TAYLOR, SUSAN

Operated by GMX RESOURCES INC. (P-5 311408) in the BETHANY (TRAVIS PEAK A SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11748District 06Field 07527713OilCasinghead gasSaveExport
Value, all time
$879 k
Jan 1993 – Jun 2008
Value, last 12 filed months
$103 k
at the published price for each month
Months reported
186
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 23 leases and 38 wells, and the rule below applies to all of them.

Discovered
1959-01-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1987-12-01.

The Commission's schedule remark for this field reads: TRANSFERRED TO BETHANY (TRAVIS PEAK CONS.)

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition33,856 bbl$879,113
Casinghead gasProduction145 Mcf$381
Total$879,494

47 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4182, -94.2526. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.41824, -94.25256 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,674 ft
1 wells filed one
Completion to plug
26.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,674 ft.

Completions filed
Jun 1985
1 of 1 wells
Plug dates filed
Feb 2012
1 of 1 wells

Last completion to plug: a median of 26.7 years across the 1 well that filed both dates, with the middle half between 26.7 years and 26.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2033122216,674 ftJun 1985Feb 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (186)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

186 months

Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 2007517088.337.30$45,667
Nov 2007188091.677.29$17,234
Oct 2007185082.856.92$15,327
Sep 20070075.846.24$0
Aug 2007177069.066.39$12,224
Jul 2007183070.906.39$12,975
Jun 2007180062.007.55$11,160
May 2007177058.747.85$10,397
Apr 20070059.617.81$0
Mar 2007188056.927.30$10,701
Feb 2007180055.108.22$9,918
Jan 20070050.306.73$0
Dec 2006182056.656.92$10,310
Nov 2006177054.207.62$9,593
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 2006178068.717.34$12,230
Jul 2006185069.376.34$12,833
Jun 2006196066.286.38$12,991
May 20060066.016.42$0
Apr 2006184064.397.36$11,848
Mar 2006189056.707.08$10,716
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 2005187054.9413.42$10,274
Nov 2005186054.6910.59$10,172
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050145.226.31$6
Jan 2005184143.166.32$7,948
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 2004301143.245.28$13,021
Aug 2004183142.375.55$7,759
Jul 20040138.286.08$6
Jun 2004189136.106.43$6,829
May 2004188137.486.49$7,053
Apr 2004189134.475.86$6,521
Mar 2004189134.365.53$6,500
Feb 2004188132.455.51$6,106
Jan 2004181132.036.30$5,804
Dec 20030130.266.30$6
Nov 2003184128.804.60$5,304
Oct 2003372128.174.76$10,484
Sep 20030126.314.75$5
Aug 2003370129.765.13$11,016
Jul 20030129.415.17$5
Jun 2003189128.565.98$5,404
May 2003184126.595.97$4,899
Apr 20030126.675.41$5
Mar 2003190131.146.10$5,923
Feb 2003364133.487.93$12,195
Jan 20030130.315.58$6
Dec 2002188126.914.85$5,064
Nov 2002194124.664.14$4,788
Oct 20020126.464.23$4
Sep 2002352127.443.64$9,663
Aug 2002183125.963.16$4,754
Jul 20020124.583.06$3
Jun 2002386123.733.34$9,163
May 2002188124.663.58$4,640
Apr 2002193123.653.51$4,568
Mar 2002184122.003.10$4,051
Feb 2002183118.222.38$3,337
Jan 2002179117.172.38$3,076
Dec 2001183116.932.36$3,101
Nov 2001374118.072.41$6,761
Oct 2001188119.782.53$3,721
Sep 2001181124.262.25$4,393
Aug 2001186124.873.05$4,629
Jul 2001181123.933.20$4,335
Jun 2001364124.563.82$8,944
May 20010125.524.31$4
Apr 2001184124.685.34$4,546
Mar 2001365124.545.38$8,962
Feb 2001159127.755.77$4,418
Jan 2001178127.478.40$4,898
Dec 2000178126.889.12$4,794
Nov 2000364132.215.66$11,730
Oct 20000131.235.15$5
Sep 2000357131.875.19$11,383
Aug 2000184129.644.54$5,458
Jul 2000184128.534.09$5,254
Jun 2000362129.304.40$10,611
May 20000127.263.68$4
Apr 2000355124.513.12$8,704
Mar 2000181128.422.86$5,147
Feb 2000352127.622.73$9,725
Jan 2000181125.272.48$4,576
Dec 1999349124.282.42$8,476
Nov 1999159123.192.43$3,690
Oct 1999189120.982.80$3,968
Sep 1999340121.752.62$7,398
Aug 1999186119.262.88$3,585
Jul 1999179117.892.37$3,205
Jun 1999184115.942.36$2,935
May 1999179115.792.32$2,829
Apr 1999188115.102.21$2,841
Mar 1999562112.471.84$7,010
Feb 1999019.981.82$2
Jan 1999369110.381.90$3,832
Dec 199819319.201.77$1,777
Nov 1998183110.892.19$1,995
Oct 1998367112.421.97$4,560
Sep 1998183112.592.08$2,306
Aug 1998183111.301.91$2,070
Jul 1998190111.742.24$2,233
Jun 1998315111.242.24$3,543
May 1998366112.622.21$4,621
Apr 1998357113.042.51$4,658
Mar 19980112.802.31$2
Feb 1998189113.952.30$2,639
Jan 1998553114.702.15$8,131
Dec 1997337116.322.41$5,502
Nov 1997193118.193.09$3,514
Oct 19970119.253.15$3
Sep 1997185117.742.95$3,285
Aug 1997196117.862.55$3,503
Jul 1997352117.582.25$6,190
Jun 1997189117.242.26$3,261
May 1997386118.972.31$7,325
Apr 1997381117.882.08$6,814
Mar 1997338118.951.94$6,407
Feb 1997723120.492.21$14,816
Jan 19970123.483.54$4
Dec 1996188123.32$4,384
Nov 19960121.97$0
Oct 1996348123.31$8,112
Sep 1996377122.22$8,377
Aug 1996381120.26$7,719
Jul 1996337119.55$6,588
Jun 1996378118.73$7,080
May 1996381119.43$7,403
Apr 1996378121.51$8,131
Mar 1996352119.38$6,822
Feb 19960116.98$0
Jan 1996189117.07$3,226
Dec 1995189117.19$3,249
Nov 1995188116.00$3,008
Oct 1995189115.43$2,916
Sep 1995190116.18$3,074
Aug 1995190115.92$3,025
Jul 19950115.24$0
Jun 19950116.41$0
May 19950117.56$0
Apr 1995380117.73$6,737
Mar 19950116.44$0
Feb 19950116.58$0
Jan 19950115.92$0
Dec 1994190115.03$2,856
Nov 1994360115.90$5,724
Oct 19940015.58$0
Sep 1994358115.29$5,474
Aug 1994188116.13$3,032
Jul 1994176117.56$3,091
Jun 1994172117.09$2,939
May 1994172115.88$2,731
Apr 1994186114.14$2,630
Mar 1994190112.46$2,367
Feb 1994189112.50$2,363
Jan 1994186112.66$2,355
Dec 1993199112.33$2,454
Nov 1993214114.49$3,101
Oct 1993392115.85$6,213
Sep 19930115.03$0
Aug 1993371115.66$5,810
Jul 1993175115.46$2,706
Jun 1993377116.79$6,330
May 19930117.68$0
Apr 1993374118.05$6,751
Mar 1993193118.14$3,501
Feb 1993187117.90$3,347
Jan 1993374116.93$6,332

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2007 — as filed, then multipliedworked
Oil                  517 bbl  × $ 88.33 =    $45,667
Casinghead gas         0 Mcf  × $  7.30 =         $0

────────────────────────────────────────────────────
Month total                                  $45,667

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/11748 is the state's own key, not one this site invented.