CAMPBELL, MIKE OIL UNIT

Operated by J-W OPERATING CO. (P-5 427960) in the CHAPEL HILL (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11465District 06Field 17008777NGPA filingOilCasinghead gasSaveExport
Value, all time
$252 k
Jan 1993 – May 2012
Value, last 12 filed months
$0
at the published price for each month
Months reported
233
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 127 leases and 167 wells, and the rule below applies to all of them.

Discovered
1966-12-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1981-10-05.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED ADMINISTRATIVELY EFF. 8-1-92.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition10,612 bbl$198,321
Casinghead gasProduction35,954 Mcf$53,198
Total$251,519

18,930 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3000, -95.1097. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.29996, -95.10969 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,402 ft
1 wells filed one
Completion to plug
27.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,402 ft.

Completions filed
Aug 1984
1 of 1 wells
Plug dates filed
Apr 2012
1 of 1 wells

Last completion to plug: a median of 27.7 years across the 1 well that filed both dates, with the middle half between 27.7 years and 27.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4233082018,402 ftAug 1984Apr 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (233)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

233 months

May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 2009118054.743.93$6,459
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020823.653.51$28
Mar 200205222.003.10$161
Feb 200207018.222.38$166
Jan 200204017.172.38$95
Dec 2001018816.932.36$445
Nov 200118527018.072.41$3,992
Oct 2001029719.782.53$751
Sep 2001028924.262.25$651
Aug 200119329624.873.05$5,704
Jul 2001025023.933.20$799
Jun 200118129524.563.82$5,573
May 2001031525.524.31$1,357
Apr 2001028624.685.34$1,526
Mar 200119233724.545.38$6,524
Feb 2001030027.755.77$1,730
Jan 200119427327.478.40$7,622
Dec 2000125326.889.12$2,335
Nov 2000025932.215.66$1,465
Oct 200019130231.235.15$7,519
Sep 2000031331.875.19$1,623
Aug 200019031129.644.54$7,044
Jul 2000031828.534.09$1,301
Jun 2000232729.304.40$1,497
May 200017832627.263.68$6,052
Apr 2000024924.513.12$776
Mar 200018132128.422.86$6,062
Feb 2000029527.622.73$804
Jan 200018628925.272.48$5,417
Dec 1999032224.282.42$780
Nov 199919032223.192.43$5,190
Oct 1999028120.982.80$788
Sep 1999023721.752.62$621
Aug 199919425019.262.88$4,455
Jul 1999024317.892.37$576
Jun 199919024515.942.36$3,607
May 1999027315.792.32$634
Apr 199917027215.102.21$3,168
Mar 1999028812.471.84$529
Feb 199902639.981.82$478
Jan 199919631010.381.90$2,623
Dec 199803299.201.77$583
Nov 199819129310.892.19$2,720
Oct 199818132412.421.97$2,886
Sep 1998022312.592.08$464
Aug 1998027111.301.91$517
Jul 199817828311.742.24$2,723
Jun 1998027811.242.24$622
May 199819027012.622.21$2,994
Apr 1998025213.042.51$631
Mar 199818926712.802.31$3,036
Feb 1998028213.952.30$648
Jan 199818720214.702.15$3,184
Dec 1997027616.322.41$665
Nov 199718420818.193.09$3,989
Oct 1997033919.253.15$1,068
Sep 199718327017.742.95$4,044
Aug 1997029617.862.55$756
Jul 199716324917.582.25$3,425
Jun 1997026917.242.26$607
May 1997028218.972.31$651
Apr 199717930017.882.08$3,825
Mar 199718829818.951.94$4,140
Feb 1997125120.492.21$574
Jan 199718427723.483.54$5,301
Dec 1996229523.32$47
Nov 199618930421.97$4,152
Oct 1996330023.31$70
Sep 199618530522.22$4,111
Aug 1996229420.26$41
Jul 199618426819.55$3,597
Jun 199618328418.73$3,428
May 1996229519.43$39
Apr 199619228821.51$4,130
Mar 1996232419.38$39
Feb 199619230216.98$3,260
Jan 1996132617.07$17
Dec 199518336417.19$3,146
Nov 1995229416.00$32
Oct 199518539915.43$2,855
Sep 199518733816.18$3,026
Aug 1995230315.92$32
Jul 199519036115.24$2,896
Jun 1995336716.41$49
May 199518940017.56$3,319
Apr 1995037517.73$0
Mar 199519437316.44$3,189
Feb 199518233916.58$3,018
Jan 199519036515.92$3,025
Dec 1994134915.03$15
Nov 199418833315.90$2,989
Oct 1994134215.58$16
Sep 199419234715.29$2,936
Aug 1994238316.13$32
Jul 199419236817.56$3,372
Jun 199418434317.09$3,145
May 1994235315.88$32
Apr 199418637214.14$2,630
Mar 1994330912.46$37
Feb 199420330212.50$2,538
Jan 1994233612.66$25
Dec 199318633612.33$2,293
Nov 199318733914.49$2,710
Oct 199319539515.85$3,091
Sep 1993341315.03$45
Aug 199317639315.66$2,756
Jul 1993349915.46$46
Jun 199318754416.79$3,140
May 199318756117.68$3,306
Apr 1993584018.05$90
Mar 199319386118.14$3,501
Feb 199318697717.90$3,329
Jan 199317477216.93$2,946

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2009 — as filed, then multipliedworked
Oil                  118 bbl  × $ 54.74 =     $6,459
Casinghead gas         0 Mcf  × $  3.93 =         $0

────────────────────────────────────────────────────
Month total                                   $6,459

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/11465 is the state's own key, not one this site invented.