WILLIAMS, E. "A"

Operated by SCHLACHTER OPERATING CORPORATION (P-5 753981) in the CHAPEL HILL (RODESSA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11955District 06Field 17008444OilCasinghead gasSaveExport
Value, all time
$169 k
Jan 1993 – Mar 2001
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
99
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 93 leases and 96 wells, and the rule below applies to all of them.

Discovered
1941-07-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED ADMINISTRATIVELY EFF. 9-1-92.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,395 bbl$108,111
Casinghead gasProduction207,437 Mcf$61,263
Total$169,374

181,575 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3184, -95.1044. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.31836, -95.10438 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,437 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,437 ft.

Completions filed
Feb 2003
1 of 1 wells

1 well

42-4233054718,437 ftFeb 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (99)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

99 months

Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 200145027.478.40$1,236
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 2000054327.622.73$1,480
Jan 2000059225.272.48$1,468
Dec 1999052524.282.42$1,272
Nov 1999054923.192.43$1,336
Oct 1999062620.982.80$1,755
Sep 1999057621.752.62$1,508
Aug 1999069619.262.88$2,001
Jul 1999065617.892.37$1,556
Jun 1999058715.942.36$1,387
May 1999064915.792.32$1,506
Apr 1999040115.102.21$885
Mar 1999051712.471.84$950
Feb 199905219.981.82$947
Jan 1999061910.381.90$1,176
Dec 199806389.201.77$1,131
Nov 1998070110.892.19$1,532
Oct 1998065112.421.97$1,282
Sep 199810661612.592.08$2,617
Aug 1998172111.301.91$1,387
Jul 1998073311.742.24$1,640
Jun 1998168911.242.24$1,553
May 1998076212.622.21$1,681
Apr 1998084313.042.51$2,112
Mar 1998187412.802.31$2,031
Feb 19985975713.952.30$2,563
Jan 1998189914.702.15$1,952
Dec 199716280616.322.41$4,587
Nov 1997075918.193.09$2,344
Oct 1997280219.253.15$2,565
Sep 19977579217.742.95$3,671
Aug 1997381817.862.55$2,143
Jul 19971977717.582.25$2,080
Jun 1997280717.242.26$1,856
May 19976180118.972.31$3,006
Apr 19976180217.882.08$2,761
Mar 19979665118.951.94$3,082
Feb 1997156220.492.21$1,260
Jan 19974654423.483.54$3,006
Dec 19962162623.32$490
Nov 1996334621.97$66
Oct 19961222,09223.31$2,844
Sep 19961752,31622.22$3,889
Aug 19961192,61820.26$2,411
Jul 19961212,89919.55$2,366
Jun 19961041,72018.73$1,948
May 19961222,32919.43$2,370
Apr 19961213,73021.51$2,603
Mar 19961253,71719.38$2,423
Feb 19961143,95916.98$1,936
Jan 19961243,92717.07$2,117
Dec 19951253,86217.19$2,149
Nov 19951203,35916.00$1,920
Oct 19951202,95715.43$1,852
Sep 19951203,47416.18$1,942
Aug 19951213,74515.92$1,926
Jul 19951203,62715.24$1,829
Jun 19951183,74616.41$1,936
May 19951204,13517.56$2,107
Apr 19951354,06617.73$2,394
Mar 19951243,90316.44$2,039
Feb 19951123,54716.58$1,857
Jan 19951203,94715.92$1,910
Dec 19941203,86415.03$1,804
Nov 19941204,00715.90$1,908
Oct 19941203,82615.58$1,870
Sep 19941214,24115.29$1,850
Aug 19941214,63516.13$1,952
Jul 19941203,42617.56$2,107
Jun 19941203,60917.09$2,051
May 19941203,54815.88$1,906
Apr 19941204,53014.14$1,697
Mar 19942454,13612.46$3,053
Feb 19941203,89112.50$1,500
Jan 19941204,47412.66$1,519
Dec 199304,76612.33$0
Nov 19931204,61414.49$1,739
Oct 19931254,37415.85$1,981
Sep 19931204,52715.03$1,804
Aug 19931255,35615.66$1,958
Jul 19931245,61015.46$1,917
Jun 19931155,48416.79$1,931
May 19931202,59417.68$2,122
Apr 19931505,36618.05$2,708
Mar 19931245,29118.14$2,249
Feb 19931125,04317.90$2,005
Jan 19931255,71616.93$2,116

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2001 — as filed, then multipliedworked
Oil                   45 bbl  × $ 27.47 =     $1,236
Casinghead gas         0 Mcf  × $  8.40 =         $0

────────────────────────────────────────────────────
Month total                                   $1,236

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/11955 is the state's own key, not one this site invented.