125.524.31$4
Apr 200166124.685.34$1,634
Mar 20010124.545.38$5
Feb 200166127.755.77$1,837
Jan 200191127.478.40$2,508
Dec 20000126.889.12$9
Nov 2000117132.215.66$3,774
Oct 20000131.235.15$5
Sep 200096131.875.19$3,065
Aug 200071129.644.54$2,109
Jul 2000124128.534.09$3,542
Jun 20000129.304.40$4
May 2000112127.263.68$3,057
Apr 20000124.513.12$3
Mar 200060128.422.86$1,708
Feb 2000151127.622.73$4,173
Jan 20000125.272.48$2
Dec 19990124.282.42$2
Nov 199966123.192.43$1,533
Oct 199983120.982.80$1,744
Sep 199980121.752.62$1,743
Aug 1999122119.262.88$2,353
Jul 19990117.892.37$2
Jun 1999159115.942.36$2,537
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 1999146112.471.84$1,822
Feb 1999019.981.82$2
Jan 1999183110.381.90$1,901
Dec 1998019.201.77$2
Nov 19980110.892.19$2
Oct 19980112.421.97$2
Sep 199887112.592.08$1,097
Aug 199870111.301.91$793
Jul 1998114111.742.24$1,341
Jun 1998152111.242.24$1,711
May 19980112.622.21$2
Apr 19980113.042.51$3
Mar 1998137112.802.31$1,756
Feb 199873113.952.30$1,021
Jan 19980114.702.15$2
Dec 1997127116.322.41$2,075
Nov 199775118.193.09$1,367
Oct 19970119.253.15$3
Sep 199798117.742.95$1,741
Aug 199787117.862.55$1,556
Jul 199784117.582.25$1,479
Jun 199740017.242.26$690
May 199779018.972.31$1,499
Apr 199763017.882.08$1,126
Mar 199774018.951.94$1,402
Feb 199770020.492.21$1,434
Jan 199771023.483.54$1,667
Dec 199674023.32$1,726
Nov 199689021.97$1,955
Oct 199693023.31$2,168
Sep 199661022.22$1,355
Aug 199685120.26$1,722
Jul 199654119.55$1,056
Jun 199696118.73$1,798
May 1996125119.43$2,429
Apr 19960121.51$0
Mar 199675119.38$1,454
Feb 199678116.98$1,324
Jan 199674117.07$1,263
Dec 199581117.19$1,392
Nov 199582116.00$1,312
Oct 199582115.43$1,265
Sep 199581116.18$1,311
Aug 199566115.92$1,051
Jul 199576115.24$1,158
Jun 199577116.41$1,264
May 199567117.56$1,177
Apr 199574117.73$1,312
Mar 199581116.44$1,332
Feb 199572116.58$1,194
Jan 1995132115.92$2,101
Dec 19940115.03$0
Nov 199488115.90$1,399
Oct 199482115.58$1,278
Sep 199493115.29$1,422
Aug 199487116.13$1,403
Jul 1994108117.56$1,896
Jun 199486117.09$1,470
May 1994100115.88$1,588
Apr 199487114.14$1,230
Mar 19940112.46$0
Feb 199497112.50$1,213
Jan 199480112.66$1,013
Dec 199377112.33$949
Nov 199364114.49$927
Oct 199388115.85$1,395
Sep 199394115.03$1,413
Aug 199366115.66$1,034
Jul 199378115.46$1,206
Jun 199382116.79$1,377
May 1993159117.68$2,811
Apr 19930118.05$0
Mar 199399118.14$1,796
Feb 1993150117.90$2,685
Jan 199375116.93$1,270

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2018 — as filed, then multipliedworked
Oil                  107 bbl  × $ 65.38 =     $6,996
Casinghead gas         0 Mcf  × $  2.90 =         $0

────────────────────────────────────────────────────
Month total                                   $6,996

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/10047 is the state's own key, not one this site invented.